ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / The Cliff Garden

Completed No litigation declared Residential / Group Housing project

The Cliff Garden

By VH Township Private Limited

RG-MH-19827 · RERA P52100004906 · Last updated on MahaRERA portal: 18 Aug 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

The Cliff Garden is a Residential / Group Housing project by VH Township Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100004906 on 9 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameThe Cliff Garden
  • TypeResidential / Group Housing
  • Location
    • MIDC Phase 3
    • Maan
    • Hinjawadi
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004906
  • ReraGenie IDRG-MH-19827

Builder

  • NameVH Township Private Limited
  • Entity typeCompany
  • CINU45400MH2007PTC171668
  • DirectorsPrasanta Kumar Biswal, Sanjay Darolia
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WingNA160000
C WingNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

B Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 18 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Underground water tanks and pumpsYes100%

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34
BuildingClosed/CoveredTotal
B Wing1616
C Wing1818

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,419 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12417.68
Proposed, not sanctioned12,418 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Maneckji Wadia Bldg Nanik Motwani Marg Fort Mumbai 400 001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV K : a Architecture
EngineerB G Shirkee Construction Technology Pvt. Ltd.,
PartnerRole in project
VH Township Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jul 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Dec 2019

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: VHTPL_Intimation_conveyance update_BC - 18 Aug 2021.pdf18 Aug 2021
Disclosure of sold/ booked inventoryFile: RERA Sold Unsold - BC - 20May21.pdf25 May 2021
Status of ConveyanceFile: Deed of Apartment - Status - 02Dec2020 - BC.pdf3 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - VHTPL - RERA Mar20 BC Report - 30Sep20.pdf30 Sep 2020
Copy of the legal title reportFile: Title Opinion VHTPL (13 June 2020).pdf8 Jul 2020
Copy of the legal title reportFile: Title Certificate VHTPL (13 June 2020).pdf8 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - BC_BW.pdf20 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - VHTPL B C Engineer's Certificate.pdf20 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A - B C -Quality Assurance -Engineers's Certificate for RERA.pdf20 Mar 2020
Certificates of CA (Form 3)File: Form 3 - VHTPL CA Certificate Final 311219 BC signed BW.pdf20 Mar 2020
Status of ConveyanceFile: Deed of Apartment - Status - 29Feb2020 - BC.pdf3 Mar 2020
Proforma of Allotment letterFile: Agreement for Wing B C VHTPL Revised 27 Feb 2020 -clean.pdf28 Feb 2020
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - BC.pdf4 Feb 2020
Status of ConveyanceFile: Deed of Apartment - Status - 24Jan2020 - BC.pdf24 Jan 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: AoA Status - BC.pdf22 Jan 2020
Copy of the legal title reportFile: Title Opinion VHTPL (3 Jan 2020)_BW.pdf13 Jan 2020
Copy of the legal title reportFile: Title Certificate VHTPL (3 Jan 2020).pdf13 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Form -2A - B C - Quality Assurance -Engineers Certificate for RERA.pdf2 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - B C - 30092019.pdf2 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 191015 - RERA Certificate For BC_BW.pdf23 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - BC.pdf23 Dec 2019
Certificates of CA (Form 3)File: VHTPL CA Cert B C_Sep19_signed BW.pdf23 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate MIDC VHTPL Phase 1.pdf23 Dec 2019
Certificates of CA (Form 5)File: VHTPL-4906.pdf30 Sep 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A - BC Wing_BW.pdf16 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - BC- April to June 2019_BW.pdf21 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - VHTPL- B C - Engineers's Certificate for RERA 30062019_BW.pdf21 Aug 2019
Certificates of CA (Form 3)File: Form 3 - VHTPL CA Certificate Final_300619_BC_signed_BW.pdf21 Aug 2019
Copy of the legal title reportFile: Title Opinion VHTPL (18 June 2019)_BW.pdf2 Aug 2019
Copy of the legal title reportFile: Title Certificate VHTPL (18 June 2019).pdf2 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I - VHTPL B C_BW.pdf27 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form II - VHTPL B C 15 06 2019_BW.pdf27 Jun 2019
Certificates of CA (Form 3)File: Form III - VHTPL B C_BW.pdf27 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate - BC-Oct-Dec'18_BW.pdf13 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - VHTPL- B C - Engineers's Certificate for RERA 31122018_BW.pdf13 Feb 2019
Certificates of CA (Form 3)File: Form 3 - RERA CA CERT BC_311218_Signed_BW.pdf13 Feb 2019
Building plan approvalFile: CC 181102.pdf26 Dec 2018
Copy of the legal title reportFile: Title Opinion VHTPL (7 Dec 2018)_BW.pdf26 Dec 2018
Copy of the legal title reportFile: Title Certificate VHTPL (7 Dec 2018).pdf26 Dec 2018
Building Plan Approval (IOD)File: CC 181102.pdf26 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Building B C_BW.pdf26 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - VHTPL- B C - Engineers's Certificate for RERA_BW.pdf26 Dec 2018
Certificates of CA (Form 3)File: Form 3 - VHTPL_CA Cert_BC_30092018.pdf26 Dec 2018
Proforma of Allotment letterFile: Agreement for Sale Wings BC December 26 2018.pdf26 Dec 2018
Certificates of CA (Form 5)File: Form 5 - B C.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Cer - - Rece From Ajay on 27082018 - BC_BW.pdf11 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - VHTPL BC Engineers Certificate June 2018_BW.pdf11 Sep 2018
Certificates of CA (Form 3)File: Form 3 - RERA CA Cert-BC_300618.pdf11 Sep 2018
Proforma of Allotment letterFile: Agreement for Sale Wings BC August 16 2018.pdf16 Aug 2018
Proforma of Allotment letterFile: Agreement for Sale Wings B C.pdf27 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - BC Architect Certificate_BW.pdf14 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate- BC_BW.pdf14 Jun 2018
Certificates of CA (Form 3)File: Form 3 - VHTPL CA Cert_BC_BW.pdf14 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter from MIDC, VHTPL.PDF9 Apr 2018
Copy of the legal title reportFile: Title Opinion VHTPL (27 Dec 2017)_BW.pdf1 Mar 2018
Copy of the legal title reportFile: Title Certificate VHTPL (27 Dec 2017).pdf1 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - VHTPL- B C - Architect Certificate - December 2017_BW.pdf1 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - VHTPL- B C - Engineers's Certificate - December 2017.pdf1 Mar 2018
Certificates of CA (Form 3)File: FORM 3 - VHTPL- B C - CA Certificate - December 2017.pdf1 Mar 2018
Proforma of Allotment letterFile: Proforma Agreement for Sale- Revised (12 Jan 2018)-Wing B and Wing C.pdf12 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate - September 2017 - BW.pdf26 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineer Certificate - September 2017.PDF26 Dec 2017
Certificates of CA (Form 3)File: Form 3 - CA Certificate VHTPL_September 2017.pdf26 Dec 2017
Building plan approvalFile: Approval letter for approval of layout and building plan.pdf29 Jul 2017
Building Plan Approval (IOD)File: Approval letter for approval of layout and building plan.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Engineer Certificate - VHTPL.pdf29 Jul 2017
Proforma of Allotment letterFile: Proforma Agreement for Sale VHTPL - Wing B and C.pdf29 Jul 2017
Layout approvalFile: Layout approved by MIDC is for 6 buildings.pdf28 Jul 2017
PAN CardFile: VHTPL - PAN Card.pdf28 Jul 2017
Copy of the legal title reportFile: Title Opinion VHTPL (22 May 2017).pdf28 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate - VHTPL.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout approved by MIDC is for 6 buildings.pdf28 Jul 2017
Declaration in FORM BFile: FORM B - VHTPL.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate - VHTPL.pdf28 Jul 2017
Certificates of CA (Form 3)File: Form 3 - CA Certificate - VHTPL.pdf28 Jul 2017
OtherFile: Additional Disclosure - VHTPL- Wing B C.pdf28 Jul 2017
OtherFile: VHTPL-Lease Deed.pdf28 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
The Cliff Garden-Phase 2AP52100028926Maan, Hinjawadi, Pune120Apr 2021OngoingDec 2025Not delivered
The Cliff GardenR2-1 Pune Maan Hinjawadi224-CompletedDec 2022Aug 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Cliff Garden on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Maan, Hinjawadi13,700+ in Pune

2 kmThe Cliff GardenCompleted 28Lapsed / revoked 11Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: VH Township Private Limited

VH Township Private Limited has 3 registrations on MahaRERA, including The Cliff Garden and The Cliff Garden. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if The Cliff Garden is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Cliff Garden?

The registered promoter entity is VH Township Private Limited, a company as per the filing. Its CIN U45400MH2007PTC171668 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Cliff Garden?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Cliff Garden?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Cliff Garden?

The professionals named in the filing: Architect: V K : a Architecture; Engineer: B G Shirkee Construction Technology Pvt. Ltd.,. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Cliff Garden?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Cliff Garden. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Cliff Garden to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.