ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / The Baya Junction

Registration lapsed No litigation declared Residential / Group Housing project

The Baya Junction

By M/s. Unique Property Enterprises Pvt. Ltd.

RG-MH-38307 · RERA P51800015307 · Last updated on MahaRERA portal: 22 Apr 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
7 of 11Construction stages donefurthest along: Internal walls, 50%
1Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

The Baya Junction is a Residential / Group Housing project by M/s. Unique Property Enterprises Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800015307 on 15 Feb 2018. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NameThe Baya Junction
  • TypeResidential / Group Housing
  • Location
    • Pestom Sagar rd no 6
    • Pestom Sagar
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400089
  • Pincode400089
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800015307
  • ReraGenie IDRG-MH-38307

Builder

  • NameM/s. Unique Property Enterprises Pvt. Ltd.
  • Entity typeCompany
  • DirectorsVilas Kharche, Rohit Kharche

Key dates

34 months past promisethis monthRegisteredFeb 2018PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Feb 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Baya JunctionNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.

The Baya Junction: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities16

As on 22 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes90%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Fitness CenterYes100%

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered144

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,220 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7178.72
Proposed, not sanctioned5,318 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCorporate House E Wing, Ground Floor, Kanakia Zillion , Junction of LBS CTS Marg, Kurla west, Mumbai

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCatapult Realty Consultants
PartnerRole in project
M/s. Unique Property Enterprises Pvt. Ltd.-

Litigation declared2

CaseCourtStatus
1688/2016/2016Bombay High CourtClosed
18/2011Additional Chief Metropolitan MagistrateClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000196798Puneet KalwaniM/s Unique Property Enterprises Private Limited28/04/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects_Unique.pdf22 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Unique.pdf22 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc Unique.pdf14 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Unique.pdf14 Jan 2023
Disclosure of sold/ booked inventoryFile: Dis Unique.pdf14 Jan 2023
Details of encumbrancesFile: Encumbrance Certificate Unique.pdf16 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Unqiue.pdf26 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Unique.pdf26 Apr 2022
Disclosure of sold/ booked inventoryFile: Unique.pdf26 Apr 2022
Certificates of CA (Form 3)File: unique Property Enterprises.pdf26 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate The Baya Junction December 2021 Qtr.pdf8 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate The Baya Junction December 2021 Qtr.pdf8 Feb 2022
Disclosure of sold/ booked inventoryFile: Inventory Certificate The Baya Junction December 2021 Qtr.pdf8 Feb 2022
Certificates of CA (Form 3)File: Unique Baya Junction Form 3 as on 30122021.pdf8 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 RERA_5 Unique TBJ FY2020-21.pdf30 Nov 2021
Disclosure of sold/ booked inventoryFile: Inventory Disclosure The Baya Junction Sept 2021.pdf13 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate The Baya Junction Sept 2021.pdf12 Oct 2021
Certificates of CA (Form 3)File: CA Certificate The Baya Junction Form 3 Sept 2021.pdf12 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate The Baya Junction Sept 2021.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certifucate The Baya Junction.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certificate The Baya Junction.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certificate The Baya Junction.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certificate The Baya Junction.pdf9 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate The Baya Junction 30th June 2021.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate The Baya Junction 30th June 2021.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - QA Certificate The Baya Junction June 2021.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Inventory Disclosure The Baya Junction June 2021.pdf14 Aug 2021
Certificates of CA (Form 3)File: Unique Properties Junction Form 3 RERA 12082021.pdf14 Aug 2021
Certificates of CA (Form 5)File: Form 5 Certificate unique property 22072021.pdf22 Jul 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE - THE BAYA JUNCTION.pdf25 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: TBJ CC 22042021.pdf5 Jun 2021
Disclosure of sold/ booked inventoryFile: Inventory Unique TBJ 27052021.pdf27 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate - The Baya Junction March 2020.pdf1 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate - The Baya Junction June 2020.pdf1 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate - The Baya Junction Sept 2020.pdf1 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate - The Baya Junction Dec 2020.pdf1 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate The Baya Junction 07012021.pdf12 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate The Baya Junction 07012021.pdf12 Jan 2021
Certificates of CA (Form 3)File: CA Certificate The Baya Junction 11012021.pdf12 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: NAVBHARAT LATEST CC.pdf30 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NAVBHARAT - CC.pdf30 Nov 2020
Details of encumbrancesFile: Encumbrance certificate_Unique TBJ 05032020.pdf5 Mar 2020
Proforma of Allotment letterFile: Junction RERA Agreement .pdf5 Mar 2020
Certificates of CA (Form 5)File: Unique Scan.pdf5 Oct 2019
Building plan approvalFile: TBJ Rev LOI (4).pdf28 Dec 2018
Building plan approvalFile: TBJ Rev LOI (2).pdf28 Dec 2018
Building plan approvalFile: TBJ Rev LOI (3).pdf28 Dec 2018
Building plan approvalFile: The Baya Junction NAVBHARAT - AMENDED IOA.pdf28 Dec 2018
Building plan approvalFile: TBJ Rev LOI (1).pdf28 Dec 2018
Building Plan Approval (IOD)File: The Baya Junction NAVBHARAT - AMENDED IOA.pdf28 Dec 2018
Building Plan Approval (IOD)File: TBJ Rev LOI (1).pdf28 Dec 2018
Building Plan Approval (IOD)File: TBJ Rev LOI (2).pdf28 Dec 2018
Building Plan Approval (IOD)File: TBJ Rev LOI (3).pdf28 Dec 2018
Building Plan Approval (IOD)File: TBJ Rev LOI (4).pdf28 Dec 2018
Details of encumbrancesFile: The Baya Junction Encumbrance Certiicate.pdf20 Nov 2018
Certificates of CA (Form 5)File: form 5A_Unique Property Enterprises pvt ltd.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TBJ Engineers Certificate 22082018.pdf22 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TBJ Architect Certificate 22082018.pdf22 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TBJ Engineers Certificate 22082018.pdf22 Aug 2018
Certificates of CA (Form 3)File: TBJ CA Cert 22082018 (1).pdf22 Aug 2018
Proforma of Allotment letterFile: TBJ Proforma Agreement.pdf28 Jul 2018
Proforma of Allotment letterFile: TBJ Proforma Agreement.pdf27 Jul 2018
Proforma of Allotment letterFile: TBJ Proforma Agreement.pdf26 Jul 2018
Proforma of Agreement for saleFile: TBJ Proforma Agreement.pdf26 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TBJ Architects Certificate Update 07052018 (1).pdf24 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TBJ Enginners Certificate Update 07052018 (1).pdf24 May 2018
Certificates of CA (Form 3)File: Unique Property Enterprises Pvt Ltd 752018.pdf24 May 2018
Copy of the legal title reportFile: Title Certificate.pdf31 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf31 Jan 2018
Declaration in FORM BFile: Form B.pdf31 Jan 2018
Certificates of CA (Form 3)File: Unique Property Enterprises Pvt Ltd 1 MB.pdf31 Jan 2018
Proforma of Allotment letterFile: RERA Agreement uploaded to website .pdf31 Jan 2018
Proforma of Allotment letterFile: RERA Allotment Letter uploaded to website.pdf31 Jan 2018
Building plan approvalFile: IOA Ammended.pdf23 Nov 2017
Building plan approvalFile: IOD-Letter.pdf23 Nov 2017
Building plan approvalFile: IOD-Plan.pdf23 Nov 2017
Layout approvalFile: No Layout.pdf23 Nov 2017
PAN CardFile: UNIQUE PROPERTY NEW PAN CARD.pdf23 Nov 2017
Details of encumbrancesFile: Declaration of No Encumbrances.pdf23 Nov 2017
Copy of Layout Approval (in case of layout)File: No Layout.pdf23 Nov 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Baya Junction on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pestom Sagar6,700+ in Mumbai Suburban

2 kmThe Baya JunctionCompleted 150Lapsed / revoked 114Other 161Dot size: filed unitsN

Filed coordinates, straight-line distance. 425 registered projects within 2 km.

Builder: M/s. Unique Property Enterprises Pvt. Ltd.

M/s. Unique Property Enterprises Pvt. Ltd. has 1 registration on MahaRERA, including The Baya Junction. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that The Baya Junction shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if The Baya Junction is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Baya Junction?

The registered promoter entity is M/s. Unique Property Enterprises Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Baya Junction?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Baya Junction?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Baya Junction?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Baya Junction?

The professionals named in the filing: Architect: Catapult Realty Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Baya Junction?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Baya Junction. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Baya Junction to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.