ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / THE ACE

Registered Litigation declared Commercial project

THE ACE

By TANVI CONSTRUCTION PVT LTD

RG-MH-30302 · RERA P51800030288 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 48 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
152 of 222Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

THE ACE is a Commercial project by TANVI CONSTRUCTION PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030288 on 15 Aug 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 48 months from the original filing. 70 of the 222 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE ACE
  • TypeCommercial
  • Location
    • I.B.PATEL ROAD
    • PAHADI GOREGAON EAST
    • Borivali
    • Mumbai Suburban
    • 400063
  • Pincode400063
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800030288
  • ReraGenie IDRG-MH-30302

Builder

  • NameTANVI CONSTRUCTION PVT LTD
  • Entity typeCompany
  • DirectorVIJAYKUMAR GOVIND HEGDE
  • Other registrations2 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2021First promiseDec 2024Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Aug 2021
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed58 files

Current status

32%70 of 222 units booked
72.5%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
V-PROTEINNA20150222222

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

V-PROTEIN: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes10%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes65%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed109

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots109
Closed/Covered73
Open Space36

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,463 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on4 Dec 2025

Approvals and building plan

Sanctioning authorityPlanning authority
Permissible FSI9058.55
Proposed, not sanctioned2,669 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGanapati Tower, Thakur Village, Kandivali East, Mumbai Maharashtra.400101
Estimated costRs 125.00 cr
Cost incurredRs 90.58 cr
Work done72.46%
BuildingWingEstimatedIncurred
V-PROTEINNARs 115.00 crRs 83.33 cr
-NARs 10.00 crRs 7.25 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhavin Modi
EngineerSatish Sable
EngineerHimanshu Madhukar Raje
EngineerMandar Dhotre
Chartered AccountantRakesh Vaghasia
Chartered AccountantShah and Ramaiya
PartnerRole in project
TANVI CONSTRUCTION PVT LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800027164Dec 2024 → Mar 2026

Reason as filed by the promoterThe Ace was registered with MahaRERA on 15.08.2021. However no constrction work was allowed for over 20 months due to Covid-19. Meanwhile we did not sell any unit in the Project. Please also note that as per DCPR 2034 we were also entitled to addition FSI. We applied for plan change and amended plan was received on 04.01.2022

EA08022619768Dec 2024 → Dec 2028

Reason as filed by the promoterThe delay arose due to time taken to obtain the revised sanctioned plan from the competent authority.

Litigation declared2

CaseCourtStatus
1681/2011HOB BLE HIGHCOURT MUMBAIClosed
1681/2011Mumbai Session CourtOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: The Ace 25-26 Form 5.pdf20 May 2026
Withdrawal Update Form 1File: ACE Q4 FORM 1.pdf17 May 2026
Withdrawal Update Form 2File: form --2 THE ACE_20260511200025 (1).pdf17 May 2026
Withdrawal Update Form 3File: The Ace FORM 3 2526Q4 signed.pdf17 May 2026
Withdrawal Update Form 1File: THE ACE Rera Form Q3.pdf6 Feb 2026
Withdrawal Update Form 2File: form 4_20260205152417.pdf6 Feb 2026
Withdrawal Update Form 3File: The Ace FORM 3 2526Q3.pdf6 Feb 2026
Withdrawal Update Form 1File: Q3 Ace Form1.pdf15 Dec 2025
Withdrawal Update Form 1File: Q3 Ace Form1.pdf15 Dec 2025
Withdrawal Update Form 2File: THE ACE JULY TO SEPTEMBER 2025_20251114115338_.pdf15 Dec 2025
Withdrawal Update Form 2File: THE ACE APRIL TO JUNE 2025.pdf15 Dec 2025
Withdrawal Update Form 3File: The ACE 2526Q2.pdf15 Dec 2025
Withdrawal Update Form 3File: The ACE 2526Q1.pdf15 Dec 2025
Form 5 (FY 2021-2022)File: V protein FORM 5 2021-22.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5_Ace.pdf30 Sep 2025
Form 5 (FY 2023-2024)File: 2324_FORM 5 The ACE.pdf29 Sep 2025
Form 5 (FY 2022-2023)File: FORM 5.pdf29 Sep 2025
Declaration in FORM BFile: P51800030288_FileName_1.pdf10 Mar 2025
Declaration in FORM BFile: P51800030288_FileName_2.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7) form 1 30092023 _250123023100_0001.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8) form 1 30062023_250123023435_0001.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3) form 1 30092024_250123022322_0001.pdf11 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A V-protin_230324220914_0001.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Ace Form 3, March 2024-1-1_signed (1).pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: The Ace Form 3, December 2024-1_signed (1).pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: IDS ACE RERA - converted.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2324_FORM 5 The ACE (1).pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE Form 2 - Apr 23 to Mar 24.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE Form Jan24_Mar24.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE Form 2 - Apr 24 to Dec 24.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE Form 2 - Jan 23 to Mar 23.pdf25 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ACE Apr23_Jun23.pdf25 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ACE Form Jly23_Sep23.pdf25 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ACE Form Oct23_Dec23.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: v protin july 2022-sep22_230724000115_0001.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: v protin oct2022-dec 22_230724000323_0001.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: V protein FORM 3 March 2022.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: V-Protein FORM 3 2223Q1_17 Aug 2023.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: V-Protein FORM 3 2223Q2_17 Aug 2023.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: V-Protein FORM 3 2223Q3_22 Aug 2023.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: V protein FORM 5 2021-22 (1).pdf9 Feb 2023
OtherFile: Development Agreement (2).pdf10 Aug 2021
Proforma of Allotment letterFile: Development Agreement (2).pdf6 Aug 2021
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf5 Aug 2021
Copy of the legal title reportFile: FORMAT A.pdf30 Jul 2021
Declaration about Commencement CertificateFile: FORMAT D.pdf30 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA ENGR CERTI GOREGAON.pdf21 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 V-Protein.pdf21 Jul 2021
PAN CardFile: TCPL PAN.pdf19 Jul 2021
Layout approvalFile: V-PROTEIN IOD PLAN.pdf17 Jul 2021
Building plan approvalFile: V-PROTEIN IOD LETTER_compressed.pdf17 Jul 2021
Details of encumbrancesFile: NON ENCUMBRANCE CERTIFICATE.pdf17 Jul 2021
Copy of Layout Approval (in case of layout)File: V-PROTEIN IOD PLAN.pdf17 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: V-PROTEIN IOD LETTER_compressed.pdf17 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: GOREGAON CC.pdf17 Jul 2021
Declaration in FORM BFile: FORM B SIGNED AND NOTARISED.pdf17 Jul 2021

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
THE POLARISP51800014217DAHISAR EAST, Mumbai Suburban400Nov 2017OngoingDec 2025Not delivered
THE PLATINAP51800014131DAHISAR EAST, Mumbai Suburban193Nov 2017OngoingDec 2024Not delivered
DIAMODA GOLDTANVI COMPLEX NEXT TO S V ROAD PETROL PUMP DAHISAR EAST MUMBAI 400 06872-CompletedOct 2016Late, Dec 2016
TANISHKA INDUSTRIAL PREMISESTANVI COMPLEX NEXT TO S V ROAD PETROL PUMP DAHISAR EAST MUMBAI 400 06880-CompletedMar 2016Late, Apr 2016

How this compares with Mumbai Suburban

32%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE ACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PAHADI GOREGAON EAST6,700+ in Mumbai Suburban

2 kmTHE ACECompleted 138Lapsed / revoked 68Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 341 registered projects within 2 km.

Builder: TANVI CONSTRUCTION PVT LTD

TANVI CONSTRUCTION PVT LTD has 3 registrations on MahaRERA, including THE PLATINA and THE POLARIS. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THE ACE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE ACE?

The registered promoter entity is TANVI CONSTRUCTION PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE ACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE ACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE ACE?

The professionals named in the filing: Architect: Bhavin Modi; Engineer: Satish Sable; Engineer: Himanshu Madhukar Raje; Engineer: Mandar Dhotre; Chartered Accountant: Rakesh Vaghasia; Chartered Accountant: Shah and Ramaiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE ACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE ACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE ACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.