Home / Browse projects / Mumbai Suburban, Maharashtra / THE POLARIS

Registered No litigation declared Commercial project

THE POLARIS

By TANVI CONSTRUCTION PVT LTD

RG-MH-41403 · RERA P51800014217 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 36 months from the original
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 90%
13 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 222 documents Report an error

THE POLARIS is a Commercial project by TANVI CONSTRUCTION PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014217 on 16 Nov 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 12 of the 25 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameTHE POLARIS
  • TypeCommercial
  • Location
    • S V ROAD
    • DAHISAR EAST
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014217
  • ReraGenie IDRG-MH-41403

Builder

  • NameTANVI CONSTRUCTION PVT LTD
  • Entity typeCompany
  • DirectorVIJAYKUMAR GOVIND HEGDE
  • Other registrations2 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2017First promiseDec 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Nov 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2025)
  • Buildings2 building records
  • Documents filed222 files

Current status

48%12 of 25 units booked
11.7%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE POLARIS - A - BWing B5202121
THE POLARIS - A - BWing A52044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.

THE POLARIS - A - B · wing Wing B8%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
THE POLARIS - A - B · wing Wing A8%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed299

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots299
Closed/Covered299

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,325 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2025
LandownerVillageDistrict
Yogesh Shah-Mumbai Suburban
Laxmi Shah-Mumbai Suburban

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI5325.34
Proposed, not sanctioned2,535 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Ganapati Tower, Thakur Village, Kandivali East, Mumbai Maharashtra.400101
Estimated costRs 150.00 cr
Cost incurredRs 17.48 cr
Work done11.65%
BuildingWingEstimatedIncurred
THE POLARIS - A - BWing BRs 138.00 crRs 17.48 cr
-NARs 12.00 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHAVIN MODI
ArchitectSpace Vision Architects
EngineerSatish Sable
EngineerMandar Dhotre
EngineerKhan Mohammad Siddique
Chartered AccountantShah & Ramaiya
Chartered AccountantRakesh
Chartered AccountantNehali and Co.
PartnerRole in project
TANVI CONSTRUCTION PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03062621219Dec 2025 → Dec 2028

Reason as filed by the promoterExplanatory note regarding the state of development works in the project and reason for not completing the development works in the project within the period declared in the declaration submitted in Form 'B' at the time of making application for the registration of the project are as follows: a) The applicant submits that due to reasons beyond the control of applicant and as elaborately mentioned hereinafter, the said Project is unlikely to be completed by 30.12.2025. Hence, in the said circumstances, the applicant is constrained to make this Application and seek extension of the registration

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed222

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 222 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Plans_1-1 .pdf23 Jun 2026
Layout approvalFile: Plans_2-2.pdf23 Jun 2026
Layout approvalFile: Plans_3-3.pdf23 Jun 2026
Layout approvalFile: Plans_4-4.pdf23 Jun 2026
Layout approvalFile: Plans_5-5.pdf23 Jun 2026
Layout approvalFile: Plans_6-6.pdf23 Jun 2026
Layout approvalFile: Plans_7-7.pdf23 Jun 2026
Layout approvalFile: Plans_8-8.pdf23 Jun 2026
Layout approvalFile: Plans_9-end.pdf23 Jun 2026
Building plan approvalFile: THE POLARIS IOD.pdf17 Jun 2026
Withdrawal Update Form 1File: 4 Form 1.pdf15 Jun 2026
Withdrawal Update Form 2File: 4 Form 2.pdf15 Jun 2026
Withdrawal Update Form 3File: 4 Form 3.pdf15 Jun 2026
Building plan approvalFile: IOD 21 may 2026.pdf26 May 2026
Withdrawal Update Form 1File: 2 Jul 25 to Sept25.pdf26 May 2026
Withdrawal Update Form 2File: 2 JULY 25 TO SEPTEMBER 25.pdf26 May 2026
Withdrawal Update Form 3File: 2 Jul 25 to Sep 25.pdf26 May 2026
Withdrawal Update Form 1File: 1 Apr 25 to Jun25.pdf22 Nov 2025
Withdrawal Update Form 1File: 2 Jul 25 to Sept25.pdf22 Nov 2025
Withdrawal Update Form 2File: 1 APRIL 25 TO JUN 25.pdf22 Nov 2025
Withdrawal Update Form 2File: 2 JULY 25 TO SEPTEMBER 25.pdf22 Nov 2025
Withdrawal Update Form 3File: 1 Apr 25 to Jun 25.pdf22 Nov 2025
Withdrawal Update Form 3File: 2 Jul 25 to Sep 25.pdf22 Nov 2025
Form 2A (FY 2023-2024)File: form no 2A April 2023 to March 2024.pdf2 Jul 2025
Form 2A (FY 2024-2025)File: form no 2A April 2024 to March 2025.pdf2 Jul 2025
Form 2A (FY 2017-2018)File: THE POLARIS QPR DECLARATION.pdf1 Jul 2025
Form 2A (FY 2018-2019)File: THE POLARIS QPR DECLARATION.pdf1 Jul 2025
Form 2A (FY 2019-2020)File: Form 2A 19-20.pdf1 Jul 2025
Form 2A (FY 2020-2021)File: Form 2A 20-21.pdf1 Jul 2025
Form 2A (FY 2021-2022)File: Form 2A 21-22.pdf1 Jul 2025
Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf1 Jul 2025
Form 5 (FY 2018-2019)File: 2 Polaris FORM 5 2018-19_compressed.pdf1 Jul 2025
Form 5 (FY 2019-2020)File: 3 Polaris FORM 5 2019-20_compressed.pdf1 Jul 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Disclosure of Sold and Booked InventoryFile: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 1File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 2File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025
Form 3File: THE POLARIS QPR DECLARATION.pdf22 Jun 2025

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
THE PLATINAP51800014131DAHISAR EAST, Mumbai Suburban193Nov 2017OngoingDec 2024Not delivered
DIAMODA GOLDTANVI COMPLEX NEXT TO S V ROAD PETROL PUMP DAHISAR EAST MUMBAI 400 06872-CompletedOct 2016Late, Dec 2016
TANISHKA INDUSTRIAL PREMISESTANVI COMPLEX NEXT TO S V ROAD PETROL PUMP DAHISAR EAST MUMBAI 400 06880-CompletedMar 2016Late, Apr 2016

How this compares with Mumbai Suburban

48%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE POLARIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHISAR EAST6,700+ in Mumbai Suburban

2 kmTHE POLARISCompleted 15Lapsed / revoked 17Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: TANVI CONSTRUCTION PVT LTD

TANVI CONSTRUCTION PVT LTD has 3 registrations on MahaRERA, including THE PLATINA and THE POLARIS. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THE POLARIS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE POLARIS?

The registered promoter entity is TANVI CONSTRUCTION PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE POLARIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE POLARIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE POLARIS?

The professionals named in the filing: Architect: BHAVIN MODI; Architect: Space Vision Architects; Engineer: Satish Sable; Engineer: Mandar Dhotre; Engineer: Khan Mohammad Siddique; Chartered Accountant: Shah & Ramaiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE POLARIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE POLARIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE POLARIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.