Home / Browse projects / Mumbai Suburban, Maharashtra / THE PLATINA

Registered No litigation declared Others project

THE PLATINA

By TANVI CONSTRUCTION PVT LTD

RG-MH-99362 · RERA P51800014131 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 48 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
41 of 175Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

THE PLATINA is a Others project by TANVI CONSTRUCTION PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014131 on 9 Nov 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 48 months from the original filing. 134 of the 175 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE PLATINA
  • TypeOthers
  • Location
    • S V ROAD
    • DAHISAR EAST
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014131
  • ReraGenie IDRG-MH-99362

Builder

  • NameTANVI CONSTRUCTION PVT LTD
  • Entity typeCompany
  • DirectorVIJAYKUMAR GOVIND HEGDE
  • Other registrations2 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2017First promiseDec 2024Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Nov 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed87 files

Current status

77%134 of 175 units booked
69.7%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE PLATINANA2200175175

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

THE PLATINA: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed114

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots114
Closed/Covered114

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,289 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPlanning Authority
Permissible FSI6560.06
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThakur Complex Kandivali East
Estimated costRs 70.00 cr
Cost incurredRs 48.76 cr
Work done69.66%
BuildingWingEstimatedIncurred
THE PLATINANARs 65.10 crRs 45.35 cr
-NARs 4.90 crRs 3.41 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHAVIN MODI
EngineerMandar Dhotre
Chartered AccountantRakesh Vaghasia
Chartered AccountantShah & Ramaiya
PartnerRole in project
TANVI CONSTRUCTION PVT LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800027183Dec 2024 → Mar 2026

Reason as filed by the promoterDelay is due to rejection letter from Airport Authority of India, for Height NOC.

EA29012619616Dec 2024 → Dec 2028

Reason as filed by the promoterDelay is due to rejection letter from Airport Authority of India, for Height NOC.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Feb 2025

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1.pdf20 May 2026
Withdrawal Update Form 2File: Platina form 2 Q4.pdf20 May 2026
Withdrawal Update Form 3File: Platina Form 3 - Mar 26 signed.pdf20 May 2026
Form 5 (FY 2025-2026)File: The Platina 25-26 Form 5.pdf20 May 2026
Withdrawal Update Form 1File: Form_1.pdf23 Jan 2026
Withdrawal Update Form 2File: form 2 the platina_20260120135105.pdf23 Jan 2026
Withdrawal Update Form 3File: Platina Form 3- Dec 25.pdf23 Jan 2026
Withdrawal Update Form 1File: FORM_1.pdf3 Jan 2026
Withdrawal Update Form 1File: FORM_1.pdf3 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf3 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf3 Jan 2026
Withdrawal Update Form 3File: Platina Form 3 - Sept 25.pdf3 Jan 2026
Withdrawal Update Form 3File: Platina Form 3 - Sept 25.pdf3 Jan 2026
Form 5 (FY 2020-2021)File: Platina FORM 5 2020-21 (1).pdf30 Sep 2025
Form 5 (FY 2021-2022)File: Platina FORM 5 2021-22.pdf30 Sep 2025
Form 5 (FY 2018-2019)File: Scan small Form V platina 31-03-2019.pdf30 Sep 2025
Form 5 (FY 2019-2020)File: Scan small Form V platina 31-03-2020.pdf30 Sep 2025
Form 5 (FY 2017-2018)File: FORM 5 2017-18.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5.pdf29 Sep 2025
Form 5 (FY 2023-2024)File: Platina FORM 5 March 2024_signed.pdf29 Sep 2025
Form 5 (FY 2022-2023)File: Form 5.pdf29 Sep 2025
Declaration in FORM BFile: P51800014131_FileName_31.pdf7 Feb 2025
Declaration in FORM BFile: The Platina Affidavit Cum Declaration (1).pdf7 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: The Platina Part OC.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: IDS of The Platina Full building - converted.pdf6 Feb 2025
Other - TechnicalFile: The Platina Part OC.pdf6 Feb 2025
Certificates of CA (Form 3)File: Platina FORM 3 Dec 2024 (2).pdf4 Feb 2025
Declaration in FORM BFile: form B HGV_250123025528.pdf24 Jan 2025
Declaration in FORM BFile: form 1 30092024_Platina.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 01062024_Platina.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 30092024_Platina.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 30032024_Platina.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 30092023_Platina.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 30062023_Platina.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 30122023_Platina.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 1 30092024_Platina.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: April-Dec2024.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: April-Mar2024.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Jan-Mar2023.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 1 30092024_Platina.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 1 01062024_Platina.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 1 30032024_Platina.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 1 30122023_Platina.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 1 30092023_Platina.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 1 30062023_Platina.pdf24 Jan 2025
Declaration in FORM BFile: The Platina Form B Consent Letter Signed.pdf23 Jan 2025
Certificates of CA (Form 3)File: Platina FORM 3 March 2024-2.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form-2A 1_250122054111_0001.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form-2A 2_250122054305_0001.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form-2A 3_250122054451_0001.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form-2A 4_250122054616_0001.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Platina FORM 5 March 2024_signed.pdf22 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: The Platina Form 5 March 23.pdf15 Jun 2024
Certificates of CA (Form 3)File: Platina FORM 3 March 2023.pdf1 Jun 2024
Declaration about Commencement CertificateFile: 0602 FCC upto 14 floors.pdf3 Oct 2023
Declaration about Commencement CertificateFile: 0602 FCC upto 14 floors.pdf3 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Jul22 to Sep22.pdf2 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Apr22 to June 22.pdf2 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Oct22 to Dec22.pdf2 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Jan to Mar23.pdf2 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Platina FORM 5 2021-22.pdf25 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: The Platina Bank Change.pdf9 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Platina FORM 5 2020-21.pdf25 Jan 2023
Certificates of CA (Form 3)File: Form 3 Platina.pdf27 Aug 2021
Certificates of CA (Form 3)File: Form 3 Polaris.pdf27 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Tanvi The Platina Form 5 31-03-2019.pdf15 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Tanvi The Platina Form 5 31-03-2020.pdf15 Jul 2021
Certificates of CA (Form 5)File: FORM 5 .pdf25 Jan 2019
Certificates of CA (Form 5)File: Deviations to the provisions of Maharera.pdf25 Jan 2019
Declaration in FORM BFile: THE PLATINA FORM B CORRECTED.pdf6 Jan 2018
Declaration in FORM BFile: THE PLATINA FORM B CORRECTED.pdf6 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf20 Dec 2017
Building plan approvalFile: IOD.pdf18 Oct 2017
Layout approvalFile: layout_plan.pdf18 Oct 2017
PAN CardFile: TCPL PAN.pdf18 Oct 2017
Copy of the legal title reportFile: Title Certificate.pdf18 Oct 2017
Details of encumbrancesFile: NON ENCUMBRANCE CERTIFICATE.pdf18 Oct 2017
Copy of Layout Approval (in case of layout)File: layout_plan.pdf18 Oct 2017
Building Plan Approval (IOD)File: IOD.pdf18 Oct 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
THE POLARISP51800014217DAHISAR EAST, Mumbai Suburban400Nov 2017OngoingDec 2025Not delivered
DIAMODA GOLDTANVI COMPLEX NEXT TO S V ROAD PETROL PUMP DAHISAR EAST MUMBAI 400 06872-CompletedOct 2016Late, Dec 2016
TANISHKA INDUSTRIAL PREMISESTANVI COMPLEX NEXT TO S V ROAD PETROL PUMP DAHISAR EAST MUMBAI 400 06880-CompletedMar 2016Late, Apr 2016

How this compares with Mumbai Suburban

77%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE PLATINA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHISAR EAST6,700+ in Mumbai Suburban

2 kmTHE PLATINACompleted 43Lapsed / revoked 28Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 144 registered projects within 2 km.

Builder: TANVI CONSTRUCTION PVT LTD

TANVI CONSTRUCTION PVT LTD has 3 registrations on MahaRERA, including THE PLATINA and THE POLARIS. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THE PLATINA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE PLATINA?

The registered promoter entity is TANVI CONSTRUCTION PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE PLATINA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE PLATINA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE PLATINA?

The professionals named in the filing: Architect: BHAVIN MODI; Engineer: Mandar Dhotre; Chartered Accountant: Rakesh Vaghasia; Chartered Accountant: Shah & Ramaiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE PLATINA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE PLATINA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE PLATINA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.