Home / Browse projects / Mumbai Suburban, Maharashtra / Elysian Tower A

Registered No litigation declared Residential / Group Housing project

Elysian Tower A

By Oberoi Realty Limited

RG-MH-28909 · RERA P51800027667 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Staircases, 74%
16 of 336Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 155 documents Report an error

Elysian Tower A is a Residential / Group Housing project by Oberoi Realty Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027667 on 25 Dec 2020. Possession is promised by 30 Jun 2027. 320 of the 336 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameElysian Tower A
  • TypeResidential / Group Housing
  • Location
    • Off Western Express Highway
    • Goregaon East
    • Borivali
    • Mumbai Suburban
    • 400063
  • Pincode400063
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800027667
  • ReraGenie IDRG-MH-28909

Builder

  • NameOberoi Realty Limited
  • Entity typeCompany
  • CINL45200MH1998PLC114818
  • GSTIN27AABCK0235H1ZW
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Whole-time Director & CFOSaumil Ashwin Daru
  • DirectorsBindu Ranvir Oberoi, Vikas Ranvir Oberoi, Prafulla Premsukh Chhajed
  • Non Executive Independent DirectorsKaramjit Singh Kalsi, Anil Harish, Tina Trikha
  • Other registrations6 more →
  • Completed1 of 7
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2020PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Dec 2020
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed155 files

Current status

95%320 of 336 units booked
102.0%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA80643360336

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 74%.

Tower A: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises71%
Sanitary Fittings within the flats / premises6%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks74%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.69%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.14%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes68%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes21%
Street LightingYes10%
Community BuildingsYes28%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes23%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes72%
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed769

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots769
Closed/Covered769

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,497 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8806.25
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, D-Definity premises co-op soc, Jay Prakash road no 1, Goregaon East, Mumbai 400063
Estimated costRs 407.22 cr
Cost incurredRs 415.35 cr
Work done102.0%
BuildingWingEstimatedIncurred
Tower ANARs 399.16 crRs 400.27 cr
-NARs 8.06 crRs 15.08 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSIDDHESH SAMANT
ArchitectSunil Arora
ArchitectTechcomm Urban Management Consultant Pvt. Ltd.
ArchitectShashank Kokil
EngineerLERA CONSULTING STRUCTURAL ENGINEERS (I) PVT LTD
EngineerLeslie E. Robertson Associates Consulting Engineers (India) Pvt Ltd Structural Engineer
EngineerMehul Shah
Chartered AccountantTMG & Associates
Chartered AccountantS R B C & CO LLP
PartnerRole in project
Oberoi Realty Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed155

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 155 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form_2A_Elysian_T_A.pdf26 May 2026
Form 2A (FY 2024-2025)File: Form_2A_Elysian_T_A.pdf26 May 2026
Withdrawal Update Form 1File: Form_1_Elysian_T_A.pdf20 Apr 2026
Withdrawal Update Form 2File: Form_2_Elysian_T_A.pdf20 Apr 2026
Withdrawal Update Form 3File: Form_3_Elysian_T_A.pdf20 Apr 2026
Withdrawal Update Form 1File: Elysian T-A_Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Elysian T-A_Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Elysian T-A_Form 3_small.pdf20 Jan 2026
Layout approvalFile: Elysian ABC 1_compressed.pdf14 Jan 2026
Withdrawal Update Form 1File: Form1_Elysian_T_A.pdf17 Oct 2025
Withdrawal Update Form 2File: Form2_Elysian_T_A.pdf17 Oct 2025
Withdrawal Update Form 3File: Elysian T-A Form 3 (UDIN) PDF.pdf17 Oct 2025
Form 1File: Elysian Tower A Form 1 202306.pdf22 Sep 2025
Form 2File: Elysian Tower A Form 2 202306.pdf22 Sep 2025
Form 3File: Elysian Tower A Form 3 202306.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf22 Sep 2025
Form 1File: Elysian Tower A Form 1 202303.pdf22 Sep 2025
Form 2File: Elysian Tower A Form 2 202303.pdf22 Sep 2025
Form 3File: Elysian Tower A Form 3 202303.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked inventory.pdf22 Sep 2025
Form 1File: Elysian Tower A Form 1_ 202209.pdf22 Sep 2025
Form 2File: Elysian Tower A Form 2_ 202209.pdf22 Sep 2025
Form 3File: Elysian Tower A Form 3_ 202209.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked inventory.pdf22 Sep 2025
Form 1File: Elysian T-A Form 1 202206.pdf22 Sep 2025
Form 2File: Elysian T-A Form 2 202206.pdf22 Sep 2025
Form 3File: Elysian T-A Form 3 202206.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked inventory.pdf22 Sep 2025
Form 1File: Elysian T-A Form 1 202203.pdf22 Sep 2025
Form 2File: Elysian T-A Form 2 202203.pdf22 Sep 2025
Form 3File: Elysian T-A Form 3 202203.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked inventory.pdf22 Sep 2025
Form 1File: Elysian_Tower A_Architects Certificate_FY22_Dec'21 Form 1.pdf22 Sep 2025
Form 2File: Elysian_Engineers Certificate_Q3FY22 Form 2.pdf22 Sep 2025
Form 3File: Elysian T-A Form 3 202112.pdf22 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked inventory.pdf22 Sep 2025
Form 5 (FY 2023-2024)File: Elysian A.pdf19 Sep 2025
Form 5 (FY 2024-2025)File: Elysian Tower A.pdf19 Sep 2025
Form 1File: Elysian T-A Form 1 202412.pdf4 Sep 2025
Form 2File: Elysian T-A Form 2 202412.pdf4 Sep 2025
Form 3File: Elysian T-A Form 3 202412.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf4 Sep 2025
Form 1File: Elysian T-A Form 1 202409.pdf4 Sep 2025
Form 2File: Elysian T-A Form 2 202409.pdf4 Sep 2025
Form 3File: Elysian T-A Form 3 202409.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf4 Sep 2025
Form 1File: Form 1_Elysian Tower A_202406.pdf4 Sep 2025
Form 2File: Form 2_Elysian Tower A_202406.pdf4 Sep 2025
Form 3File: ORL_Form_3_Elysian_A_202406.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf4 Sep 2025
Form 1File: Elysian T-A Form 1 202403.pdf4 Sep 2025
Form 2File: Elysian T-A Form 2 202403.pdf4 Sep 2025
Form 3File: Elysian T-A Form 3 202403.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf4 Sep 2025
Form 1File: Form1ElysianTowerA 202312.pdf4 Sep 2025
Form 2File: Form2ElysianTowerA 202312.pdf4 Sep 2025
Form 3File: Elysian T-A Form 3_Signed 202312.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf4 Sep 2025
Withdrawal Update Form 1File: ORLForm1ElysianTowerA27062025.pdf20 Jul 2025
Withdrawal Update Form 1File: ORLForm1ElysianTowerA27062025.pdf20 Jul 2025
Withdrawal Update Form 2File: ORL_Form-2_Elysian_Tower-A.pdf20 Jul 2025
Withdrawal Update Form 2File: ORL_Form-2_Elysian_Tower-A.pdf20 Jul 2025
Withdrawal Update Form 3File: ElysianAForm3 202506withUDIN.pdf20 Jul 2025
Withdrawal Update Form 3File: ElysianAForm3 202506withUDIN.pdf20 Jul 2025
Form 1File: Elysian T-A Form 1 202503.pdf19 Jul 2025
Form 2File: Elysian T-A Form 2 202503.pdf19 Jul 2025
Form 3File: Elysian T-A Form 3 202503.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclousre of Sold and Booked Inventory 202503.pdf19 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ORL_Form-2A_Elysian_Tower-A.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ORL_Form-1_Elysian_Tower-A.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elysian_Tower-A_Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ORL_Form-2_Elysian_Tower-A.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ORL_Elysian Tower A.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ElysianAForm3202412.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ORL_Elysian Tower A.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1-Elysian_Tower_A.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elysian T-A Form 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Elysian_Tower_A.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Elysian A.pdf8 Oct 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Priviera by Oberoi RealtyPriviera Junction of Sarojini Road and Main Avenue Road Santacruz West Mumbai Maharashtra 400 05412CompletedMay 2015May 2015
Exquisite by Oberoi RealtyExquisite Oberoi Garden City Off Western Express Highway Goregaon East Mumbai 400 063802CompletedDec 2014Late, May 2015
Commerz 2Commerz 2 International Business Park Oberoi Garden City Off Western Express Highway Goregaon East Mumbai 400 063-CompletedDec 2013Dec 2013

How this compares with Mumbai Suburban

95%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Elysian Tower A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon East6,700+ in Mumbai Suburban

2 kmElysian Tower ACompleted 106Lapsed / revoked 61Other 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 289 registered projects within 2 km.

Builder: Oberoi Realty Limited

Oberoi Realty Limited has 7 registrations on MahaRERA, including Esquire and Elysian Tower A. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Elysian Tower A is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Elysian Tower A?

The registered promoter entity is Oberoi Realty Limited, a company as per the filing. Its CIN L45200MH1998PLC114818 and GSTIN 27AABCK0235H1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Elysian Tower A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Elysian Tower A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Elysian Tower A?

The professionals named in the filing: Architect: SIDDHESH SAMANT; Architect: Sunil Arora; Architect: Techcomm Urban Management Consultant Pvt. Ltd.; Architect: Shashank Kokil; Engineer: LERA CONSULTING STRUCTURAL ENGINEERS (I) PVT LTD; Engineer: Leslie E. Robertson Associates Consulting Engineers (India) Pvt Ltd Structural Engineer. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Elysian Tower A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Elysian Tower A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Elysian Tower A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.