Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Litigation declared, 30 cases
  • 82 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken
  • Rs 2,400.00 crore secured on the land, in favour of HDFC BANK

Clear

  • Separate project account declared
  • Allotment letter follows the model form

7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
75 of 165Construction stages doneacross 15 buildings; furthest along: Internal walls, 99%
1 of 1Units unsoldnot recorded sold or booked
82Complaints at MahaRERAon this registration
Jump to the 198 documents Report an error

TEN BKC is a Residential / Group Housing project by MIG (Bandra) Realtors & Builders Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004889 on 9 Aug 2017. Possession was promised by 5 Jun 2025 and is now 16 months past that date. The completion date has moved by 24 months from the original filing. 0 of the 1 unit on this registration is recorded sold or booked, and 75 of 165 construction stages are filed complete. 82 complaints are on record with the regulator.

At a glance

Project

  • NameTEN BKC
  • TypeResidential / Group Housing
  • Location
    • Madhusudan Kalelkar Marg
    • Bandra East
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004889
  • ReraGenie IDRG-MH-11450

Builder

  • NameMIG (Bandra) Realtors & Builders Private Limited
  • Entity typeCompany
  • DirectorsFaizan Raza Khan Pasha, Jessie Kuruvilla

Key dates

16 months past promisethis monthRegisteredAug 2017First promiseJun 2023Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion5 Jun 2025
  • Revised completionRevised to 5 Jun 2025 (originally 6 Jun 2023)
  • Buildings15 building records
  • Documents filed198 files

Current status

0%0 of 1 units booked

Figures as on 20 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 1NA2722101
WING 2NA2722000
WING 3NA2722000
WING 4NA2722000
WING 5NA3429000
WING 6NA3429000
WING 7NA3429000
WING 8NA3429000
WING 9NA3429000
WING 10NA2722000
WING 11NA2722000
WING 12NA2722000
WING 13NA2722000
WING 14NA2722000
WING 15NA2722000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building15

As on 20 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

75 of 165 construction stages are filed complete across 15 buildings. The stage furthest along is Internal walls, at 99%.

Wing 158%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%
WING 257%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises58%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%
WING 355%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%
WING 457%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises56%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%
WING 575%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.81%
WING 673%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.88%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.81%
WING 772%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises27%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.79%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.89%
WING 871%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises23%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.89%
WING 960%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises71%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.63%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%
WING 1060%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.58%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%
WING 1160%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises63%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%
WING 1260%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises72%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%
WING 1372%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises29%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.93%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.72%
WING 1459%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises69%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%
WING 1558%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises59%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.28%

Progress on shared amenities34

As on 20 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes30%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Squash CourtYes100%
Senior Citizen AreaYes0%
Salon and SpaYes0%
Welfare CentreYes0%
Walking PathYes0%
Tiered Landscape GardensNoNot applicable
Swimming Pool including Kids PoolYes100%
Swimming PoolNoNot applicable
Reflexology PathYes0%
Multipurpose HallYes100%
Kids PoolNoNot applicable
ClubhouseYes0%
Kids Play Area with play EquipmentYes0%
Kids Play AreaNoNot applicable
Game SimulatorYes0%
Fitness CentreYes75%
Community BuildingNoNot applicable
Convenience CentreNoNot applicable
Convenience StoreYes0%

Parking filed915

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots915
Closed/Covered915
BuildingClosed/CoveredTotal
Wing 15555
WING 25050
WING 37979
WING 45555
WING 53030
WING 63030
WING 77676
WING 88282
WING 9121121
WING 103737
WING 118080
WING 125555
WING 135555
WING 145555
WING 155555

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area20,149 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofHDFC BANK
Secured amountRs 2,400.00 crore
CERSAI search filedYes
Declared on5 Jun 2025
LandownerVillageDistrict
Radius Estates & Developers Private LimitedAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI122407.12
Proposed, not sanctioned58,365 sq m
Buildings approved15
Buildings sanctioned15

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Conwood House Gen A K Vaidya Marg Goregaon East Mumbai

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Age Consultants
ArchitectGirish Chaudhari
ArchitectARCHITECT HAFEEZ CONTRACTOR Design Architect
EngineerJagdish Kadu
Chartered AccountantB B Jain & Associates
PartnerRole in project
MIG (Bandra) Realtors & Builders Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012262Jun 2023 → Jun 2024

Reason as filed by the promoter1. We, hereby apply for extension of registration u/s 6 of the Act r/w Rule 7 of the Rules in respect of Project: TEN BKC, No. P51800004889 which expires on 6th June 2023. This is a redevelopment project. The obligation to undertake construction was that of the Co-promoter, Radius Estates & Developers Pvt. Ltd.(Radius). Radius has gone into CIRP under Insolvency Code and a Resolution plan submitted by Adani Goodhomes Pvt. Ltd. has been approved by the Committee of Creditors (83.93% voting in favour). Project Completion Date proposed in the Resolution Plan is 6th June 2024. Adani has also been

EXT51800019816Jun 2023 → Jun 2025

Reason as filed by the promoterthe date of 6th June 2024 was proposed in the Resolution Plan which was submitted by Adani Goodhomes Pvt. Ltd. with the Committee of Creditors in December 2021, it was on the basis of a site condition, where work could commence immediately on 1st January 2022. However, after the Resolution Plan was approved by the Committee of Creditors on 21st December 2021 and Adani Goodhomes Pvt. Ltd. was permitted to enter upon the site on 27th December 2021 under the Construction Management Agreement, and after entering the site, Adani Goodhomes Private Limited commenced collating all the drawings of the

Litigation declared30

CaseCourtStatus
WP No 550 of 2017/2015High Court Bombaychallenged the levy of development charges by MCGM
Suit No 19 of 2018/2017High Court Bombayinterse dispute amongst family members of a member on claim to flat vacated
Suit No 2518/2017City Civil Courtinterse dispute amongst family members of a member on claim to flat vacated
Suit No 756/2015High Court Bombayinterse dispute amongst family members of three suit flats vacated
Suit No 1075/2015City Civil Courtinterse dispute amongst family members of a member on claim to flat vacated
WP No 2521/2018High Court BombayMatter pending in regards to set off of Stamp Duty on APAA to be executed by the Society Members
NA/2020Before the Ld Sole ArbitratorDispute between Society and Promoter Society has sought to illegally terminate the DA As per the pro
WP No 572/2020High Court Bombaychallenged the levy of off site infrastructure charge by MHADA
WP No 2287/2019High Court Bombaychallenged the levy of premium by MHADA
Suit No 525/2019City Civil Court Dindoshiinterse dispute amongst family members of a member on claim to flat vacated
Testamentary Petition No 444/2015High Court Bombayinterse dispute amongst family members of a member on claim to flat vacated
Suit No 607/2017High Court Bombayinterse dispute amongst family members of a member on claim to flat vacated
1390/2020NCLT MUMBAI BenchDisposed Off
AT006000000133991/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order for refund
AT006000000134129/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000134130/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000134135/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000134000/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000133998/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000134001/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000134002/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000134003/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000134004/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000134005/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000133993/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000133992/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000133994/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000133995/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000133996/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order
AT006000000133997/2022Maharashtra Real Estate Appellate TribunalAppeal filed against the order

Complaints filed with MahaRERA82

Case no.ComplainantRespondentFiled
CC006000000194108Ashutosh TikekarRadius Estates and Developers Pvt. Ltd.21/09/2020
CC006000000057286SANJAY KABRAMIG (Bandra) Realtors and Builders Pvt.Ltd.14/12/2018
CC006000000262080Sanjay KabraMIG(Bandra) Realtors and Builders Pvt.Ltd.05/08/2022
CC006000000591225Sanjay KabraMIG (Bandra) Realtors & Builders Private Limited18/07/2024
CC006000000110869Amit SaxenaMIG (BANDRA) REALTORS & BUILDERS PRIVATE LIMITED11/09/2019
CC006000000110882Milee ShettyMIG (Bandra) Realtors and builders Private limited12/09/2019
CC006000000193073Samir T. HosangadyRadius Estates and Developers Pvt Ltd19/03/2020
CC006000000193176Mohan Vamsi VinjamurRadius Estates and Developers Private Ltd17/04/2020
CC006000000171654AMIT SURENDRA SINGHSANJAY CHHABRIA02/10/2020
CC006000000196347Suman Manglunia & Ajay MangluniaMIG (BANDRA) REALTORS AND BUILDERS PVT LTD25/03/2021
CC006000000192739MR. SAJID SULAIMAN AND MRS. AYISHA SAJIDRADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED30/06/2020
CC006000000192741MR. SHIVASHISH MISRARADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED07/07/2020
CC006000000192742MR. VENKATESHAM NEELA AND MRS. HARIKA NEELARADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED04/07/2020
CC006000000192758MR. MADHUSUDHANA REDDY UPPARLAPALLIRADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED07/07/2020
CC006000000192759MR.GAUTAM BHARGAVA AND MRS.RIDHI BHARGAVARADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED06/07/2020
CC006000000192760MR. AKILESH ESWARAN & MRS. PIA MUKHERJEERADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED30/06/2020
CC006000000192762MR. SATISH AGRAWALRADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED24/06/2020
CC006000000192926MR. VENKATAKRISHNAN NEELAKANTANRADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED24/06/2020
CC006000000192927MR. SIDDHARTH ANKATHIL AND MRS. KIVYA GUPTARADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED04/07/2020
CC006000000192928MR. VIPUL KANT MISHRA AND MRS. ALKA MISHRARADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED25/06/2020
CC006000000192946MR.VAIKUNTAM SRINIVASAN AND MRS. JANAKI SRINIVASANRADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED02/07/2020
CC006000000193009MR. ABDUL ABDULLA RAOOF AND MRS. SULEKA ABDUL RAOOFRADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED21/07/2020
CC006000000193013MR. RAJARAM PRAKASH WAGH AND MRS. VRUNDA PRAKASH WALAWALKARRADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED16/11/2020
CC006000000193014MR. YADAGIRI RAO JUPALLY AND MRS. JYOTHSNA KADAPARTHIRADIUS ESTATES ND DEVELOPERS PRIVATE LIMITED30/06/2020
CC006000000193069MR. RAMANATHAN ELAYAPERUMAL & MRS. RAJALAKSHMI ALSO KNOWN AS KANNATHAL VAIRAVANRADIUS ESTATES AND DEVELOPERS PRIVATE LIMITED24/06/2020
CC006000000193754Kunal ChaudharyRadius Estates & Developers Pvt. Ltd. (Formerly known as Vishwaroop Estates & Developers Pvt. Ltd.)04/09/2020
CC006000000195529MR. AKSHAY SANDEEP PASARKAR AND MRS. ARCHANA PASARKARMIG (BANDRA) REALTORS AND BUILDERS PRIVATE LIMITED09/01/2021
CC006000000196468Nirav Vikram ManiarMIG (Bandra) Realtors and Builders Pvt. Ltd26/04/2021
CC006000000196434Chirag OzaRadius Ten BKC22/03/2021
CC006000000196993RAMJEET SINGH ARORARADIUS ESTATE & DEVELOPERS PVT. LTD.13/05/2021
CC006000000196997MURKALA KRISHNARAORADIUS ESTATE & DEVELOPERS PVT. LTD.13/05/2021
CC006000000197083MRS. BINA KHAYALIRAM JOSHIRADIUS ESTATES & DEVELOPERS PVT LTD26/05/2021
CC006000000396398Radius Estates & Developers Private LimitedKunal Chaudhary24/06/2023
CC006000000398066Radius Estates & Developers Private LimitedSajid Sulaiman04/11/2023
CC006000000398067Radius Estates & Developers Private LimitedShivashish Mishra04/11/2023
CC006000000398068Radius Estates & Developers Private LimitedVenkatesham Neela05/11/2023
CC006000000398069Radius Estates & Developers Private LimitedMadhusudhana Reddy Upparlapalli05/11/2023
CC006000000398070Radius Estates & Developers Private LimitedGautam Bhargava05/11/2023
CC006000000398071Radius Estates & Developers Private LimitedAkilesh Eswaran05/11/2023
CC006000000398072Radius Estates & Developers Private LimitedSatish Agrawal05/11/2023
CC006000000398073Radius Estates & Developers Private LimitedVenkatkrishnan Neelkantan05/11/2023
CC006000000398074Radius Estates & Developers Private LimitedSiddharth Anathil05/11/2023
CC006000000398075Radius Estates & Developers Private LimitedVipulkant Mishra05/11/2023
CC006000000398076Radius Estates & Developers Private LimitedVaikuntan Srinivasan05/11/2023
CC006000000398077Radius Estates & Developers Private LimitedAbdul Abdulla Raoof05/11/2023
CC006000000398078Radius Estates & Developers Private LimitedYadagiri Rao Jupally05/11/2023
CC006000000398079Radius Estates & Developers Private LimitedRamanathan Elayaperumal05/11/2023
CC006000000398084Radius Estates & Developers Private LimitedSamir Shah06/11/2023
CC006000000398085Radius Estates & Developers Private LimitedRamanjeet Singh Arora06/11/2023
CC006000000398086Radius Estates & Developers Private LimitedMurkala Krishnarao06/11/2023
CC006000000398087Radius Estates & Developers Private LimitedManish Ratilal Patel06/11/2023
CC006000000398088Radius Estates & Developers Private LimitedLilian Prem06/11/2023
CC006000000398089Radius Estates & Developers Private LimitedChetan Kamat06/11/2023
CC006000000398090Radius Estates & Developers Private LimitedBhaskar Neela06/11/2023
CC006000000398091Radius Estates & Developers Private LimitedBala Raman Nayar06/11/2023
CC006000000398092Radius Estates & Developers Private LimitedSamir Taranath Hosangady06/11/2023
CC006000000398093Radius Estates & Developers Private LimitedRajaram Wagh06/11/2023
CC006000000429578Radius Estates & Developers Private LimitedAjay Luthra09/03/2024
CC006000000591139MIG (Bandra) Realtors & Builders Private LimitedSanjay Kabra12/07/2024
CC12401233Amin Abdul Rasool VirjiMIG (Bandra) Realtors & Builders Private Limited25/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed198

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 198 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20240630 FORM 1.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20240930 FORM 1.pdf20 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20241231 FORM 1.pdf20 Feb 2025
Certificates of CA (Form 3)File: 20240630 FORM 3.pdf20 Feb 2025
Certificates of CA (Form 3)File: 20240930 FORM 3.pdf20 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20240630 FORM 2.pdf20 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20240930 FORM 2.pdf20 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20240930 FORM 2.pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: March 2024.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold unsold InventoryList for March 2023.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold InventoryList for March 2024.pdf5 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: MIG Form 5 March 2023.pdf5 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Annexure F.pdf3 Jun 2024
Declaration in FORM BFile: 2024 Form B Ten BKC.pdf3 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20230930 FORM 1.pdf3 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20231231 FORM 1.pdf3 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20240331 FORM 1.pdf3 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20220630 FORM 2.pdf3 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20220930 FORM 2.pdf3 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20221231 FORM 2.pdf3 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20230331 FORM 2.pdf3 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20230630 FORM 2.pdf3 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20230930 FORM 2.pdf3 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20231231 FORM 2.pdf3 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20240331 FORM 2.pdf3 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 20220331 FORM 2A.pdf3 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ten BKC 2022 2023.pdf3 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Ten BKC 2023 2024.pdf3 Jun 2024
Certificates of CA (Form 3)File: 20221231 FORM 3.pdf3 Jun 2024
Certificates of CA (Form 3)File: 20230331 FORM 3.pdf3 Jun 2024
Certificates of CA (Form 3)File: 20230630 FORM 3.pdf3 Jun 2024
Certificates of CA (Form 3)File: 20230930 FORM 3.pdf3 Jun 2024
Certificates of CA (Form 3)File: 20231231 FORM 3.pdf3 Jun 2024
Certificates of CA (Form 3)File: 20240331 FORM 3.pdf3 Jun 2024
Certificates of CA (Form 3)File: 20220930 FORM 3 A.pdf3 Aug 2023
Certificates of CA (Form 3)File: 20220930 FORM 3 B.pdf3 Aug 2023
Certificates of CA (Form 3)File: 20220930 FORM 3 C.pdf3 Aug 2023
Declaration in FORM BFile: 2023 FORM B.pdf24 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20220630 FORM 1.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20220930 FORM 1.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20221231 FORM 1.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20230331 FORM 1.pdf22 May 2023
Form 2AFile: 20220331 FORM 2A.pdf22 May 2023
Certificates of CA (Form 3)File: 20220630 FORM 3 A.pdf22 May 2023
Certificates of CA (Form 3)File: 20220630 FORM 3 B.pdf22 May 2023
Certificates of CA (Form 3)File: 20220630 FORM 3 C.pdf22 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 20230327 Circular No 43 Self Declaration.pdf29 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 20230327 Order No 34 Declaration compressed.pdf29 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 20230328 Circular No 43 Declaration cum undertaking.pdf29 Mar 2023
Proforma of Agreement for saleFile: TEN BKC AFS DB VR 2023.pdf25 Feb 2023
Proforma of Agreement for saleFile: TEN BKC AFS RD VR 2023.pdf25 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: September 2023.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 20190930 FORM 5.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 20200929 FORM 5.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 20201027 FORM 5 R.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 20220915 FORM MIG.pdf2 Feb 2023
Proforma of Agreement for saleFile: DB RERA Agreement for Sale Part I.pdf4 Jan 2023
Proforma of Agreement for saleFile: DB RERA Agreement for Sale Part II.pdf4 Jan 2023
Proforma of Agreement for saleFile: DB RERA Agreement for Sale Part III.pdf4 Jan 2023
Proforma of Allotment letterFile: DB RERA Agreement for Sale Part IV.pdf4 Jan 2023
Proforma of Agreement for saleFile: DB RERA Agreement for Sale Part IV.pdf4 Jan 2023
Proforma of Agreement for saleFile: DB RERA Agreement for Sale Part V.pdf4 Jan 2023
Proforma of Agreement for saleFile: DB RERA Agreement for Sale Part VI.pdf4 Jan 2023
Proforma of Agreement for saleFile: DB RERA Agreement for Sale Part VII.pdf4 Jan 2023
Proforma of Agreement for saleFile: DB RERA Agreement for Sale Part VIII.pdf4 Jan 2023
Proforma of Agreement for saleFile: DB RERA Agreement for Sale Part I X.pdf4 Jan 2023
Proforma of Agreement for saleFile: RD RERA Agreement for Sale Part I.pdf4 Jan 2023
Proforma of Agreement for saleFile: RD RERA Agreement for Sale Part II.pdf4 Jan 2023
Proforma of Agreement for saleFile: RD RERA Agreement for Sale Part III.pdf4 Jan 2023
Proforma of Agreement for saleFile: RD RERA Agreement for Sale Part IV.pdf4 Jan 2023
Proforma of Agreement for saleFile: RD RERA Agreement for Sale Part V.pdf4 Jan 2023
Proforma of Agreement for saleFile: RD RERA Agreement for Sale Part VI.pdf4 Jan 2023
Proforma of Agreement for saleFile: RD RERA Agreement for Sale Part VII.pdf4 Jan 2023
Building plan approvalFile: 20220509 Amended IOD MIG Group I Ten BKC Letter.pdf9 Nov 2022
Building Plan Approval (IOD)File: 20220509 Amended IOD MIG Group I Ten BKC Letter.pdf9 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220616 Ten BKC Further CC.pdf9 Nov 2022
Declaration about Commencement CertificateFile: 20221102 Declaration of CC.pdf9 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20220331 FORM 1.pdf7 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20221107 FORM 2.pdf7 Nov 2022
Certificates of CA (Form 3)File: 20220331 FORM 3 page 1-4.pdf7 Nov 2022

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TEN BKC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra East6,700+ in Mumbai Suburban

2 kmTEN BKCCompleted 57Lapsed / revoked 25Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 159 registered projects within 2 km.

Builder: MIG (Bandra) Realtors & Builders Private Limited

MIG (Bandra) Realtors & Builders Private Limited has 1 registration on MahaRERA, including TEN BKC. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that TEN BKC shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if TEN BKC is delayed beyond 5 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TEN BKC?

The registered promoter entity is MIG (Bandra) Realtors & Builders Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TEN BKC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TEN BKC?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for TEN BKC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TEN BKC?

The professionals named in the filing: Architect: Space Age Consultants; Architect: Girish Chaudhari; Architect: ARCHITECT HAFEEZ CONTRACTOR Design Architect; Engineer: Jagdish Kadu; Chartered Accountant: B B Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TEN BKC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TEN BKC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TEN BKC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.