Red flags

  • Possession 2 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
18 of 151Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 218 documents Report an error

TECHOPSGRAND is a Others project by Techops Infrastructure Pvt. Ltd. in Nagpur, Maharashtra, registered with MahaRERA as P50500022373 on 16 Sep 2019. Possession was promised by 28 Aug 2026 and is now 2 months past that date. The completion date has moved by 12 months from the original filing. 133 of the 151 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameTECHOPSGRAND
  • TypeOthers
  • Location
    • AYODHYA NAGAR CEMENT ROAD SAKKARDARA NAGPUR
    • SAKKARDARA NAGPUR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440024
  • Pincode440024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500022373
  • ReraGenie IDRG-MH-57653

Builder

  • NameTechops Infrastructure Pvt. Ltd.
  • Entity typeCompany
  • CINU45200MH2007PTC175909
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorsRAJNRDRA VISHWESHWAR NAKADE, ANIL MADHUKAR RAOJI KALE, ISHAN RAVINDRA BARAI
  • Other registrations4 more →
  • Completed1 of 5
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

2 months past promisethis monthRegisteredSep 2019First promiseAug 2025Revised toAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Sep 2019
  • Promised completion28 Aug 2026
  • Revised completionRevised to 28 Aug 2026 (originally 28 Aug 2025)
  • Buildings1 building record
  • Documents filed218 files

Current status

88%133 of 151 units booked
99.7%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TECHOPS GRANDNA13108071151

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

TECHOPS GRAND: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed356

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots356
Closed/Covered356

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,327 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNAGPUR MUNICIPAL CORPORATION
Permissible FSI11343.73
Proposed, not sanctioned11,344 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSME BRANCH RAVI NAGAR NAGPUR
Estimated costRs 31.98 cr
Cost incurredRs 31.87 cr
Work done99.66%
BuildingWingEstimatedIncurred
-NARs 31.98 crRs 31.87 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSYED MOBIN
Engineeravinash hajare
Chartered AccountantSAMEER DIVECHA
Chartered AccountantANJALI DIVECHA
PartnerRole in project
Techops Infrastructure Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20032620296Aug 2025 → Aug 2026

Reason as filed by the promoterTo, The Secretary, Maharashtra Real Estate Regulatory Authority (MahaRERA) Reasons for Seeking Extension: 1. Rejection of Occupancy Certificate (OC): Despite receiving the OC on 10th July 2025, MahaRERA (submitted online on 15th July,2025) rejected closure request due to discrepancies identified during scrutiny: - In Built-Up Area (BUA) area - Building details and car parking information 2. Project Completion Status: The project stands fully constructed and completed as per the sanctioned plans. The OC has been issued by the competent authority, confirming structural completion and compliance.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed218

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 218 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A TECHOPS GRAND 25-26.pdf27 May 2026
Form 5 (FY 2025-2026)File: form 5 25-26.pdf26 May 2026
Building plan approvalFile: SANCTION MAP.pdf12 May 2026
Withdrawal Update Form 1File: grand form 1 dec 25.pdf11 May 2026
Withdrawal Update Form 1File: grand form 1 mar 26.pdf11 May 2026
Withdrawal Update Form 2File: grand form 2 dec 25.pdf11 May 2026
Withdrawal Update Form 2File: grand form 2 MAR 26.pdf11 May 2026
Withdrawal Update Form 3File: CA CERT DEC 25.pdf11 May 2026
Withdrawal Update Form 3File: techops grand march 26 c a certificate.pdf11 May 2026
Form 1File: arc cer 2019.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: ca cert 2019.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 2019.pdf31 Dec 2025
Form 1File: arc cer 2019.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: ca cert 2019.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 2019.pdf31 Dec 2025
Form 1File: arc cer 2019.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: ca cert 2019.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 2019.pdf31 Dec 2025
Form 1File: arc cer 2019.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: ca cer july 20.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 20.pdf31 Dec 2025
Form 1File: arc cer 2019.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: ca cer july 20.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 20.pdf31 Dec 2025
Form 1File: arc cer 2019.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: ca cer july 20.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 20.pdf31 Dec 2025
Form 1File: arc cer 2019.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: ca cer july 20.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 20.pdf31 Dec 2025
Form 1File: arc cer feb 22 techops grand.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: CA CERTIFICATE FORM 3 march 21.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 21.pdf31 Dec 2025
Form 1File: arc cer feb 22 techops grand.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: eng cer 2019 techops grand.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: CA CERTIFICATE FORM 3 march 21.pdf31 Dec 2025
Form 1File: arc cer feb 22 techops grand.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: CA CERTIFICATE FORM 3 march 21.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 21.pdf31 Dec 2025
Form 1File: arc cer feb 22 techops grand.pdf31 Dec 2025
Form 2File: eng cer 2019 techops grand.pdf31 Dec 2025
Form 3File: CA CERTIFICATE FORM 3 march 21.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 21.pdf31 Dec 2025
Form 1File: arc cer mar 22 techops grand.pdf31 Dec 2025
Form 2File: eng cer march 22.pdf31 Dec 2025
Form 3File: ca cer mar 22.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 22.pdf31 Dec 2025
Form 1File: arc cer mar 22 techops grand.pdf31 Dec 2025
Form 2File: eng cer march 22.pdf31 Dec 2025
Form 3File: ca cer mar 22.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 22.pdf31 Dec 2025
Form 1File: arc cer mar 22 techops grand.pdf31 Dec 2025
Form 2File: eng cer march 22.pdf31 Dec 2025
Form 3File: ca cer mar 22.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold 22.pdf31 Dec 2025
Form 1File: architect certificate for qrt sept 23 upload.pdf31 Dec 2025
Form 2File: Engineer Certificate for qtr sep upload.pdf31 Dec 2025
Form 3File: FORM 3 till 30-09-2023.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: revised booked techops grand with sign.pdf31 Dec 2025
Form 1File: architect certificate for qrt sept 23 upload.pdf31 Dec 2025
Form 2File: Engineer Certificate for qtr sep upload.pdf31 Dec 2025
Form 3File: FORM 3 till 30-09-2023.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: revised booked techops grand with sign.pdf31 Dec 2025
Form 5 (FY 2020-2021)File: FORM 5 19-20 OLD.pdf31 Dec 2025
Form 5 (FY 2019-2020)File: FORM 5 19-20 OLD.pdf29 Dec 2025
Form 5 (FY 2021-2022)File: FORM 5 21-22 OLD.pdf29 Dec 2025
Form 5 (FY 2022-2023)File: CA CERTIFICATE 1-4-22 TO 31-3-23.pdf26 Dec 2025
Form 5 (FY 2023-2024)File: CA CERTIFICATE 1-4-23 TO 31-3-24.pdf26 Dec 2025
Form 5 (FY 2024-2025)File: CA CERTIFICATE 1-4-24 TO 31-3-25.pdf26 Dec 2025
Form 2A (FY 2021-2022)File: 2A 31st march 22.pdf23 Dec 2025

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
TECHOPS INFRASTRUCTURE PVT LTDP50500008242Umred Road, Nagpur-Aug 2017OngoingDec 2026Not due yet
TECHOPS ROYALP50500051236DIGHORI, Nagpur119Jun 2023OngoingFeb 2026Not delivered
Techops GloryP50500010692Nagpur (M Corp.), Nagpur-Aug 2017CompletedDec 2019Dec 2019

How this compares with Nagpur

88%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TECHOPSGRAND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAKKARDARA NAGPUR2,800+ in Nagpur

2 kmTECHOPSGRANDCompleted 4Lapsed / revoked 5Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: Techops Infrastructure Pvt. Ltd.

Techops Infrastructure Pvt. Ltd. has 5 registrations on MahaRERA, including TECHOPS INFRASTRUCTURE PVT LTD and Techops Glory. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if TECHOPSGRAND is delayed beyond 28 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TECHOPSGRAND?

The registered promoter entity is Techops Infrastructure Pvt. Ltd., a company as per the filing. Its CIN U45200MH2007PTC175909 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TECHOPSGRAND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TECHOPSGRAND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TECHOPSGRAND?

The professionals named in the filing: Architect: SYED MOBIN; Engineer: avinash hajare; Chartered Accountant: SAMEER DIVECHA; Chartered Accountant: ANJALI DIVECHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TECHOPSGRAND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TECHOPSGRAND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TECHOPSGRAND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.