Home / Browse projects / Nagpur, Maharashtra / Vinayak Tower

Registered No litigation declared Commercial project

Vinayak Tower

By Goverdhan Infraventures (Mumbai) LLP

RG-MH-65401 · RERA P50500054252 · Last updated on MahaRERA portal: 8 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
38 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Vinayak Tower is a Commercial project by Goverdhan Infraventures (Mumbai) LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500054252 on 10 Jan 2024. Possession is promised by 31 Mar 2027. 20 of the 58 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameVinayak Tower
  • TypeCommercial
  • Location
    • Kh. No. 587
    • 587/1
    • 588 to 593
    • CTS No. 212
    • 213
    • Sheet No. 309
    • NMC House no. 1288/J
    • ward no 20
    • Gurudev Nagar
    • Nandanwan
    • Nagpur
    • Nagpur (M Corp.)
    • ...
  • Pincode440024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500054252
  • ReraGenie IDRG-MH-65401

Builder

  • NameGoverdhan Infraventures (Mumbai) LLP
  • Entity typePartnership
  • PartnersRitesh Kisandas Jhawar, Jasbirsingh Gurucharansingh Arora, Vinil Shyamsundar Kabra, Rajesh Asharam Kabra, Manish Kamalkishore Kabra, Gautam Jaigopal Kabra, Gourav Jaigopal Kabra, Abhishek Kamalkishore Kabra

Key dates

this monthRegisteredJan 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jan 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed89 files

Current status

34%20 of 58 units booked
100.0%Work done, per cost certificate

Figures as on 8 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vinayak TowerNA9005858

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

Vinayak Tower: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed315

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots315
Closed/Covered315

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,561 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI6649.7
Proposed, not sanctioned6,650 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch204, MASHURAWALA BAUG, DHARAMPETH EXTN,, SHANKAR NAGAR ROAD, NAGPUR, MAHARASHTRA-440010
Estimated costRs 26.96 cr
Cost incurredRs 26.96 cr
Work done100.0%
BuildingWingEstimatedIncurred
Vinayak TowerNARs 21.57 crRs 21.57 cr
-NARs 5.39 crRs 5.39 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumit Jhawar Jhawar
EngineerPatankar Consultants Private Limited
EngineerExcel Multiprojects Private Limited
EngineerAlhad Joshi
Chartered AccountantAgrawal Saraf & Associates
Chartered AccountantAgrawal Ankita & Co
PartnerRole in project
Goverdhan Infraventures (Mumbai) LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf8 May 2026
Withdrawal Update Form 1File: Architect Certificate.pdf8 May 2026
Withdrawal Update Form 1File: Architect Certificate.pdf8 May 2026
Withdrawal Update Form 2File: Eng Certificate.pdf8 May 2026
Withdrawal Update Form 2File: Eng Certificate.pdf8 May 2026
Withdrawal Update Form 2File: Goverdhan Infraventures.pdf8 May 2026
Withdrawal Update Form 3File: CA Certificate (1).pdf8 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf8 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf8 May 2026
Withdrawal Update Form 1File: Form 01.pdf4 Dec 2025
Withdrawal Update Form 2File: Form 02.pdf4 Dec 2025
Withdrawal Update Form 3File: Form 03.pdf4 Dec 2025
Form 5 (FY 2024-2025)File: Signed Form 5 .pdf14 Oct 2025
Withdrawal Update Form 1File: Form 01.pdf17 Jul 2025
Withdrawal Update Form 1File: Form 01.pdf17 Jul 2025
Withdrawal Update Form 1File: Form 01.pdf17 Jul 2025
Withdrawal Update Form 1File: Form 01.pdf17 Jul 2025
Withdrawal Update Form 2File: Form 02.pdf17 Jul 2025
Withdrawal Update Form 2File: Form 02.pdf17 Jul 2025
Withdrawal Update Form 2File: Form 02.pdf17 Jul 2025
Withdrawal Update Form 2File: Form 02.pdf17 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf17 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf17 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf17 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf17 Jul 2025
Form 1File: Form 01.pdf16 Jul 2025
Form 2File: Form 02.pdf16 Jul 2025
Form 3File: Form 03.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory.pdf16 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf16 Jul 2025
Form 1File: Form 1 Architech Certificate.pdf1 Jul 2025
Form 2File: Form 2- Engineer Certificate.pdf1 Jul 2025
Form 3File: Form 03 CA Certificate.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory March 24.pdf1 Jul 2025
Form 1File: Form 1 Architech Certificate.pdf1 Jul 2025
Form 2File: Form 2- Engineer Certificate_June.pdf1 Jul 2025
Form 3File: Form 03 CA Certificate.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory June 24.pdf1 Jul 2025
Form 1File: FORM 01.pdf1 Jul 2025
Form 2File: FORM 02.pdf1 Jul 2025
Form 3File: Form 03.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory Dec 24.pdf1 Jul 2025
Form 1File: Form 1- Architect's Certificate_Sep.pdf1 Jul 2025
Form 2File: Form 02.pdf1 Jul 2025
Form 3File: Form 03.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold or booked inventory Sep 24.pdf1 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 format 2023-24.pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02.pdf10 Dec 2024
Declaration about Commencement CertificateFile: Declaration for CC.pdf10 Dec 2024
Building plan approvalFile: Revised Sanction_compressed.pdf9 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Building Permit_Revised.pdf9 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised Sanction_compressed.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer Certificate.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer Certificate_June.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 CA Certificate.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 CA Certificate.pdf12 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Combined CC.pdf4 Jan 2024
Declaration about Commencement CertificateFile: Decleration_about_commencement_certifictae[1]_Jhawar.pdf4 Jan 2024
Other - TechnicalFile: New Appendix F PLINTH INTIMATION.pdf4 Jan 2024
Copy of the legal title reportFile: Search Report.pdf15 Dec 2023
Proforma of Agreement for saleFile: Model Agreement to sell.pdf15 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Declaration for deviation wrt model agreement.pdf15 Dec 2023
Building plan approvalFile: MAP 1.pdf20 Nov 2023
Building plan approvalFile: MAP 2.pdf20 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: MAP 1.pdf20 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: MAP 2.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01.pdf20 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02.pdf20 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Seperate Bank Account.pdf16 Nov 2023
Other - LegalFile: Sale Deed_Vinayak Towers Land_compressed.pdf16 Nov 2023
Other - TechnicalFile: CC Mail.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03.pdf26 Oct 2023
Layout approvalFile: Sanction Plan_Page_1.pdf14 Oct 2023

How this compares with Nagpur

34%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vinayak Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gurudev Nagar, Nandanwan, Nagpur2,800+ in Nagpur

2 kmVinayak TowerCompleted 3Lapsed / revoked 7Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: Goverdhan Infraventures (Mumbai) LLP

Goverdhan Infraventures (Mumbai) LLP has 1 registration on MahaRERA, including Vinayak Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Vinayak Tower is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vinayak Tower?

The registered promoter entity is Goverdhan Infraventures (Mumbai) LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vinayak Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vinayak Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vinayak Tower?

The professionals named in the filing: Architect: Sumit Jhawar Jhawar; Engineer: Patankar Consultants Private Limited; Engineer: Excel Multiprojects Private Limited; Engineer: Alhad Joshi; Chartered Accountant: Agrawal Saraf & Associates; Chartered Accountant: Agrawal Ankita & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vinayak Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vinayak Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vinayak Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.