Home / Browse projects / Nagpur, Maharashtra / TECHOPS INFRASTRUCTURE PVT LTD
TECHOPS INFRASTRUCTURE PVT LTD
By Techops Infrastructure Pvt. Ltd.
RG-MH-01653 · RERA P50500008242 · Last updated on MahaRERA portal: 11 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TECHOPS INFRASTRUCTURE PVT LTD is a Residential / Group Housing project by Techops Infrastructure Pvt. Ltd. in Nagpur, Maharashtra, registered with MahaRERA as P50500008242 on 18 Aug 2017. Possession is promised by 30 Dec 2026. 1 complaint is on record with the regulator.
At a glance
Project
- NameTECHOPS INFRASTRUCTURE PVT LTD
- TypeResidential / Group Housing
- Location
- Gonhi (Sim)
- Umred Road
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440023
- Pincode440023
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500008242
- ReraGenie IDRG-MH-01653
Builder
- NameTechops Infrastructure Pvt. Ltd.
- Entity typeCompany
- CINU45200MH2007PTC175909
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorsRAJNRDRA VISHWESHWAR NAKADE, NARENDRA TEJRAMJI DAKHALE, ANIL MADHUKAR RAOJI KALE, ISHAN RAVINDRA BARAI
- Other registrations4 more →
- Completed1 of 5
- Past their filed date1
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Aug 2017
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings17 building records
- Documents filed147 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 8 | 7 | 0 | 0 | 0 |
| WING C | NA | 7 | 0 | 0 | 0 | 0 |
| WING D | NA | 7 | 0 | 0 | 0 | 0 |
| WING E | NA | 7 | 0 | 0 | 0 | 0 |
| WING F | NA | 7 | 0 | 0 | 0 | 0 |
| WING G | NA | 7 | 0 | 0 | 0 | 0 |
| WING I | NA | 7 | 0 | 0 | 0 | 0 |
| WING J | NA | 8 | 0 | 0 | 0 | 0 |
| WING K | NA | 6 | 0 | 0 | 0 | 0 |
| WING L | NA | 6 | 0 | 0 | 0 | 0 |
| WING M | NA | 6 | 0 | 0 | 0 | 0 |
| WING N | NA | 6 | 0 | 0 | 0 | 0 |
| WING B | NA | 8 | 0 | 0 | 0 | 0 |
| BLOCK A | NA | 2 | 0 | 0 | 0 | 0 |
| BLOCK B | NA | 2 | 0 | 0 | 0 | 0 |
| BLOCK C | NA | 2 | 0 | 0 | 0 | 0 |
| BLOCK D | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building17
As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
164 of 187 construction stages are filed complete across 17 buildings. The stage furthest along is Podiums (if any), at 0%.
WING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING E91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING F91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING I91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING J91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING K91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING L91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING M91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING N0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BLOCK A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BLOCK B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BLOCK C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BLOCK D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A | 1 | 1 | 2 |
| WING C | 1 | 1 | 2 |
| WING D | 1 | 1 | 2 |
| WING E | 1 | 1 | 2 |
| WING F | 1 | 1 | 2 |
| WING G | 1 | 1 | 2 |
| WING I | 1 | 1 | 2 |
| WING J | 1 | 1 | 2 |
| WING K | 1 | 1 | 2 |
| WING L | 1 | 1 | 2 |
| WING M | 1 | 1 | 2 |
| WING N | 1 | 1 | 2 |
| WING B | 1 | 1 | 2 |
| BLOCK A | 0 | 1 | 1 |
| BLOCK B | 0 | 1 | 1 |
| BLOCK C | 0 | 1 | 1 |
| BLOCK D | 0 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Avinash Hazare |
| Architect | Vistaar |
| Engineer | AVINASH HAJARE |
| Chartered Accountant | Anjali Divecha |
| Chartered Accountant | Sameer Divecha |
| Chartered Accountant | AS DIVECHA AND ASSOCIATES |
| Chartered Accountant | S N DIVECHA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| Techops Infrastructure Pvt. Ltd. | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC004000000000019 | Yogesh Jiwankar | Techops Infrastructure Pvt. Ltd. | 01/01/2018 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed147
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 147 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: FORM 2A MAR 25.pdf | 11 Jun 2026 |
| Form 2A (FY 2017-2018)File: FORM 2A MAR 19.pdf | 11 Jun 2026 |
| Form 2A (FY 2018-2019)File: FORM 2A MAR 19.pdf | 11 Jun 2026 |
| Form 2A (FY 2019-2020)File: FORM 2A MAR 20.pdf | 11 Jun 2026 |
| Form 2A (FY 2020-2021)File: FORM 2A MAR 21.pdf | 11 Jun 2026 |
| Form 2A (FY 2021-2022)File: FORM 2A MAR 22.pdf | 11 Jun 2026 |
| Form 2A (FY 2022-2023)File: FORM 2A MAR 23.pdf | 11 Jun 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A MAR 24.pdf | 11 Jun 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A MAR 26.pdf | 11 Jun 2026 |
| Form 1File: arch cert mar 26 garden.pdf | 11 May 2026 |
| Form 2File: ENGINEER CERTIFICATE MAR 26 garden.pdf | 11 May 2026 |
| Form 3File: CA CERTIFICATE FORM 3.pdf | 11 May 2026 |
| Disclosure of Sold and Booked InventoryFile: garden sold unsold mar 26.pdf | 11 May 2026 |
| Form 1File: arc cert dec 25 garden.pdf | 4 Feb 2026 |
| Form 2File: Engineer Certificate Dec 25 techops GARDEN.pdf | 4 Feb 2026 |
| Form 3File: CA CERTIFICATE DEC 25.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: GARDEN SOLD UNSOLD DEC 25.pdf | 4 Feb 2026 |
| Form 1File: Architect Certificate JUN 22.pdf | 20 Nov 2025 |
| Form 2File: Engineers Certificate jun 22_compressed.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE_0002_11zon.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV JUNE 22.pdf | 20 Nov 2025 |
| Form 1File: Architect Certificate SEP 22.pdf | 20 Nov 2025 |
| Form 2File: Engineers Certificate SEP 22_compressed.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE_0003_11zon.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV SEPT 22.pdf | 20 Nov 2025 |
| Form 1File: Architect Certificate DEC 22.pdf | 20 Nov 2025 |
| Form 2File: Engineers Certificate DEC 22_compressed.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE_0004_11zon.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV DEC 22.pdf | 20 Nov 2025 |
| Form 1File: Architect Certificate MAR 23.pdf | 20 Nov 2025 |
| Form 2File: Engineers Certificate MAR 23.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV MAR 23.pdf | 20 Nov 2025 |
| Form 1File: Architect Certificate JUN 23.pdf | 20 Nov 2025 |
| Form 2File: Engineers Certificate JUN 23.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV JUN 23.pdf | 20 Nov 2025 |
| Form 1File: Architect Certificate SEP 23.pdf | 20 Nov 2025 |
| Form 2File: Architect Certificate SEP 23.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE_0006_11zon.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV SEPT 23.pdf | 20 Nov 2025 |
| Form 1File: Architect Certificate DEC 23.pdf | 20 Nov 2025 |
| Form 2File: Engineers Certificate DEC 23.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE_0008_11zon.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV DEC 23.pdf | 20 Nov 2025 |
| Form 1File: Architect Certificate MAR 24.pdf | 20 Nov 2025 |
| Form 2File: Engineers Certificate MAR 24.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE_0007_11zon.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV MAR 24.pdf | 20 Nov 2025 |
| Form 1File: Architect Certificate JUN 24.pdf | 20 Nov 2025 |
| Form 2File: Engineers Certificate JUN 24.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE_0001_11zon.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV JUNE 24.pdf | 20 Nov 2025 |
| Form 1File: Architect Certificate SEP 24.pdf | 20 Nov 2025 |
| Form 2File: Engineers Certificate SEP 24.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE_0009_11zon.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: BOOK SOLD INV SEPT 24.pdf | 20 Nov 2025 |
| Form 1File: ARCH CER DEC 24.pdf | 20 Nov 2025 |
| Form 2File: ENGINEER CER DEC 24.pdf | 20 Nov 2025 |
| Form 3File: CA CERTIFICATE DEC 2024.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of sold 1_0001.pdf | 20 Nov 2025 |
| Form 1File: arch cer sep25.pdf | 19 Nov 2025 |
| Form 2File: ENG CER TECHOPS GARDEN SEP 25.pdf | 19 Nov 2025 |
| Form 3File: C A CERT sep 25.pdf | 19 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD TECHOPS GARDEN SEP 25.pdf | 19 Nov 2025 |
| Form 5 (FY 2022-2023)File: 22-23.pdf | 25 Sep 2025 |
| Form 5 (FY 2023-2024)File: 23-24.pdf | 25 Sep 2025 |
| Form 5 (FY 2024-2025)File: 24-25.pdf | 25 Sep 2025 |
| Form 1File: ARCH CERT TECHOPS GARDEN JUN 25.pdf | 14 Aug 2025 |
| Form 2File: ENG CERT GARDEN JUN 25.pdf | 14 Aug 2025 |
| Form 3File: CA CERTIFICATE.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: GARDEN BOOKED SOLD 30 june 25.pdf | 14 Aug 2025 |
| Form 1File: TECHOPS GARDEN ARCH CER MAR 25.pdf | 18 Jul 2025 |
| Form 2File: ENG CER 31 MAR 25.pdf | 18 Jul 2025 |
| Form 3File: C A Certificate MAR 25.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: TECHOPS GARDEN SOLD UNSOLD 31 MAR 25.pdf | 18 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate JUN 22.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate SEP 22.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate DEC 22.pdf | 31 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate MAR 23.pdf | 31 Mar 2025 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| TECHOPS ROYALP50500051236 | DIGHORI, Nagpur | 119 | Jun 2023 | Ongoing | Feb 2026 | Not delivered |
| TECHOPSGRANDP50500022373 | SAKKARDARA NAGPUR, Nagpur | 151 | Sep 2019 | Completed | Aug 2025 | Jul 2025 |
| Techops GloryP50500010692 | Nagpur (M Corp.), Nagpur | - | Aug 2017 | Completed | Dec 2019 | Dec 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 147 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TECHOPS INFRASTRUCTURE PVT LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Umred Road2,800+ in Nagpur
PREMIER HERITAGE WADDHAMNA -182
PREMIER HERITAGE
PREMIER HERITAGE WADDHAMNA -181
PREMIER HERITAGE
SHREE RAM EMPIRE
SANJAY PAIDLEWAR, NITISH CHORDIA AND SHISH
SDPL Aashray Dabha II
SANDEEP DWELLERS PVT. LTD.
PREMIER HERITAGE WADDHAMNA -183
PREMIER HERITAGE
SDPL Suvarnabhumi
SANDEEP DWELLERS PVT. LTD.
See every Nagpur project, with the district possession charts
Builder: Techops Infrastructure Pvt. Ltd.
Techops Infrastructure Pvt. Ltd. has 5 registrations on MahaRERA, including TECHOPS INFRASTRUCTURE PVT LTD and Techops Glory. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if TECHOPS INFRASTRUCTURE PVT LTD is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TECHOPS INFRASTRUCTURE PVT LTD?
The registered promoter entity is Techops Infrastructure Pvt. Ltd., a company as per the filing. Its CIN U45200MH2007PTC175909 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TECHOPS INFRASTRUCTURE PVT LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against TECHOPS INFRASTRUCTURE PVT LTD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for TECHOPS INFRASTRUCTURE PVT LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TECHOPS INFRASTRUCTURE PVT LTD?
The professionals named in the filing: Architect: Avinash Hazare; Architect: Vistaar; Engineer: AVINASH HAJARE; Chartered Accountant: Anjali Divecha; Chartered Accountant: Sameer Divecha; Chartered Accountant: AS DIVECHA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TECHOPS INFRASTRUCTURE PVT LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback