Registration lapsed No litigation declared Others project

Tara Athena

By Nilesh Shivjee Singh

RG-MH-24739 · RERA P52100012400 · Last updated on MahaRERA portal: 6 Jan 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 12 complaints at MahaRERA
  • Completion date moved by 60 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
20 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 80%
12Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Tara Athena is a Others project by Nilesh Shivjee Singh in Pune, Maharashtra, registered with MahaRERA as P52100012400 on 1 Sep 2017. Possession was promised by 15 Dec 2023 and is now 34 months past that date. The completion date has moved by 60 months from the original filing. 12 complaints are on record with the regulator.

At a glance

Project

  • NameTara Athena
  • TypeOthers
  • Location
    • Kesnand
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100012400
  • ReraGenie IDRG-MH-24739

Builder

  • NameNilesh Shivjee Singh
  • Entity typeCompany
  • Managing DirectorNilesh Shivjee Singh
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

34 months past promisethis monthRegisteredSep 2017First promiseDec 2018Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion15 Dec 2023
  • Revised completionRevised to 15 Dec 2023 (originally 31 Dec 2018)
  • Buildings6 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA150000
Wing BNA150000
Wing CNA150000
Wing DNA150000
CommercialNA50000
AmenityNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 6 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 80%.

Wing A64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Wing B64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Wing C59%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Wing D59%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Commercial55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Amenity27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes5%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes40%
Street LightingYes5%
Community BuildingsYes5%
Treatment And Disposal Of Sewage And Sullage WaterYes1%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes15%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes10%

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered26
Open Space67
BuildingClosed/CoveredOpen SpaceTotal
Wing A121224
Wing B121224
Wing C11213
Wing D11213
Commercial01414
Amenity055

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Digambar Vasantrao ChavanPune (M Corp.)Pune
Somnath Maruti Jadhav and OthersPune (M Corp.)Pune
Gurling Gavasane and othersPune (M Corp.)Pune

Approvals and building plan

Permissible FSI12213.43
Proposed, not sanctioned12,213 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalyaninagar Pune

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumitesh Zinjurde
PartnerRole in project
Nilesh Shivjee Singh-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005017Dec 2018 → Apr 2020

Reason as filed by the promoterDUE FINANCIAL PROBLEM

EXT52100010100Dec 2018 → Oct 2021

Reason as filed by the promoterFINANCIAL PROBLEMS

EXT52100013163Dec 2018 → Dec 2023

Reason as filed by the promoterFINANCIAL PROBLEMS

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC005000000022109Mr. Sameer Dinkarrao JavalekarM/s Shivtara Properties Pvt Ltd20/11/2018
CC005000000022946Vinayak BhandareM/s. Shivtara Properties Pvt. Ltd.22/04/2019
CC005000000033487Suryakant BhondeShivtara Properties Pvt. Ltd.29/09/2019
CC005000000033488Sunil SuriShivtara Properties Pvt. Ltd.29/09/2019
CC005000000043745Yashwant RaiShivtara Properties Pvt. Ltd.04/12/2019
CC005000000075056Sunil SuriShivtara Properties Pvt. Ltd.07/01/2021
CC005000000075058Vinayak BhandareM/s Shivtara Properties Pvt. Ltd.11/01/2021
CC005000000147205Gurling Manmath GavasaneM/s Shivtara Properties Pvt. Ltd08/06/2022
CC005000000289984WELWORTH ENTERPRISESSHIVTARA PROPERTIES PVT LTD30/12/2023
CC12400083Prasad Bhagwan KulkarniNilesh Shivjee Singh12/09/2024
CC12500367Mrs. Jyoti Prakash KatariyaNilesh Shivjee Singh03/02/2025
CC12600547Prakash Birbhan KatariyaNilesh Shivjee Singh31/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Jul 2021

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: ENCUM ATH.pdf6 Jan 2023
Details of encumbrances concerned to LegalFile: ENCUM ATH.pdf6 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form5-17-18.pdf6 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5-18-19.pdf6 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5-19-20.pdf6 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5-20-21.pdf6 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 30-06-2021.pdf20 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 30-09-2021.pdf20 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31-12-2021.pdf20 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31-03-2022.pdf20 Dec 2022
Proforma of Agreement for saleFile: Rera Blank Draft Copy Tara Athena.pdf20 Dec 2022
Deviation Report with respect to Allotment letterFile: Allot Letter.pdf20 Dec 2022
Declaration about Commencement CertificateFile: Format-D.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: EC jUNE 2019.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: EC Sept 2019.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: EC Dec 2019.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: EC March 2020.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: EC June 2020.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: EC Sept 2020.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: EC Dec 2020.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: EC March 2021.pdf2 Jul 2021
Disclosure of sold/ booked inventoryFile: Discloser.pdf2 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Format-D.pdf2 Jul 2021
OtherFile: PFWC.pdf2 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: ATHENA NA REPORT Compressed.pdf21 Apr 2018
Layout approvalFile: Temp04767_Compressed.pdf31 Jul 2017
Building plan approvalFile: Temp04768_Compressed.pdf31 Jul 2017
Building plan approvalFile: Temp04769_Compressed.pdf31 Jul 2017
Building plan approvalFile: Temp04770_Compressed.pdf31 Jul 2017
Building plan approvalFile: Temp04771_Compressed.pdf31 Jul 2017
Building plan approvalFile: Temp04773_Compressed.pdf31 Jul 2017
Building plan approvalFile: Temp04773_Compressed.pdf31 Jul 2017
Building plan approvalFile: Temp04774_Compressed.pdf31 Jul 2017
Building plan approvalFile: Temp04775_Compressed.pdf31 Jul 2017
Building plan approvalFile: Temp04776_Compressed.pdf31 Jul 2017
PAN CardFile: Shivtara Properties Pvt Ltd Pan Card.pdf31 Jul 2017
Copy of the legal title reportFile: ATHENA SEARCH TITLE REPORT Compressed.pdf31 Jul 2017
Details of encumbrancesFile: Morgaje DEED.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Temp04767_Compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: Temp04768_Compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: Temp04769_Compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: Temp04770_Compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: Temp04771_Compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: Temp04773_Compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: Temp04773_Compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: Temp04774_Compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: Temp04775_Compressed.pdf31 Jul 2017
Building Plan Approval (IOD)File: Temp04776_Compressed.pdf31 Jul 2017
Declaration in FORM BFile: Tara Athena Wing A_Compressed.pdf31 Jul 2017
Declaration in FORM BFile: Tara Athena Wing Amenity_Compressed.pdf31 Jul 2017
Declaration in FORM BFile: Tara Athena Wing B_Compressed.pdf31 Jul 2017
Declaration in FORM BFile: Tara Athena Wing C_Compressed.pdf31 Jul 2017
Declaration in FORM BFile: Tara Athena Wing Commercial_Compressed.pdf31 Jul 2017
Declaration in FORM BFile: Tara Athena Wing D_Compressed.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate A Wing Athena.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate B Wing Athena.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate C Wing Athena.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate D Wing Athena.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate COMMERCIAL Tara Athena.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rew certificate AMENITY Tara Athena.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Tara Athena Compressed.pdf31 Jul 2017
Certificates of CA (Form 3)File: athena CA Certificate Compressed.pdf31 Jul 2017
Proforma of Allotment letterFile: Draft Agreement Athena.pdf31 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 60 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tara Athena on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kesnand13,700+ in Pune

2 kmTara AthenaCompleted 8Lapsed / revoked 9Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: Nilesh Shivjee Singh

Nilesh Shivjee Singh has 4 registrations on MahaRERA, including Tara Alicia and Tara Mondesire. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Tara Athena shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Tara Athena is delayed beyond 15 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tara Athena?

The registered promoter entity is Nilesh Shivjee Singh, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tara Athena?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Tara Athena?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Tara Athena?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tara Athena?

The professionals named in the filing: Architect: Sumitesh Zinjurde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tara Athena?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tara Athena. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tara Athena to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.