Completed No litigation declared Others project

Swayam

By Gala Habitats LLP

RG-MH-49555 · RERA P51900033034 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken
  • Rs 25.00 crore secured on the land, in favour of Aditya Birla Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
57 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

Swayam is a Others project by Gala Habitats LLP in Mahim West, 400016, registered with MahaRERA as P51900033034 on 3 Feb 2022. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 6 months from the original filing. 23 of the 80 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSwayam
  • TypeOthers
  • Location
    • Lady Jamshedji Road
    • Mahim West
    • 400016
  • Pincode400016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900033034
  • ReraGenie IDRG-MH-49555

Builder

  • NameGala Habitats LLP
  • Entity typePartnership
  • GSTIN27AARFG8924G1ZW
  • PartnersJaywantiben Shah, Rajendra Gala Shah
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredFeb 2022First promiseDec 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Feb 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed129 files

Current status

29%23 of 80 units booked
125.5%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SwayamNA2423641680

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Swayam: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered43

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area687 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Limited
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on22 Apr 2026

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI3558.88
Proposed, not sanctioned3,559 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBandra Ocean View CHS Next to Mehboob Studio Hill Road Bandra West Mumbai Mumbai 400050
Estimated costRs 24.32 cr
Cost incurredRs 30.52 cr
Work done125.53%
BuildingWingEstimatedIncurred
SwayamNARs 21.40 crRs 28.38 cr
-NARs 2.92 crRs 2.15 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThe Design Studio
EngineerSanjay Lala
EngineerParvez Siddiqui
Chartered AccountantRajesh Kumar Pande
PartnerRole in project
Gala Habitats LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28032620418Dec 2025 → Jun 2026

Reason as filed by the promoterThe project is completed in all respects and application for obtaining Occupation Certificate for the project from Municipal Corporation of Greater Mumbai was submitted on 25/11/2025. The Form-1 for December quarter compliance shows that all activities related to construction has been completed The said extension is necessitated only on the grounds that even though the project was completed well within timeline proposed for completion, the OC for the building was issued by MCGM only on 28/01/2026. Now that the OC has been issued, the Allottees have already been given/offered possession of thei

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Swayam Oc and Plan.pdf11 May 2026
Building plan approvalFile: Full OC and Plan (2).pdf28 Apr 2026
Withdrawal Update Form 1File: Swayam Form-1 Dec 2025.pdf22 Apr 2026
Withdrawal Update Form 2File: Swayam Form-2 Dec 2025.pdf22 Apr 2026
Withdrawal Update Form 3File: Swayam Form-3 Dec 2025.pdf22 Apr 2026
Form 1File: Swayam Form-1 March 2025.pdf24 Mar 2026
Form 2File: Swayam Form-2 March 2025.pdf24 Mar 2026
Form 3File: Swayam Form-3 March 2025.pdf24 Mar 2026
Disclosure of Sold and Booked InventoryFile: Swayam Sold Disclosure Mar 2025.pdf24 Mar 2026
Form 2A (FY 2024-2025)File: 2024-25_Form-2A.pdf9 Mar 2026
Withdrawal Update Form 1File: Swayam Form-1 Dec 2025.pdf18 Feb 2026
Withdrawal Update Form 2File: Swayam Form-2 Dec 2025.pdf18 Feb 2026
Withdrawal Update Form 3File: Swayam Form-3 Dec 2025.pdf18 Feb 2026
Withdrawal Update Form 1File: Swayam Form 1 202506.pdf11 Nov 2025
Withdrawal Update Form 2File: Swayam Engr Cert Form 2 202509.pdf11 Nov 2025
Withdrawal Update Form 3File: FORM 3- SWAYAM.pdf11 Nov 2025
Withdrawal Update Form 1File: Swayam Form 1 202506.pdf10 Nov 2025
Withdrawal Update Form 2File: Swayam Engr Cert Form 2 202509.pdf10 Nov 2025
Withdrawal Update Form 3File: FORM 3- SWAYAM.pdf10 Nov 2025
Form 1File: Form 1 202412.pdf24 Oct 2025
Form 2File: Form 2 202412.pdf24 Oct 2025
Form 3File: Form 3 202412.pdf24 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 202412.pdf24 Oct 2025
Withdrawal Update Form 1File: Swayam Form 1 202506.pdf7 Oct 2025
Withdrawal Update Form 2File: Swayam Form 2 202506.pdf7 Oct 2025
Withdrawal Update Form 3File: Swayam Form 3 202506.pdf7 Oct 2025
Building plan approvalFile: Amended approved Plan - Swayam.pdf31 Jul 2025
Commencement certificateFile: Further CC signed As per Amended Plan.pdf31 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 10042025 Form 2.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 110425.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GALA Form 3 Final 31122024.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: sold Inventory.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 202412.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate F1.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GH_S_Sep_24_Form-3.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GH_S_Sep_24_Form-3.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GH_S_Sep_24_Form-3.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: GH_S_Sep_24_Sold.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GH_S_Sep_24_Form-1.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GH_S_Sep_24_Form-2.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202406_CA.pdf20 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2023-24_Form-5.pdf20 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory Disclosure (1).pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202406_Er.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202406_Ar.pdf7 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202403_CA.pdf19 Jun 2024
Details of encumbrances concerned to FinanceFile: Revised Encumbrance Declaration.pdf23 May 2024
Details of encumbrances concerned to LegalFile: Revised Encumbrance Declaration.pdf23 May 2024
CERSAI detailsFile: CERSAI_Search_Report_200307536787_For_Asset_Based_Search_21_05_2024_16_36_08_329 (1).pdf23 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance declaration.pdf22 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance declaration.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-24_Form-2A.pdf22 May 2024
Disclosure of sold/ booked inventoryFile: 202403_Sold.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Swayam 130424 (1).pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202403_Ar.pdf11 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC- Full.pdf4 Mar 2024
Declaration about Commencement CertificateFile: 20240302_CC Declaration.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312_CA.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202312_Ar.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202312_Er.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: 202312_Sold.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202309_CA.pdf6 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2022-23_Form-5.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202309_Ar.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202309_Er.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: 202309_Sold.pdf15 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23_Form-2A.pdf25 Aug 2023
Disclosure of sold/ booked inventoryFile: 202306_Sold-R.pdf10 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202306_CA-1.pdf10 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202306_Er.pdf29 Jul 2023
Details of encumbrances concerned to FinanceFile: no legal Encumbrances declaration.pdf19 Jul 2023
Details of encumbrances concerned to LegalFile: no legal Encumbrances declaration.pdf19 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperarte Bank account declaration.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf8 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf4 Jul 2023
Disclosure of sold/ booked inventoryFile: RERA Swayam SOLD inventory.pdf4 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA Rajendra Gala Shah Declaration.pdf4 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA Jayawantiben Shah Declaration.pdf4 Jul 2023
Building plan approvalFile: Amended IoD.pdf29 Jun 2023
Layout approvalFile: Amended IoD Dwg_Part1.pdf29 Jun 2023

Keep Swayam on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahim West

2 kmSwayamCompleted 14Lapsed / revoked 16Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 60 registered projects within 2 km.

Builder: Gala Habitats LLP

Gala Habitats LLP has 2 registrations on MahaRERA, including Swayam and Paramount. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Swayam is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swayam?

The registered promoter entity is Gala Habitats LLP, a partnership as per the filing. Its GSTIN 27AARFG8924G1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swayam?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swayam?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swayam?

The professionals named in the filing: Architect: The Design Studio; Engineer: Sanjay Lala; Engineer: Parvez Siddiqui; Chartered Accountant: Rajesh Kumar Pande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swayam?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swayam. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swayam to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.