SWASTIKA

By VIKRAM RAM AGARWAL

RG-MH-52696 · RERA P52100048349 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 80%
10 of 116Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 172 documents Report an error

SWASTIKA is a Others project by VIKRAM RAM AGARWAL in Pune, Maharashtra, registered with MahaRERA as P52100048349 on 26 Dec 2022. Possession is promised by 31 Dec 2026. 106 of the 116 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSWASTIKA
  • TypeOthers
  • Location
    • MUNJERI
    • BIBEWADI
    • Market Yard
    • Haveli
    • Pune
    • 411037
  • Pincode411037
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048349
  • ReraGenie IDRG-MH-52696

Builder

  • NameVIKRAM RAM AGARWAL
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Dec 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed172 files

Current status

91%106 of 116 units booked
96.2%Work done, per cost certificate

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SWASTIKANA19191106116

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

SWASTIKA: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed155

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots155
Closed/Covered155

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,192 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 May 2026

Approvals and building plan

Sanctioning authorityPUNE MUNCIPAL CORPORATION BUILDING CONTROL DEPARTMENT
Permissible FSI12355.46
Proposed, not sanctioned4,658 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, PLOT NO 34,S NO687/2/B,PARIJAT CO OP SOC,BIBEWADI, PUNE
Estimated costRs 41.29 cr
Cost incurredRs 39.72 cr
Work done96.19%
BuildingWingEstimatedIncurred
SWASTIKANARs 38.29 crRs 37.16 cr
-NARs 3.00 crRs 2.56 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX ARCHITES ASSOCIATESCH
ArchitectM/s. Visioneers Design Studio
EngineerNILANJANA MAL
EngineerAvinash Bhalke
EngineerAvinash Kolte Avinash Kolte
EngineerM/s. S V & Associates
Chartered AccountantS R A & CO Shankar agarwal
Chartered AccountantMantri & PARIK
PartnerRole in project
VIKRAM RAM AGARWAL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed172

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 172 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCH CER 010426.pdf2 Jun 2026
Withdrawal Update Form 2File: Form 2 - Eng Certificate 010426.pdf2 Jun 2026
Withdrawal Update Form 3File: Form - 3_compressed.pdf2 Jun 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf29 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf29 Apr 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf15 Apr 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf15 Apr 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate (2).pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Eng Certificate 010126.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Withdrawal Update Form 3File: FORM 3 100724_compressed.pdf19 Feb 2026
Form 1File: Arch Certificate form 1 11025.pdf8 Jan 2026
Form 2File: Form 2 11025.pdf8 Jan 2026
Form 3File: Form 3 11025_compressed.pdf8 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Lifespaces_compressed.pdf8 Jan 2026
Form 5 (FY 2024-2025)File: Ram India Lifespace - Form 5 (1).pdf6 Oct 2025
Form 1File: Form 1 Architect Certificate 010723.pdf20 Aug 2025
Form 2File: Form 2 Engineer Certificate 010723.pdf20 Aug 2025
Form 3File: Form 3 CA Certificate 120723.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q1- Apr 23 to Jun 23.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q2- Jul 23 to Sep 23.pdf20 Aug 2025
Form 1File: Form 1 Arch Certificate 011023.pdf20 Aug 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE_compressed.pdf20 Aug 2025
Form 3File: FORM 3 CA CERTIFICATE_compressed.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q3-Oct 23 to Dec 23.pdf20 Aug 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf20 Aug 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf20 Aug 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf20 Aug 2025
Form 1File: Form 1 Architech Certificate 020424.pdf20 Aug 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE 050424.pdf20 Aug 2025
Form 3File: FORM 3 CA CERTIFICATE 050424_compressed.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q4-Jan 24 to Mar 24.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q1-Apr 24 to Jun 24.pdf20 Aug 2025
Form 1File: FORM 1 ARCH 100724.pdf20 Aug 2025
Form 2File: Eng Certificate 100724.pdf20 Aug 2025
Form 3File: FORM 3 100724_compressed.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q2- Jul 24 to Sep 24.pdf20 Aug 2025
Form 1File: FORM 1 ARCH CERTIFICCATE 281024.pdf20 Aug 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE 101024_compressed.pdf20 Aug 2025
Form 3File: FORM 3 CA Certificate_compressed.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q3- Oct 24 to Dec 24.pdf20 Aug 2025
Form 1File: FORM 1 ARCHITECH CERTIFICATE 02012025compressed.pdf20 Aug 2025
Form 2File: Engineer Certificate Form 2 Annexure B_compressed.pdf20 Aug 2025
Form 3File: Form 3 CA Certificate 03012025compressed.pdf20 Aug 2025
Form 1File: FORM 1 ARCHITECH CERTIFICATE 100425 compress.pdf20 Aug 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE 100425compressed.pdf20 Aug 2025
Form 3File: FORM 3 CA CERTIFICATE 10042025_compressed.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q4 - Jan 25 to Mar 25.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q1- Apr 25 to Jun 25.pdf20 Aug 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GREEN HIVE PLUS PHASE 2PHURSUNGI118CompletedDec 2022Sep 2022
GREEN HIVE PLUS PHASE 2PHURSUNGI118CompletedDec 2021Sep 2021

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SWASTIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BIBEWADI13,700+ in Pune

2 kmSWASTIKACompleted 161Lapsed / revoked 119Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 423 registered projects within 2 km.

Builder: VIKRAM RAM AGARWAL

VIKRAM RAM AGARWAL has 1 registration on MahaRERA, including SWASTIKA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SWASTIKA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWASTIKA?

The registered promoter entity is VIKRAM RAM AGARWAL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWASTIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWASTIKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWASTIKA?

The professionals named in the filing: Architect: CUBIX ARCHITES ASSOCIATESCH; Architect: M/s. Visioneers Design Studio; Engineer: NILANJANA MAL; Engineer: Avinash Bhalke; Engineer: Avinash Kolte Avinash Kolte; Engineer: M/s. S V & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWASTIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWASTIKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWASTIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.