Home / Browse projects / Thane, Maharashtra / SWASTIK HEIGHTS
SWASTIK HEIGHTS
RG-MH-29305 · RERA P51700028436 · Last updated on MahaRERA portal: 28 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 37 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SWASTIK HEIGHTS is a Residential / Group Housing project by ASHOK SURYANARAYAN SINGH in Thane, Maharashtra, registered with MahaRERA as P51700028436 on 2 Mar 2021. Possession was promised by 30 Sep 2023 and is now 37 months past that date. The completion date has moved by 12 months from the original filing. 43 of the 77 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete.
At a glance
Project
- NameSWASTIK HEIGHTS
- TypeResidential / Group Housing
- Location
- THAKURLI
- DOMBIVALI WEST
- Chavindra
- Thane
- 421201
- Pincode421201
- RERA no.P51700028436
- ReraGenie IDRG-MH-29305
Builder
- NameASHOK SURYANARAYAN SINGH
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on2 Mar 2021
- Promised completion30 Sep 2023
- Revised completionRevised to 30 Sep 2023 (originally 30 Sep 2022)
- Buildings2 building records
- Documents filed84 files
Current status
Figures as on 28 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D WING | NA | 9 | 7 | 49 | 0 | 49 |
| E WING | NA | 9 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 28 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 70%.
D WING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E WING70%
| Activity | Progress |
|---|---|
| Excavation | 70% |
| Basement (if any) | 70% |
| Podiums (if any) | 70% |
| Plinth | 70% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 28 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 70% |
| Community Buildings | Yes | 70% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed55
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| D WING | 22 | 10 | 32 |
| E WING | 15 | 8 | 23 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DESIGN MARK & ASSOCIATES |
| Engineer | DESIGN MARK & ASSOCIATES |
| Chartered Accountant | CA SANA SHAKIR SAYED |
| Chartered Accountant | Heena Nadeem Pawaskar |
| Partner | Role in project |
|---|---|
| ASHOK SURYANARAYAN SINGH | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterConstruction stopped because of financial issues& Overall industry slowdown during the period. Now construction work started at the site& is in full swing.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: FORM 3 (1).pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: FORM 3 (1).pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: FORM 3 (1).pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: FORM 3 (1).pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: FORM 3 (1).pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: FORM 3 (1).pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: Form 3 CA.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 1File: FORM 1 ARCHITECT.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: Form 3 CA.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 Q3.pdf | 28 Jul 2025 |
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: Form 3 CA.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: Form 3 CA.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 1File: FORM 1.pdf | 28 Jul 2025 |
| Form 2File: FORM 2.pdf | 28 Jul 2025 |
| Form 3File: Form 3 CA.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 28 Jul 2025 |
| Form 5 (FY 2020-2021)File: FORM 5 SIGN.pdf | 28 Jul 2025 |
| Form 5 (FY 2021-2022)File: FORM 5.pdf | 28 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf | 13 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 9 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: circular 29 dWing.pdf | 9 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: circular 29 e wing .pdf | 9 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf | 9 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 1 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf | 1 Nov 2022 |
| Declaration about Commencement CertificateFile: Swastik Circular 32.pdf | 29 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 15 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2a.pdf | 15 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: circular 29 dWing.pdf | 15 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: circular 29 e wing .pdf | 15 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 01.pdf | 10 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a.pdf | 10 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: C C CERTIFIACTE_compressed.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM NO 2A.pdf | 26 Feb 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 25 Feb 2021 |
| Copy of the legal title reportFile: Property Title search report_compressed.pdf | 24 Feb 2021 |
| OtherFile: Property Title search report_compressed.pdf | 23 Feb 2021 |
| Copy of the legal title reportFile: Title certificate D wing_1.pdf | 19 Feb 2021 |
| Copy of the legal title reportFile: title certificate e wing .pdf | 19 Feb 2021 |
| Layout approvalFile: d- wing blue print (1).pdf | 10 Feb 2021 |
| Layout approvalFile: e- wing blue print .pdf | 10 Feb 2021 |
| Building plan approvalFile: d- wing blue print (1).pdf | 10 Feb 2021 |
| Building plan approvalFile: e- wing blue print .pdf | 10 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: d- wing blue print (1).pdf | 10 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: e- wing blue print .pdf | 10 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: d- wing blue print (1).pdf | 10 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: e- wing blue print .pdf | 10 Feb 2021 |
| OtherFile: mothagao 2-pdf E WING 1.pdf | 10 Feb 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf | 4 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: cc e wing.pdf | 2 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: cc d wing.pdf | 2 Feb 2021 |
| Details of encumbrancesFile: encumbrance certificate.pdf | 1 Feb 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SWASTIK HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DOMBIVALI WEST7,600+ in Thane
MY CITY PHASE II CLUSTER 5 PART II
HORIZON PROJECTS PVT LTD
MY CITY PHASE II CLUSTER 5 PART III
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 3 Bldg No 27-28
Runwal Residency Private Limited
Runwal Gardens Phase 4 Bldg No. 35-36
Runwal Residency Private Limited
VASTU LUXURIA
LAUKIK DEVELOPMENT CORPORATION
KAPLESHWARA RESIDENCY
KAPLESHWARA HOMES LLP
See every Thane project, with the district possession charts
Builder: ASHOK SURYANARAYAN SINGH
ASHOK SURYANARAYAN SINGH has 1 registration on MahaRERA, including SWASTIK HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SWASTIK HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SWASTIK HEIGHTS is delayed beyond 30 Sep 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SWASTIK HEIGHTS?
The registered promoter entity is ASHOK SURYANARAYAN SINGH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SWASTIK HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SWASTIK HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SWASTIK HEIGHTS?
The professionals named in the filing: Architect: DESIGN MARK & ASSOCIATES; Engineer: DESIGN MARK & ASSOCIATES; Chartered Accountant: CA SANA SHAKIR SAYED; Chartered Accountant: Heena Nadeem Pawaskar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SWASTIK HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback