Registered No litigation declared Residential / Group Housing project

SWARGANDHA

By Amol Ajit Ravetkar

RG-MH-68488 · RERA P52100046968 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 40 months
  • 1 extension taken
  • Rs 14.00 crore secured on the land, in favour of HERO HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 8 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 40 months from the original
0 of 11Construction stages donefurthest along: Excavation, 80%
28 of 28Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

SWARGANDHA is a Residential / Group Housing project by Amol Ajit Ravetkar in Pune, Maharashtra, registered with MahaRERA as P52100046968 on 26 Sep 2022. Possession is promised by 31 Dec 2028. The completion date has moved by 40 months from the original filing. 0 of the 28 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSWARGANDHA
  • TypeResidential / Group Housing
  • Location
    • Gokhale Road
    • Bhamburda Shivajinagar
    • Haveli
    • Pune
    • 411016
  • Pincode411016
  • RERA no.P52100046968
  • ReraGenie IDRG-MH-68488

Builder

  • NameAmol Ajit Ravetkar
  • Entity typeIndividual
  • GSTIN27AGTPR5446G1ZR
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations15 more →
  • Completed5 of 16
  • Declared earlier projects8 →

Key dates

this monthRegisteredSep 2022First promiseAug 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Aug 2025)
  • Buildings1 building record
  • Documents filed59 files

Current status

0%0 of 28 units booked
2.5%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SwargandhaNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

Swargandha: 7% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,055 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofHERO HOUSING FINANCE LIMITED
Secured amountRs 14.00 crore
CERSAI search filedYes
Declared on24 Feb 2026
LandownerVillageDistrict
SWARGANDHA (Canara Bank Employee) CHSLPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI3855.28
Proposed, not sanctioned1,251 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandarkar Road, Pune 411004
Estimated costRs 6.47 cr
Cost incurredRs 16.16 lakh
Work done2.5%
BuildingWingEstimatedIncurred
SwargandhaNARs 6.47 crRs 16.16 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Design Studio
ArchitectKaumudi Mathane
EngineerNilesh Gujar
Chartered AccountantAmol Kulkarni & Associates
Chartered AccountantPhule Wagh & Associates LLP
Chartered AccountantPrasad Sadvilkar & Associates
PartnerRole in project
Amol Ajit Ravetkar-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20092502645Aug 2025 → Dec 2028

Reason as filed by the promoterDeclaration Stating reasons and causes of delay along with documentary evidences attached with this application.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
SM12500180Ram GawaliAmol Ajit Ravetkar14/11/2025
SM12600256Ram GawaliAmol Ajit Ravetkar07/04/2026
SM12600262Ram GawaliAmol Ajit Ravetkar07/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate Q4 FY 2025-26 Swargandga.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q4 FY 2025-26 Swargandga.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3 Chartered Accountant Certificate Q4 FY 2025-26 Swargandga.pdf8 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A FY 23-24.pdf7 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf7 Mar 2026
Form 2A (FY 2022-2023)File: Form 2A FY 22-23.pdf7 Mar 2026
Form 5 (FY 2022-2023)File: FY 22-23 Form 5.pdf7 Mar 2026
Withdrawal Update Form 1File: From 1 Q3 Swargandha.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM 2 Engineer Certificate Q3 FY 2025-26.pdf14 Jan 2026
Withdrawal Update Form 3File: Q3 FY2526 FORM 3 Chartered Accountant Certificate-Swargandha.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Q2 Swargandha.pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q2 Swargandha.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 Chartered Accountant Certificate Q2 Swargandha.pdf12 Jan 2026
Form 1File: Form 1 Architect Certificate Q1 25-26.pdf19 Sep 2025
Form 2File: Form 2 Engineer Certificate Q1 25-26.pdf19 Sep 2025
Form 3File: Q1 FY2526 FORM 3 Chartered Accountant Certificate-Swargandha.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: Draft Inventory Declaration format sold unsold.pdf19 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate Form 1.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration no progress Q1 FY 24-25.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration no progress Q2 FY 24-25.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration no progress Q1 FY 24-25.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration no progress Q2 FY 24-25.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration no progress Q1 FY 24-25.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration no progress Q2 FY 24-25.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 03.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 Fy 2024-25.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -02.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate Form 2.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Book.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Draft Inventory Declaration format sold unsold.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Swargandha.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate 31032024.pdf11 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-FY 2023-24.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FORM 3 Chartered Accountant Certificate-Swargandha.pdf11 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Swargandha Form 5 FY 2022-23.pdf30 Sep 2023
Proforma of Allotment letterFile: AFS 17092022.pdf17 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Swargandha Deviation AFS 17092022.pdf17 Sep 2022
Details of encumbrances concerned to LegalFile: No Encumbarance Legal.pdf30 Aug 2022
Proforma of Allotment letterFile: Allotment Letter.pdf30 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation Report regarding Draft Allotment Letter.pdf30 Aug 2022
Layout approvalFile: Swargandha Plan 1-2.pdf11 Aug 2022
Layout approvalFile: Swargandha Plan 2-2.pdf11 Aug 2022
Building plan approvalFile: Swargandha Plan 1-2.pdf11 Aug 2022
Building plan approvalFile: Swargandha Plan 2-2.pdf11 Aug 2022
PAN CardFile: PAN Card.pdf11 Aug 2022
Copy of the legal title reportFile: NEW search title report.pdf11 Aug 2022
Details of encumbrances concerned to FinanceFile: No Encumbarance Certificate.pdf11 Aug 2022
Copy of Layout Approval (in case of layout)File: Swargandha Plan 1-2.pdf11 Aug 2022
Copy of Layout Approval (in case of layout)File: Swargandha Plan 2-2.pdf11 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Swargandha Plan 1-2.pdf11 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Swargandha Plan 2-2.pdf11 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Swargandha CC.pdf11 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: POA Swargandha.pdf11 Aug 2022
Declaration about Commencement CertificateFile: Format D.pdf11 Aug 2022
Declaration in FORM BFile: Form B Amol Ravetkar.pdf11 Aug 2022
CERSAI detailsFile: Cersai Report.pdf11 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf11 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank letter Format A.pdf11 Aug 2022

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ManaliParvati Sahakar Nagar Pune 41100911CompletedFeb 2021Oct 2020
SuvarnaLane no 19 Dahanukar Colony Kothrud Pune 41103820CompletedMar 2020Jan 2020
PiyushaOff. law college road Erandwane Pune 41100418CompletedMar 2019Jan 2019
Anusha ResidencyParvati10CompletedJan 2017Dec 2016
Rahul Vihar - ALane 18 Dhanukar Colony Kothrud Pune15CompletedOct 2016Oct 2016
Om BramhaDhanukar Colony15CompletedMar 2015Mar 2015
TulipsLane no 14 Rajwade Path Bhandarkar Road Pune 41100421CompletedApr 2013Apr 2013
PoornimaGultekdi18CompletedDec 2012Dec 2012

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 40 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SWARGANDHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhamburda Shivajinagar13,700+ in Pune

Builder: Amol Ajit Ravetkar

Amol Ajit Ravetkar has 16 registrations on MahaRERA, including Piyusha and Sukhniwas. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SWARGANDHA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWARGANDHA?

The registered promoter entity is Amol Ajit Ravetkar, an individual as per the filing. Its GSTIN 27AGTPR5446G1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWARGANDHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SWARGANDHA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SWARGANDHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWARGANDHA?

The professionals named in the filing: Architect: A Design Studio; Architect: Kaumudi Mathane; Engineer: Nilesh Gujar; Chartered Accountant: Amol Kulkarni & Associates; Chartered Accountant: Phule Wagh & Associates LLP; Chartered Accountant: Prasad Sadvilkar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWARGANDHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWARGANDHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWARGANDHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.