KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED

By M/S FORTUNE DEVELOPERS

RG-MH-18892 · RERA P52100077837 · Last updated on MahaRERA portal: 30 Sep 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 50.00 crore secured on the land, in favour of ADITYA BIRLA CAPITAL

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedmoved 4 months from the original
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
196 of 198Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED is a Residential / Group Housing project by M/S FORTUNE DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100077837 on 7 Nov 2024. Possession is promised by 31 Jul 2028. The completion date has moved by 4 months from the original filing. 2 of the 198 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED
  • TypeResidential / Group Housing
  • Location
    • MODEL COLONY
    • SHIVAJINAGAR BHAMBURDA PUNE
    • SHIVAJINAGAR BHAMBURDA
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411016
  • Pincode411016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077837
  • ReraGenie IDRG-MH-18892

Builder

  • NameM/S FORTUNE DEVELOPERS
  • Entity typePartnership
  • Other registrations7 more →
  • Declared earlier projects19 →

Key dates

this monthRegisteredNov 2024First promiseMar 2028Revised toJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2024
  • Promised completion31 Jul 2028
  • Revised completionRevised to 31 Jul 2028 (originally 31 Mar 2028)
  • Buildings2 building records
  • Documents filed87 files

Current status

1%2 of 198 units booked
33.1%Work done, per cost certificate

Figures as on 30 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA252271071
WING BNA25211270127

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

WING A33%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
WING B35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 30 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed232

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots232
Closed/Covered196
Open Space36
BuildingClosed/CoveredOpen SpaceTotal
WING A85085
WING B11136147

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,995 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA CAPITAL
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on27 Feb 2026
LandownerVillageDistrict
THE KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITEDPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI22666.77
Proposed, not sanctioned22,660 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, OPP ICICI BANKAPTE ROAD DECCAN GYMKHANASHIVAJI NAGAR
Estimated costRs 210.00 cr
Cost incurredRs 69.49 cr
Work done33.09%
BuildingWingEstimatedIncurred
WING ANARs 102.00 crRs 34.30 cr
WING BNARs 102.00 crRs 34.30 cr
-NARs 6.00 crRs 88.63 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSIDDHARTH HARISCHANDRAKAR
EngineerSHRAVAN RATHI
Chartered AccountantRANI PRAVIN BANGAR
Chartered AccountantPravin Bangar
PartnerRole in project
M/S FORTUNE DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100077837/WarMar 2028 → Jul 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600072Ram GawaliM/S FORTUNE DEVELOPERS22/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 KUSUM.pdf30 Sep 2026
Withdrawal Update Form 1File: form 1.pdf30 Jul 2026
Withdrawal Update Form 2File: form 2.pdf30 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf30 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf6 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf6 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf6 Jun 2026
Layout approvalFile: Layout Plan-1.pdf18 Mar 2026
Layout approvalFile: Layout Plan-2.pdf18 Mar 2026
Layout approvalFile: Layout Plan-3.pdf18 Mar 2026
Building plan approvalFile: Plan-1.pdf18 Mar 2026
Building plan approvalFile: Plan-2.pdf18 Mar 2026
Building plan approvalFile: Plan-3.pdf18 Mar 2026
Building plan approvalFile: Plan-4.pdf18 Mar 2026
Building plan approvalFile: Plan-5.pdf18 Mar 2026
Building plan approvalFile: Plan-6.pdf18 Mar 2026
Building plan approvalFile: Plan-7.pdf18 Mar 2026
Building plan approvalFile: Plan-8.pdf18 Mar 2026
Building plan approvalFile: Plan-9.pdf18 Mar 2026
Building plan approvalFile: Plan-10.pdf18 Mar 2026
Building plan approvalFile: Plan-11.pdf18 Mar 2026
Building plan approvalFile: Plan-12.pdf18 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf13 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf13 Mar 2026
Withdrawal Update Form 3File: Form 3 .pdf13 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf13 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf13 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf13 Jan 2026
Form 5 (FY 2024-2025)File: Form 5.pdf5 Dec 2025
Form 1File: Form 1.pdf1 Nov 2025
Form 2File: Form 2.pdf1 Nov 2025
Form 3File: Form 3.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold booked inventory .pdf1 Nov 2025
Form 1File: Form 1.pdf1 Nov 2025
Form 2File: Form 2.pdf1 Nov 2025
Form 3File: Form 3 .pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold booked inventory .pdf1 Nov 2025
Form 1File: Form 1.pdf1 Nov 2025
Form 2File: Form 2 (1).pdf1 Nov 2025
Form 3File: Form 3 .pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold booked inventory .pdf1 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DECLARATION FORTUNE DEVELOPERS (1).pdf30 Oct 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf29 Oct 2024
Details of encumbrances concerned to FinanceFile: FLANACIAL ENCUMBRANCES.pdf27 Oct 2024
Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal_page-0001.pdf27 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)_page-0001.pdf27 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)_page-0001.pdf27 Oct 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf27 Oct 2024
Details of encumbrances concerned to LegalFile: FLANACIAL ENCUMBRANCES.pdf27 Oct 2024
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal_page-0001.pdf27 Oct 2024
Other - TechnicalFile: 1 Other - Technical_page-0001.pdf27 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kusum Apartment CA Certificate.pdf21 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations_page-0001.pdf21 Oct 2024
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE R1.pdf15 Oct 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT R1.pdf15 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B) (14 Oct 2024
Building plan approvalFile: WING B_compressed.pdf13 Oct 2024
Building plan approvalFile: WING A SECTION A_compressed.pdf13 Oct 2024
Building plan approvalFile: WING A SECTION_compressed.pdf13 Oct 2024
Building plan approvalFile: WING A 12_compressed.pdf13 Oct 2024
Building plan approvalFile: WING A 8-11_compressed.pdf13 Oct 2024
Building plan approvalFile: WING A 1-7_compressed.pdf13 Oct 2024
Layout approvalFile: LAYOUT PLAN (2)_compressed.pdf13 Oct 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN (2)_compressed.pdf13 Oct 2024
Proforma of Allotment letterFile: Kusum - Allotment Lettrer.pdf13 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: WING A SECTION_compressed.pdf13 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: WING A 1-7_compressed.pdf13 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: WING A 8-11_compressed.pdf13 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: WING A 12_compressed.pdf13 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: WING A SECTION A_compressed.pdf13 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: WING B_compressed.pdf13 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK_page-0001.pdf13 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Kusum - Deviation Report_compressed (1).pdf13 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure for finance availed.pdf13 Oct 2024

How this compares with Pune

1%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAJINAGAR BHAMBURDA13,700+ in Pune

2 kmKUSUM CO. OPERATIVE HOUSCompleted 60Lapsed / revoked 28Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 144 registered projects within 2 km.

Builder: M/S FORTUNE DEVELOPERS

M/S FORTUNE DEVELOPERS has 8 registrations on MahaRERA, including KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED and Indra Praniti Co-operative Housing Society. Its filings disclose 19 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED?

The registered promoter entity is M/S FORTUNE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED?

The professionals named in the filing: Architect: SIDDHARTH HARISCHANDRAKAR; Engineer: SHRAVAN RATHI; Chartered Accountant: RANI PRAVIN BANGAR; Chartered Accountant: Pravin Bangar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.