Home / Browse projects / Aurangabad, Maharashtra / SWARAJ HEIGHTS

Registered No litigation declared Mixed project

SWARAJ HEIGHTS

By SHREE SAMARTH INFRA

RG-MH-58386 · RERA PM1040002501021 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
7 of 19Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
41 of 50Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 9 documents Report an error

SWARAJ HEIGHTS is a Mixed project by SHREE SAMARTH INFRA in Aurangabad, Maharashtra, registered with MahaRERA as PM1040002501021 on 1 Oct 2025. Possession is promised by 31 Dec 2031. 9 of the 50 units on this registration are recorded sold or booked, and 7 of 19 construction stages are filed complete.

At a glance

Project

  • NameSWARAJ HEIGHTS
  • TypeMixed
  • Location
    • WALUJ MAHANAGAR 1
    • WALUJ MAHANAGAR - 1
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431002
  • Pincode431002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1040002501021
  • ReraGenie IDRG-MH-58386

Builder

  • NameSHREE SAMARTH INFRA
  • Entity typePartnership
  • GSTIN27AFHFS6938P1ZZ
  • PartnersNISHANT DATTATRAY RANE, SARLA SANTOSH KACHRE, BALASAHEB KISANRAO CHOURE
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredOct 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Oct 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings2 building records
  • Documents filed9 files

Current status

18%9 of 50 units booked
65.0%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPENA32606
B TYPENA9835944

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 19 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

A TYPE77%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
B TYPE79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo35%
Water SupplyNo55%
Sewerage (Chamber, Lines, Septic Tank , STP)No45%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNo40%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo45%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Stilt / Ground9
Basement55
BuildingStilt / GroundBasementTotal
A TYPE909
B TYPE05555

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,014 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Aug 2025

Approvals and building plan

Sanctioning authorityCIDCO AURANGABAD
Permissible FSI2923.81
Proposed, not sanctioned2,924 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO. 88 , UDYOG ICON, OPP. HOTEL OASIS WALUJMIDC , WALUJ , AURANGABAD
Estimated costRs 5.30 cr
Cost incurredRs 3.45 cr
Work done65.0%
BuildingWingEstimatedIncurred
B TYPENARs 2.78 crRs 1.81 cr
A TYPENARs 2.27 crRs 1.48 cr
-NARs 25.25 lakhRs 16.41 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR B & ASSOCIATES
EngineerR B & ASSOCIATES
Chartered AccountantS R V S AND ASSOCIATES
Chartered AccountantR D PATHAN AND ASSOCIATES
PartnerRole in project
SHREE SAMARTH INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Aug 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed9

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 MAR 26.pdf4 May 2026
Withdrawal Update Form 2File: Form 2 MAR 26.pdf4 May 2026
Withdrawal Update Form 3File: Form 3 MAR 26.pdf4 May 2026
Withdrawal Update Form 1File: 1 Swaraj Form-1 Dec-25.pdf12 Feb 2026
Withdrawal Update Form 2File: 2 Swaraj Form-2 Dec-25.pdf12 Feb 2026
Withdrawal Update Form 3File: 5 Swaraj Composite Form-3.pdf12 Feb 2026
Declaration and undertaking (Annexure A)File: Annexure A With Area.pdf14 Sep 2025
Building plan approvalFile: DWG - BUILDING PLAN 1.pdf21 Aug 2025
Building plan approvalFile: DWG - BUILDING PLAN 2.pdf21 Aug 2025

How this compares with Aurangabad

18%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SWARAJ HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WALUJ MAHANAGAR - 11,400+ in Aurangabad

2 kmSWARAJ HEIGHTSCompleted 20Lapsed / revoked 9Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: SHREE SAMARTH INFRA

Shree Samarth Infra has 2 registrations on MahaRERA, including Shree Sadguru Krushnagiri Nagari and SWARAJ HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SWARAJ HEIGHTS is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWARAJ HEIGHTS?

The registered promoter entity is SHREE SAMARTH INFRA, a partnership as per the filing. Its GSTIN 27AFHFS6938P1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWARAJ HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWARAJ HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWARAJ HEIGHTS?

The professionals named in the filing: Architect: R B & ASSOCIATES; Engineer: R B & ASSOCIATES; Chartered Accountant: S R V S AND ASSOCIATES; Chartered Accountant: R D PATHAN AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWARAJ HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWARAJ HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWARAJ HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.