ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Swaraaj Paradise Ph3

Registration lapsed No litigation declared Others project

Swaraaj Paradise Ph3

By SWARAAJ REALITIES

RG-MH-64899 · RERA P52100049387 · Last updated on MahaRERA portal: 27 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 65%
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

Swaraaj Paradise Ph3 is a Others project by SWARAAJ REALITIES in Pune, Maharashtra, registered with MahaRERA as P52100049387 on 7 Feb 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameSwaraaj Paradise Ph3
  • TypeOthers
  • Location
    • Kokane Chowk
    • Near Reliance Mall
    • Pimpale Saudagar
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049387
  • ReraGenie IDRG-MH-64899

Builder

  • NameSWARAAJ REALITIES
  • Entity typePartnership
  • PartnersSandip Shivaji Dange, Subhash Namdeo Mali, Sachin Jagadish Agarwal, Anil Jagdish Agarwal
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredFeb 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A CommercialNA70000
A ResidentialNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 65%.

A Commercial45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A Residential45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Open Space60
BuildingOpen SpaceTotal
A Commercial4040
A Residential2020

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Sachin Jagadish AgarwalPimpri Chinchawad (M Corp.)Pune
Anil Jagdish AgarwalPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI7447.68
Proposed, not sanctioned2,447 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchABC TIARA upper ground floor, Near Akurdi Railway Station Shop no 9, 10, 11 H-17 ADC Nigdi Pradhikaran Pune 411044

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandip S Dange
EngineerSubhash Mali
Chartered AccountantVaishali R Gole
PartnerRole in project
SWARAAJ REALITIES-

Litigation declared1

CaseCourtStatus
2380/2010CJSDUnready Board

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 complete jan 25.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 09 Jan 25-compressed.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: UNSOLD-SOLD LIST Jan 2025.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-01 31 Dec 25.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 09 Jan 25.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 04 Jan 25.pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 UPDATED 10 12 2024.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATE 30 12 2023.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATE 30 03 2024.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATE 30 06 2024.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATE 30 09 2024.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DATE 31 03 2024.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AS ON DATE 30 09 2024.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AS ON DATE 30 06 2024.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DATE 31 12 2023.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 2 DATE 31 12 2023.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DATE 31 12 2023.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DATE 31 03 2024.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DATE 30 10 2024.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 UPTO 31 03 2024.pdf12 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT-A.pdf7 Mar 2024
Other - FinanceFile: ANNEXTURE A.pdf7 Mar 2024
Other - FinanceFile: SELF DECLARATION (2).pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory Swaraaj Sep 2023.pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 SWARAJ paradise.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 Swaraaj Paradise_compressed.pdf27 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 Swaraaj Paradise_compressed.pdf27 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest swaraaj.pdf7 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swaraaj Ph 3 Form 3 Gole.pdf4 Jan 2023
Proforma of Agreement for saleFile: Swaraaj Ph 3 AFS.pdf28 Dec 2022
Details of encumbrances concerned to FinanceFile: Swaraaj No Encumbrance Legal29112022.pdf23 Dec 2022
Details of encumbrances concerned to LegalFile: Swaraaj No Encumbrance Legal29112022.pdf23 Dec 2022
Deviation Report with respect to model copy of AgreementFile: AFS DEVIATION merged Swaraaj.pdf22 Dec 2022
Building plan approvalFile: Swaraaj NA.pdf21 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Swaraaj NA.pdf21 Dec 2022
Copy of the legal title reportFile: title and search report Pimple Saudagar.pdf18 Dec 2022
Copy of the legal title reportFile: title and search report supplimentry.pdf18 Dec 2022
CERSAI detailsFile: Cersai Report for Swaraaj Realties.pdf18 Dec 2022
Proforma of Allotment letterFile: Swaraaj Allotment Letter29112022.pdf18 Dec 2022
Layout approvalFile: Parking Floor Pland with plot details_compressed.pdf17 Dec 2022
Layout approvalFile: Swaraaj Ph 3 Floor plan_compressed.pdf17 Dec 2022
PAN CardFile: Swaraaj Realities Pancard.pdf17 Dec 2022
Details of encumbrances concerned to FinanceFile: Swaraaj No Encumbrance finance29112022.pdf17 Dec 2022
Details of encumbrances concerned to LegalFile: Swaraaj No Encumbrance finance29112022.pdf17 Dec 2022
Copy of Layout Approval (in case of layout)File: Parking Floor Pland with plot details_compressed.pdf17 Dec 2022
Copy of Layout Approval (in case of layout)File: Swaraaj Ph 3 Floor plan_compressed.pdf17 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Swaraaj REalities commencement certificate.pdf17 Dec 2022
Declaration about Commencement CertificateFile: Swaraaj Declaration about commencement29112022_0001.pdf17 Dec 2022
Declaration in FORM BFile: Swaraj 3 Sandip Form B 29112022.pdf17 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Swaraaj Format A bank account declaration29112022.pdf17 Dec 2022
Deviation Report with respect to Allotment letterFile: Swaraaj Deviation report for Allotment Letter29112022.pdf17 Dec 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Swaraaj Paradise Ph 1Survey No 167 part B1 part 2D Kokane Chowk Pimple Saudagar40CompletedDec 2022Oct 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swaraaj Paradise Ph3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Reliance Mall13,700+ in Pune

2 kmSwaraaj Paradise Ph3Completed 93Lapsed / revoked 42Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 206 registered projects within 2 km.

Builder: SWARAAJ REALITIES

Swaraaj Realities has 3 registrations on MahaRERA, including SWARAAJ PARADISE PHASE I and Swaraaj Paradise Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Swaraaj Paradise Ph3 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Swaraaj Paradise Ph3 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swaraaj Paradise Ph3?

The registered promoter entity is SWARAAJ REALITIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swaraaj Paradise Ph3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swaraaj Paradise Ph3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swaraaj Paradise Ph3?

The professionals named in the filing: Architect: Sandip S Dange; Engineer: Subhash Mali; Chartered Accountant: Vaishali R Gole. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swaraaj Paradise Ph3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swaraaj Paradise Ph3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swaraaj Paradise Ph3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.