Home / Browse projects / Raigarh, Maharashtra / SWAGAT VILLAGE

Registered No litigation declared Residential / Group Housing project

SWAGAT VILLAGE

By NAYAN INFRASTRUCTURE

RG-MH-24162 · RERA P52000005559 · Last updated on MahaRERA portal: 5 Jul 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 48 months from the original
65 of 99Construction stages doneacross 9 buildings; furthest along: External plumbing and external plaster, 85%
1Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SWAGAT VILLAGE is a Residential / Group Housing project by NAYAN INFRASTRUCTURE in Raigarh, Maharashtra, registered with MahaRERA as P52000005559 on 11 Aug 2017. Possession is promised by 29 Jun 2027. The completion date has moved by 48 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSWAGAT VILLAGE
  • TypeResidential / Group Housing
  • Location
    • Karjat
    • Dhamote
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000005559
  • ReraGenie IDRG-MH-24162

Builder

  • NameNAYAN INFRASTRUCTURE
  • Entity typePartnership
  • PartnersTARUN BHAGWATILAL PATEL, MEGHJI MAVJI PATEL, RAMJI GELA BERA, PRAKASH JAYNTILAL THAKKAR, JETHANAND MEHRUMAL JAGWANI, DINESH CHUNILAL PATEL, MAHAVEER KUMAR RANKA, PAVAN KUMAR DUGAR, PRATIK VISANJI SAVLA

Key dates

this monthRegisteredAug 2017First promiseJun 2023Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion29 Jun 2027
  • Revised completionRevised to 29 Jun 2027 (originally 30 Jun 2023)
  • Buildings9 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA90000
WING BNA90000
WING CNA90000
WING DNA90000
WING ENA90000
WING FNA90000
WING GNA90000
WING HNA90000
WING INA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 5 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

65 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is External plumbing and external plaster, at 85%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING E97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
WING F54%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING G92%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)10%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING H93%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
WING I18%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes85%
Street LightingYes0%
Community BuildingsYes30%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed107

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots107
Closed/Covered89
Open Space18
BuildingClosed/CoveredOpen SpaceTotal
WING A404
WING B404
WING C101
WING D13013
WING E19019
WING F191029
WING G13013
WING H13013
WING I3811

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,184 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16279.79
Proposed, not sanctioned16,280 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURYA KOTI BUILDING SURYA CO-OP HOUSING SOCIETY LTD PLOT NO 16 SECTOR 19 KHARGHAR NAVI MUMBAI 41

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION ARCHITECTURE INTERIOR DESIGNS
EngineerK R PATEL & ASSOCIATES
Chartered AccountantPATEL SENGHANI AND PARVADIYA
PartnerRole in project
NAYAN INFRASTRUCTURE-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000016851Jun 2023 → Jun 2024

Reason as filed by the promoter1. Continuous delay in disbursement of Housing loan of customers from Banks/NBFC, because of this there was a shortage of working capital funds and 2. There was heavy rain during monsoon which results into flood and water logged many times surrounding the project due to which the construction work(External Plasters, Paints etc.) was disturbed several times through out the period of 5 to 6 months.

EXT52000023027Jun 2023 → Jun 2027

Reason as filed by the promoterI, hereby apply for extension as per Order No. 40 Dated 27/12/2022 of the registered project bearing vide no P52000005559. We have received order from RERA for the same.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000429462Arvind Vinayakrao ArvindAnkit Patel26/03/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Dec 2021

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: PDF_3040450585.pdf5 Jul 2024
Declaration in FORM BFile: Form B.pdf18 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2023_11zon (1).pdf18 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2023_11zon.pdf18 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2024_11zon.pdf18 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2023.pdf18 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 20024.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf18 Jun 2024
CERSAI detailsFile: Declaration of CERSAI.pdf18 Jun 2024
Certificates of CA (Form 3)File: Form 3 Dec 2023.pdf18 Jun 2024
Certificates of CA (Form 3)File: Form 3 March 2024.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf18 Jun 2024
Certificates of CA (Form 5)File: Form 5 2017-18.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf18 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Nayan Infrastructure .pdf29 Sep 2023
Declaration in FORM BFile: Form B Latest.pdf27 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf27 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_compressed.pdf27 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold_Unsold Inventery_Q4.pdf27 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 01.pdf21 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf21 Jun 2023
Certificates of CA (Form 3)File: Form 3_compressed.pdf21 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf17 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 01 (for RERA)_Signed.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_NAYAN_21-22.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed.pdf7 Jan 2022
CERSAI detailsFile: CERSAI Certificate.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory_compressed.pdf7 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC of D Wing.pdf3 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Swagat village _compressed.pdf30 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 nayan infra_compressed.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Nayan_Sold Unsold_Q2.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nayan form 5.pdf30 Sep 2021
Declaration about Commencement CertificateFile: Nayan Infra C C Declaration.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 (14-08-2021) COMP.pdf15 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 COMP.pdf15 Aug 2021
Disclosure of sold/ booked inventoryFile: Nayan Infrastructure_Sold-Unsold Inventory_Compressed.pdf15 Aug 2021
Certificates of CA (Form 3)File: Nayan Infra Form 3.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Nayan - 18-19.pdf9 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5_NayanInfra_19-20.pdf9 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf3 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf3 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf3 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nayan Infra_OC.pdf3 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nayan Infra_OC_Wing B,C.pdf3 Dec 2019
Certificates of CA (Form 5)File: Form 5 - Nayan - 18-19.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1_F.pdf16 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1_F.pdf16 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_comp.pdf16 May 2019
Certificates of CA (Form 3)File: Form 3_comp.pdf16 May 2019
Certificates of CA (Form 5)File: Nayan Infrastructure.pdf6 Oct 2018
Certificates of CA (Form 3)File: Nayan_Form 3.pdf28 Jul 2017
Proforma of Allotment letterFile: Nayan_RERA Agreement.pdf28 Jul 2017
Layout approvalFile: Nayan_Layout Plan (2).pdf26 Jul 2017
Building plan approvalFile: Nayan_Layout Plan.pdf26 Jul 2017
PAN CardFile: Nayan_PAN.pdf26 Jul 2017
Copy of the legal title reportFile: Nayan_Title Certificate.pdf26 Jul 2017
Details of encumbrancesFile: Nayan_Non Encumberances Certificate.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Nayan_Layout Plan (2).pdf26 Jul 2017
Building Plan Approval (IOD)File: Nayan_Layout Plan.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Nayan_C C.pdf26 Jul 2017
Declaration in FORM BFile: Nayan_Form B.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nayan_Form 1.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nayan_Form 2.pdf26 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 48 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SWAGAT VILLAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karjat5,900+ in Raigarh

2 kmSWAGAT VILLAGECompleted 63Lapsed / revoked 30Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 136 registered projects within 2 km.

Builder: NAYAN INFRASTRUCTURE

NAYAN INFRASTRUCTURE has 1 registration on MahaRERA, including SWAGAT VILLAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SWAGAT VILLAGE is delayed beyond 29 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWAGAT VILLAGE?

The registered promoter entity is NAYAN INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWAGAT VILLAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SWAGAT VILLAGE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SWAGAT VILLAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWAGAT VILLAGE?

The professionals named in the filing: Architect: DESTINATION ARCHITECTURE INTERIOR DESIGNS; Engineer: K R PATEL & ASSOCIATES; Chartered Accountant: PATEL SENGHANI AND PARVADIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWAGAT VILLAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWAGAT VILLAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWAGAT VILLAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.