Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jan 2021Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

Swagat Co. Op. Housing Soc. LTD. is a Residential / Group Housing project by NEMINATH HOMES PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008889 on 19 Aug 2017. The registration is recorded completed; possession was promised by 30 Jan 2021. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameSwagat Co. Op. Housing Soc. LTD.
  • TypeResidential / Group Housing
  • Location
    • R.S.C 21
    • S.V.P. NAGAR
    • VERSOVA 4 BUNGLOWS
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008889
  • ReraGenie IDRG-MH-24241

Builder

  • NameNEMINATH HOMES PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorTAPAN MAHENDRA JHAVERI
  • Other registrations6 more →
  • Completed7 of 7

Key dates

this monthRegisteredAug 2017First promiseJul 2019Revised toJan 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion30 Jan 2021
  • Revised completionRevised to 30 Jan 2021 (originally 31 Jul 2019)
  • Buildings1 building record
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Wing A: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered50
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,315 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5935.15
Proposed, not sanctioned5,413 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCRAWFORD MKT BRANCH DADA MANZIL 67/69 MOHD ALI ROAD MUMBAI 400003

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJITENDRA GOVIND DEWOOLKAR
PartnerRole in project
NEMINATH HOMES PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800002214Jul 2019 → Jul 2020

Reason as filed by the promoterPreviously the Building Permission authority was under BMC head office at Bandra West. The aforementioned authority was transferred under MHADA for Building Permissions related to all MHADA plots/buildings. This resulted in a voluminous transfer of paperwork creating a ruckus in the department. Thus we could not procure the requisite permissions & approvals in a timely manner. This in turn resulted in delay in carrying out the project related activities.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Nov 2022

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 PLOT 45.pdf28 Feb 2023
Proforma of Agreement for saleFile: sale_agrement_for_nhpl_-45.pdf28 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Plot No 45_Society Letter.pdf27 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_Plot 45_FY 21-22.pdf3 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Plot_No 45.pdf3 Nov 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Plot 45.pdf3 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PLOT NO 45_2020.pdf29 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: PLOT NO 45.pdf29 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-19-20.pdf14 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-20-21.pdf14 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 _Swagat CoOp Housing Society Ltd.pdf25 Feb 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part_OC_PLOT _45_Swagat_CHS_.pdf12 Feb 2021
Certificates of CA (Form 5)File: Plot 45 - Form 5.pdf29 Sep 2018
Proforma of Allotment letterFile: sale_agrement_for_nhpl_-45.pdf29 Oct 2017
Building plan approvalFile: IOD 45.pdf31 Jul 2017
Layout approvalFile: Layout 1MB.pdf31 Jul 2017
Layout approvalFile: Layout Plan 7172_45.PDF31 Jul 2017
PAN CardFile: PAN Card.pdf31 Jul 2017
Copy of the legal title reportFile: Title 45.pdf31 Jul 2017
Details of encumbrancesFile: Encumberances 45.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout 1MB.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan 7172_45.PDF31 Jul 2017
Building Plan Approval (IOD)File: IOD 45.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: cc 45.pdf31 Jul 2017
Declaration in FORM BFile: Declaration Swagat.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 45.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 45.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 45.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter.pdf31 Jul 2017
Proforma of Allotment letterFile: Sale Agreement.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swagat Co. Op. Housing Soc. LTD. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VERSOVA 4 BUNGLOWS6,700+ in Mumbai Suburban

2 kmSwagat Co. Op. Housing SCompleted 67Lapsed / revoked 53Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 212 registered projects within 2 km.

Builder: NEMINATH HOMES PRIVATE LIMITED

NEMINATH HOMES PRIVATE LIMITED has 7 registrations on MahaRERA, including Tapsya Co. Op. Housing Soc. LTD. and Ganesh Krupa Co. Op. Housing Soc. Ltd.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Swagat Co. Op. Housing Soc. LTD. is delayed beyond 30 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swagat Co. Op. Housing Soc. LTD.?

The registered promoter entity is NEMINATH HOMES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swagat Co. Op. Housing Soc. LTD.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swagat Co. Op. Housing Soc. LTD.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swagat Co. Op. Housing Soc. LTD.?

The professionals named in the filing: Architect: JITENDRA GOVIND DEWOOLKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swagat Co. Op. Housing Soc. LTD.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swagat Co. Op. Housing Soc. LTD.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swagat Co. Op. Housing Soc. LTD. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.