Home / Browse projects / Raigarh, Maharashtra / SUZAIN PLAZA
SUZAIN PLAZA
RG-MH-58234 · RERA P52000050324 · Last updated on MahaRERA portal: 10 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUZAIN PLAZA is a Others project by S N DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000050324 on 5 Apr 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 12 of the 21 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSUZAIN PLAZA
- TypeOthers
- Location
- Mamdapur
- NERAL Mamdapur Karjat
- Karjat
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000050324
- ReraGenie IDRG-MH-58234
Builder
- NameS N DEVELOPERS
- Entity typePartnership
- PartnersSHAKIB MUSTAFA PALTE, NASIR MUSTAFA PALTE
- Other registrations3 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Apr 2023
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed57 files
Current status
Figures as on 10 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUZAIN PLAZA | NA | 7 | 7 | 17 | 4 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 76%.
SUZAIN PLAZA: 53% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 76% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed19
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SAIDUR REHMAN INSAN ALI ANSARI | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SUZAIN PLAZA | NA | Rs 1.60 cr | Rs 89.55 lakh |
| - | NA | Rs 26.52 lakh | Rs 2.93 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VASTU RACHANA CONSULTANCY |
| Engineer | ATUL KUDTARKAR AND ASSOCIATES PVT LTD |
| Chartered Accountant | CA DEVYANI SHEJWAL |
| Chartered Accountant | M s Singh Ranjan & Co |
| Partner | Role in project |
|---|---|
| S N DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1) Poor booking response from custormer. 2) Because of poor response our work was very slow.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: APRIL TO JUNE ARCHITECT CERTIFICATE PLOT 52 SUZAIN PLAZA.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: APRIL TO JUNE ENGINEER CERTIFICATE SUZAIN PLAZA PLOT 52.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 31-12-25 SN Developer 1.pdf | 10 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 31-03-2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 31-03-2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 31-03-26 SN Developer.pdf | 17 Apr 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 S N Developers 23-24.pdf | 4 Apr 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 S N Developers 24-25.pdf | 4 Apr 2026 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24_Sign.pdf | 2 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25_Sign.pdf | 2 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 30-06-2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 30-09-2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 31-12-2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 30-06-2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 30-09-2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 31-12-2025.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 30-06-25 SN Developer.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 30-09-25 SN Developer 1.pdf | 31 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 31-12-25 SN Developer 1.pdf | 31 Mar 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED - converted.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 2 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf | 21 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2.pdf | 21 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 19 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 11 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3.pdf | 11 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 11 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 11 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 10 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 10 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 10 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 10 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 10 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 10 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest in other real estate organization_1 (2 files merged).pdf | 3 Apr 2023 |
| Other - TechnicalFile: declaration about comm cert.pdf | 3 Apr 2023 |
| Layout approvalFile: New PLAN_1.pdf | 25 Mar 2023 |
| Building plan approvalFile: New PLAN_1.pdf | 25 Mar 2023 |
| PAN CardFile: pan carrd.pdf | 25 Mar 2023 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 25 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES (1).pdf | 25 Mar 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES (1).pdf | 25 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: New PLAN_1.pdf | 25 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: New PLAN_1.pdf | 25 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 1.pdf | 25 Mar 2023 |
| Declaration about Commencement CertificateFile: DECLERATION ABOUT CC.pdf | 25 Mar 2023 |
| Declaration in FORM BFile: Declaration in FORM B.pdf | 25 Mar 2023 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 25 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 25 Mar 2023 |
| Proforma of Allotment letterFile: ALLOTMENT DRAFT NEW.pdf | 25 Mar 2023 |
| Proforma of Agreement for saleFile: AFS 1.pdf | 25 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A BANK AC.pdf | 25 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf | 25 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION DRAFT SALE.pdf | 25 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUZAIN PLAZA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NERAL Mamdapur Karjat5,900+ in Raigarh
Filed coordinates, straight-line distance. 99 registered projects within 2 km.
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: S N DEVELOPERS
S N DEVELOPERS has 4 registrations on MahaRERA, including LAKE PALACE and Vijayraj Apartment. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SUZAIN PLAZA is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUZAIN PLAZA?
The registered promoter entity is S N DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUZAIN PLAZA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SUZAIN PLAZA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUZAIN PLAZA?
The professionals named in the filing: Architect: VASTU RACHANA CONSULTANCY; Engineer: ATUL KUDTARKAR AND ASSOCIATES PVT LTD; Chartered Accountant: CA DEVYANI SHEJWAL; Chartered Accountant: M s Singh Ranjan & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUZAIN PLAZA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback