Home / Browse projects / Pune, Maharashtra / Suyog Navkaar Phase I
Suyog Navkaar Phase I
By Suyog Development Corporation Unit 12 LLP
RG-MH-21239 · RERA P52100007756 · Last updated on MahaRERA portal: 21 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 16 cases
- 1 complaint at MahaRERA
- Rs 30.00 crore secured on the land, in favour of Capri Global Housing Finance Limited
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Suyog Navkaar Phase I is a Others project by Suyog Development Corporation Unit 12 LLP in Pune, Maharashtra, registered with MahaRERA as P52100007756 on 18 Aug 2017. Possession is promised by 30 Dec 2026. 129 of the 141 units on this registration are recorded sold or booked, and 33 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSuyog Navkaar Phase I
- TypeOthers
- Location
- Shankarsheth Road
- Pune
- Pune (M Corp.)
- Pune City
- 411037
- Pincode411037
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100007756
- ReraGenie IDRG-MH-21239
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Aug 2017
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings4 building records
- Documents filed273 files
Current status
Figures as on 21 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Commercial Wing | NA | 4 | 0 | 0 | 16 | 16 |
| Building A Wing KALP | NA | 31 | 21 | 42 | 0 | 42 |
| Building A Wing SHRUTA | NA | 31 | 21 | 42 | 0 | 42 |
| Building A Wing AGAM | NA | 31 | 21 | 41 | 0 | 41 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 21 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
33 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 90%.
Commercial Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building A Wing KALP82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 9% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building A Wing SHRUTA82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 9% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building A Wing AGAM82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 9% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 21 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | Yes | 60% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed493
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Commercial Wing | 42 | 12 | 54 |
| Building A Wing KALP | 147 | 0 | 147 |
| Building A Wing SHRUTA | 126 | 0 | 126 |
| Building A Wing AGAM | 166 | 0 | 166 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Commercial Wing | NA | Rs 165.57 cr | Rs 148.42 cr |
| Building A Wing KALP | NA | Rs 165.57 cr | Rs 148.42 cr |
| Building A Wing SHRUTA | NA | Rs 165.57 cr | Rs 148.42 cr |
| Building A Wing AGAM | NA | Rs 165.57 cr | Rs 148.42 cr |
| - | NA | Rs 19.50 cr | Rs 15.10 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vishal J Deshpande |
| Architect | Jagdish P Deshpande |
| Engineer | S W Mone and Associates |
| Engineer | KIRAN VILAS SHAH |
| Chartered Accountant | RANJEET NATU |
| Chartered Accountant | AKSHAY MODAK |
| Partner | Role in project |
|---|---|
| Suyog Development Corporation Unit 12 LLP | - |
Litigation declared16
| Case | Court | Status |
|---|---|---|
| 119/2014 | Small Causes Court Pune | Order dated Tenth December two thousand twenty one |
| 120/2014 | Small Causes Court Pune | Order dated Tenth December two thousand twenty one |
| 23/2016 | Small Causes Court Pune | Application of Applicant is rejected on Ninteenth March Two thousand and Nineteen |
| 24/2016 | Small Causes Court Pune | Application of the Applicant is rejected on Nineteenth March Two thousand and Ninteen |
| 108/2017 | District Judge Pune | Appeals are dismissed with costs on twenty November two thousand and twenty one |
| 109/2017 | District Judge Pune | Appeals are dismissed with costs on Twenty November two thousand twenty one |
| 78/2006 | Small Causes Court Pune | Ongoing |
| 110/2006 | Small Causes Court Pune | Ongoing |
| 34/2009 | Civil Judge Senior Division Pune | Ongoing |
| 492/1993 | Small Causes Court Pune | Ongoing |
| 416/2008 | Bombay High Court | Darkhast is stayed by Hon High Court by order dated Tenth August Two Thousand Nine |
| 933/2017 | Chief Judicial Magistrate Pune | Disposed Off dated Twenty Nineth August Two Thousand Twenty Three |
| 6262/2017 | Bombay High Court | Disposed Off dated Eleventh September Two Thousand Twenty Three |
| 10194/2019 | Bombay High Court | Pending at Pre admission stage |
| 2603/2022 | Chief Judicial Magistrate | For awaiting Summons next date Sixth September Two Thousand Twenty Three |
| 0300492/1993 | Small Causes Court | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000106707 | Milan Shah, Tulsi Shah, Sangita Shah | SUYOG DEVELOPMENT CORPORATION UNIT 12 LLP | 28/03/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed273
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 273 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 21 Jan 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BLD A.pdf | 20 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Tower A.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTEORY OF SUYOG NAVKAAR TOWER A OF MARCH 2025.pdf | 20 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 A-Building.pdf | 23 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 - bld A.pdf | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bldg A.pdf | 20 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: A Tower RERA Format B.pdf | 22 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3_TOWER A.pdf | 24 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final SDC Unit 12 Form 5_23-24.pdf | 23 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Suyog Navkaar A Architect Certificate.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Suyog Navkaar A Engineers certificate.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Suyog Navkaar A Sold Unsold Inventory.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 Tower A 30062024.pdf | 23 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form No 1 Suyog Navkaar A 30062024.pdf | 19 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Suyog Navkaar Building A Form 2 30062024.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Suyog Navkaar Phase I Sold unsold 30062024.pdf | 19 Jul 2024 |
| Certificates of CA (Form 3)File: Form no 3 Suyog Navkaar A 31122023.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SDC UNIT 12 BUILD A.pdf | 23 Apr 2024 |
| Certificates of CA (Form 3)File: Unit 12 Form 3 Tower A 31032024.pdf | 23 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BLDG A.pdf | 20 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Suyog Navkaar building A FORM 2 31032024.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory_Suyog Navkaar Building A_31122023.pdf | 25 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3_Suyog Navkaar Building A_31122023.pdf | 25 Jan 2024 |
| CERSAI detailsFile: CERSAI Report_Suyog Navkaar Building A_31122023.pdf | 12 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Suyog Navkaar Building A_31122023.pdf | 9 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Suyog Navkaar Building A_30122023.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Suyog Navkaar Phase I_31032023.pdf | 21 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3_Suyog Navkaar Phase I_30092023.pdf | 31 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Suyog Navkaar Building A_30092023.pdf | 25 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Suyog Navkaar Building A_30092023.pdf | 23 Oct 2023 |
| CERSAI detailsFile: CERSAI Report_Suyog Navkaar Buidling A_30092023.pdf | 6 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory_Suyog Navkaar Building A_30092023.pdf | 30 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Suyog Navkaar building A_30062023.pdf | 29 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3_Suyog Navkaar Building A_30062023.pdf | 29 Jul 2023 |
| CERSAI detailsFile: CERSAI Report_Suyog Navkaar Building A_30062023.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory_Suyog Navkaar Building A_30062023.pdf | 17 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Suyog Navkaar Building A_26062023.pdf | 30 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3_Suyog Navkaar Building A_31032019.pdf | 21 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3_CA Certificate_31032020.pdf | 21 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3_CA Certificate_31032021.pdf | 21 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate_30062020.pdf | 29 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate_31032021.pdf | 29 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate_31122021.pdf | 29 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect Certificate_30092022.pdf | 29 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Suyog Navkaar Building A_30092022.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Suyog Navkaar Building A_31122022.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Suyog Navkaar Building A_31032023.pdf | 12 May 2023 |
| Certificates of CA (Form 3)File: Form 3_Suyog Navkaar Building A_31032023.pdf | 6 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Suyog Navkaar Building A_31032023.pdf | 26 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Suyog Navkaar_31032022.pdf | 26 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_Quality Assurance Certificate_31032023.pdf | 15 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_Quality Assurance Certificate_31032020.pdf | 12 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory_Suyog Navkaar Phase I_31032023.pdf | 8 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_30092017.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_30122017.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_30062018.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_30092018.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_31122018.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_31032019.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_30062019.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_28022020.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_29022020.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_30092020.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_30092021.pdf | 31 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Certificate_31122021.pdf | 31 Mar 2023 |
| Layout approvalFile: Scan_2007-LAYOUT 1.pdf | 10 Mar 2023 |
| Building plan approvalFile: Scan_2007-01_22.pdf | 10 Mar 2023 |
| Building plan approvalFile: Scan_2007-02_22.pdf | 10 Mar 2023 |
| Building plan approvalFile: Scan_2007-03_22.pdf | 10 Mar 2023 |
| Building plan approvalFile: Scan_2007-04_22.pdf | 10 Mar 2023 |
| Building plan approvalFile: Scan_2007-04_22.pdf | 10 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 273 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Suyog Navkaar Phase I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune13,700+ in Pune
Filed coordinates, straight-line distance. 164 registered projects within 2 km.
MAHA TRADE MARKET PH- 2
JAIRAJ REALTY LLP
MAHA TRADE MARKET PH- 1
JAIRAJ REALTY LLP
SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORL
Classic Promoters and Builders Private Lim
SOLITAIRE BUSINESS HUB PHASE II, SOLITAIRE WOR
Classic Promoters and Builders Private Lim
World One Solitaire World
Classic Promoters and Builders Private Lim
HILL TOWN A B AND C WING
HILL TOWN CONSTRUCTIONS
Builder: Suyog Development Corporation Unit 12 LLP
Suyog Development Corporation Unit 12 LLP has 2 registrations on MahaRERA, including Suyog Navkaar Phase I and Suyog Navkaar Building B. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Suyog Navkaar Phase I is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Suyog Navkaar Phase I?
The registered promoter entity is Suyog Development Corporation Unit 12 LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Suyog Navkaar Phase I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Suyog Navkaar Phase I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Suyog Navkaar Phase I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Suyog Navkaar Phase I?
The professionals named in the filing: Architect: Vishal J Deshpande; Architect: Jagdish P Deshpande; Engineer: S W Mone and Associates; Engineer: KIRAN VILAS SHAH; Chartered Accountant: RANJEET NATU; Chartered Accountant: AKSHAY MODAK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Suyog Navkaar Phase I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback