Home / Browse projects / Pune, Maharashtra / SUYOG LEHER COMMERCIAL J BUILDING
SUYOG LEHER COMMERCIAL J BUILDING
By SUYOG DEVELOPMENT CORPORATION UNIT NO.18
RG-MH-13215 · RERA P52100022703 · Last updated on MahaRERA portal: 8 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 3 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUYOG LEHER COMMERCIAL J BUILDING is a Commercial project by SUYOG DEVELOPMENT CORPORATION UNIT NO.18 in Pune, Maharashtra, registered with MahaRERA as P52100022703 on 12 Oct 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 16 of the 25 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSUYOG LEHER COMMERCIAL J BUILDING
- TypeCommercial
- Location
- KONDHAWA BK
- KONDHWA
- kondhwa BK
- Haveli
- Pune
- 411048
- Pincode411048
- RERA no.P52100022703
- ReraGenie IDRG-MH-13215
Builder
- NameSUYOG DEVELOPMENT CORPORATION UNIT NO.18
- Entity typePartnership
- PartnersKALPESH BHARAT SHAH, SUYOG DEVELOPMENT CORPORATION LTD SUYOG DEVELOPMENT CORPORATION LTD SUYOG DEVELOPMENT CORPORATION LTD, BHARAT KESHAVLAL SHAH
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Oct 2019
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed118 files
Current status
Figures as on 8 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| J | NA | 6 | 4 | 0 | 25 | 25 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.
J: 70% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SUYOG DEVELOPMENT CORPORATION UNIT NO 18 | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| J | NA | Rs 2.94 cr | Rs 2.92 cr |
| - | NA | Rs 33.53 lakh | Rs 33.19 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS TARWADI |
| Engineer | KIRAN VILAS SHAH |
| Engineer | Amit Sonwane |
| Chartered Accountant | A S Modak and Associates |
| Chartered Accountant | Ankur Mehta |
| Partner | Role in project |
|---|---|
| SUYOG DEVELOPMENT CORPORATION UNIT NO.18 | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have applied for the revision in Sanction Plans. The Pune Municipal Corporation will accord the sanction within 3 months. Due to revision in sanction plans we are applying for revised possession date and extension of date upto 31.12.2026
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Oct 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Oct 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 8 May 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 8 May 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 7 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_Leher.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 7 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 3 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Leher.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_Leher.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Leher.pdf | 12 Jan 2026 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTEORY OF SUYOG LEHER TOWER OF MARCH 2025.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTEORY OF SUYOG LEHER TOWER OF MARCH 2025.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Suyog Leher.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SUYOG LEHER - FORM 1.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 leher.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: leher sold unsold inventory.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form V suyog leher.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20240803152853.pdf | 3 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1 SUYOG LEHER J 30062024.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOrm No 2 Suyog Leher J 30062024.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Suyog Leher 30062024.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SUYOG LEHER FORM NO 2 31032024.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SUYOG LEHER FORM NO 2 31032024.pdf | 23 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Unit 18 Architect Certificate Quarter 4th FY 23 24.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SUYOG LEHER J 31032024.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Unit 18 Form 3 FY 2023 2024 Q 4.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_31122023.pdf | 29 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory_Suyog Leher_30122023.pdf | 25 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_31122023.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Leher_31122023.pdf | 23 Jan 2024 |
| CERSAI detailsFile: Undertaking CERSAI Report_Suyog Leher_31122023.pdf | 23 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Suyog Leher_31032021.pdf | 28 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_Suyog Leher_31032022.pdf | 28 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Suyog Leher_31032023.pdf | 26 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Annual Report_31032023 new.pdf | 23 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Annual Reports on Statements of Accounts_31032023.pdf | 9 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_30092023.pdf | 31 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_30092023.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Leher_30092023.pdf | 5 Oct 2023 |
| CERSAI detailsFile: Undertaking CERSAI Report_Suyog Leher_30092023.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory_Suyog Leher_30092023.pdf | 30 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Leher_31032023.pdf | 30 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Leher_30062023.pdf | 30 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_30062023.pdf | 24 Jul 2023 |
| CERSAI detailsFile: Undertaking CERSAI Report_Suyog Leher_31032023.pdf | 18 Jul 2023 |
| CERSAI detailsFile: Undertaking CERSAI Report_Suyog Leher_30062023.pdf | 18 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory_Suyog Leher_30062023.pdf | 17 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_30062023.pdf | 11 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A_Suyog Leher_31032020.pdf | 12 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A_Suyog Leher_31032023.pdf | 12 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_31032023.pdf | 6 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_31032023.pdf | 15 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_31122022.pdf | 15 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_Annual Reports on Statement of Accounts_31032021.pdf | 13 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Annual Reports on Statements of Accounts_31032022.pdf | 13 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory_Suyog Leher_31032023.pdf | 8 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_31032020.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_30062020.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_31032021.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_30062021.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_31122021.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_30092022.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_31032022.pdf | 2 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Leher_31122019.pdf | 2 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Leher_30062021.pdf | 2 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Leher_31122019.pdf | 2 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Leher_31032022.pdf | 2 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory_30062021.pdf | 2 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory_31032022.pdf | 2 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_31082020.pdf | 18 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_31032021.pdf | 18 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_31122021.pdf | 18 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_31032022.pdf | 18 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_30062022.pdf | 18 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Leher_30092022.pdf | 18 Feb 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Suyog Leher Phase I Building B | S No 16 Hissa no 2 Kondhwa Budruk Pune | 43 | Completed | May 2016 | May 2016 |
| Suyog Leher F | S No 16 Hissa No 2 Kondhwa Budruk Pune | 43 | Completed | Feb 2013 | Feb 2013 |
| Suyog Leher Phase I Building A, C, D, E, G | S No.16 Hissa no 2 Kondhwa Budruk Pune | 241 | Completed | Jul 2012 | Jul 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 118 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUYOG LEHER COMMERCIAL J BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KONDHWA13,700+ in Pune
Dwarikadham
Yashodhan Affordable Landmark LLP
UNITAS FASHION CENTER
UNITATIS DEVELOPMENTS PVT. LTD
Millennium Park
Xrbia Epoch Creations LLP
BABAR CLASSIC VISTA WING E, F, G
Classic Properties
JITO NAGAR
JAIN ASHAPURI DEVELOPER UNIT II
Wellwisher West Views
Bhansali Infrastructure LLP
Builder: SUYOG DEVELOPMENT CORPORATION UNIT NO.18
SUYOG DEVELOPMENT CORPORATION UNIT NO.18 has 1 registration on MahaRERA, including SUYOG LEHER COMMERCIAL J BUILDING. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SUYOG LEHER COMMERCIAL J BUILDING is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUYOG LEHER COMMERCIAL J BUILDING?
The registered promoter entity is SUYOG DEVELOPMENT CORPORATION UNIT NO.18, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUYOG LEHER COMMERCIAL J BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SUYOG LEHER COMMERCIAL J BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUYOG LEHER COMMERCIAL J BUILDING?
The professionals named in the filing: Architect: VILAS TARWADI; Engineer: KIRAN VILAS SHAH; Engineer: Amit Sonwane; Chartered Accountant: A S Modak and Associates; Chartered Accountant: Ankur Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUYOG LEHER COMMERCIAL J BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback