Registered No litigation declared Residential / Group Housing project

SUVARNANEEL HOUSING STREET

By GRAFFIC INFRASTRUCTURE PVT. LTD.

RG-MH-08476 · RERA P51500019798 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken
  • Rs 60.00 crore secured on the land, in favour of sunderlal sahuji urban co. op bank ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 24 months from the original
42 of 66Construction stages doneacross 6 buildings; furthest along: Slabs of Super Structure, 90%
35 of 100Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 170 documents Report an error

SUVARNANEEL HOUSING STREET is a Residential / Group Housing project by GRAFFIC INFRASTRUCTURE PVT. LTD. in Aurangabad, Maharashtra, registered with MahaRERA as P51500019798 on 5 Mar 2019. Possession is promised by 30 Mar 2027. The completion date has moved by 24 months from the original filing. 65 of the 100 units on this registration are recorded sold or booked, and 42 of 66 construction stages are filed complete.

At a glance

Project

  • NameSUVARNANEEL HOUSING STREET
  • TypeResidential / Group Housing
  • Location
    • -
    • GUT NO 86 AND 87
    • Devlai
    • Aurangabad
    • 431001
  • Pincode431001
  • RERA no.P51500019798
  • ReraGenie IDRG-MH-08476

Builder

  • NameGRAFFIC INFRASTRUCTURE PVT. LTD.
  • Entity typeCompany
  • Managing DirectorMR SUNIL MULCHAND RAKA
  • DirectorMRS SUVARNA SUNIL RAKA
  • DirectorSUVARNA SUNIL RAKA
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2019First promiseMar 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Mar 2019
  • Promised completion30 Mar 2027
  • Revised completionRevised to 30 Mar 2027 (originally 30 Mar 2025)
  • Buildings6 building records
  • Documents filed170 files

Current status

65%65 of 100 units booked
142.7%Work done, per cost certificate

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA8828028
B BUILDINGNA8828028
C BUILDINGNA8821021
D BUILDINGNA55808
ROW HOUSES R1 TO R8NA33808
ROW HOUSES R9 TO R15NA33707

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

42 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

A BUILDING75%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
B BUILDING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C BUILDING78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D BUILDING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSES R1 TO R882%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSES R9 TO R1573%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor-
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed261

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots261
Open Space261
BuildingOpen SpaceTotal
A BUILDING8181
B BUILDING8181
C BUILDING6363
D BUILDING2121
ROW HOUSES R1 TO R888
ROW HOUSES R9 TO R1577

Land and ownership6

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared present
Charge in favour ofsunderlal sahuji urban co. op bank ltd
Secured amountRs 60.00 crore
CERSAI search filedYes
Declared on26 Oct 2025
LandownerVillageDistrict
SUNIL RAMRAO SANGLEJalna (M Cl)Jalna
SUNIL RAMRAO SANGLEJalna (M Cl)Jalna
KIRAN PRABHAKARRAO DESHMUKHAurangabad (M Corp.)Aurangabad
KIRAN PRABHAKARRAO DESHMUKHAurangabad (M Corp.)Aurangabad
PRADEEP RAOSAHEB PATILAurangabad (M Corp.)Aurangabad
PRADEEP RAOSAHEB PATILAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityCHHATRAPATI SAMBHAJINGAR MUNICIPAL CORPORATION
Permissible FSI7828.33
Proposed, not sanctioned4,738 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW OSMANPURA AURANGABAD
Estimated costRs 26.31 cr
Cost incurredRs 37.54 cr
Work done142.69%
BuildingWingEstimatedIncurred
-NARs 13.16 crRs 13.04 cr
B BUILDINGNARs 3.55 crRs 3.50 cr
A BUILDINGNARs 3.55 crRs 3.50 cr
C BUILDINGNARs 1.99 crRs 1.97 cr
ROW HOUSES R1 TO R8NARs 1.65 crRs 1.65 cr
ROW HOUSES R9 TO R15NARs 1.58 crRs 13.04 cr
D BUILDINGNARs 82.60 lakhRs 82.60 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectROHIT SUNIL RAKA
EngineerSUNIL MULCHAND RAKA
EngineerVINEET SUNIL RAKA
Chartered AccountantYOGESH JAIPRAKASH BHARTIYA
Chartered AccountantV P KALE & ASSOCIATES
Chartered AccountantS. B. DESHMUKH & ASSOCIATES
PartnerRole in project
GRAFFIC INFRASTRUCTURE PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500028047Mar 2025 → Mar 2027

Reason as filed by the promoterHowever, on account of slack of market therefore there are no booking and due to ongoing pandemic COVID-19 (Corona Virus) the supply chains for obtaining construction material have been disrupted and Labour work force may have migrated back to their home states. Due to these circumstances, we have faced financial & booking issues. This COVID-19 (Corona Virus) has lead to shortage of materials, unavailability of labours causing major delay in project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2027

Documents filed170

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 170 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 -street-jan to march 2026-FINAL_compressed.pdf5 May 2026
Withdrawal Update Form 2File: FORM NO 3 Street - JAN TO MARCH 26 - Copy_compressed.pdf5 May 2026
Withdrawal Update Form 3File: FORM NO 3 Street - JAN TO MARCH 26 - Copy_compressed.pdf5 May 2026
Form 2A (FY 2026-2027)File: Form 2A FOR 2025-26-FINAL.pdf5 May 2026
Form 5 (FY 2025-2026)File: From No 5 Street-2025-26.pdf5 May 2026
Withdrawal Update Form 1File: FORM-1-STREET-23-1-26.pdf23 Jan 2026
Withdrawal Update Form 2File: FORM-2-STREET-23-1-26.pdf23 Jan 2026
Withdrawal Update Form 3File: Rera From No3 street.pdf23 Jan 2026
Withdrawal Update Form 1File: NEW FORM 1 JUL TO SEP 25.pdf30 Oct 2025
Withdrawal Update Form 2File: NEW FORM 2 JUL TO SEP 25.pdf30 Oct 2025
Withdrawal Update Form 3File: FORM 3 JUL TO SEP 25.pdf30 Oct 2025
Form 1File: FORM 1.pdf26 Oct 2025
Form 2File: FORM 2.pdf26 Oct 2025
Form 3File: FORM 3.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY APR TO JUNE 20.pdf26 Oct 2025
Form 1File: FORM 1.pdf26 Oct 2025
Form 2File: FORM 2.pdf26 Oct 2025
Form 3File: FORM 3.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY july to sep 2020.pdf26 Oct 2025
Form 1File: 1 FORM OCT TO DEC 20.pdf26 Oct 2025
Form 2File: 2 FORM OCT TO DEC 20.pdf26 Oct 2025
Form 3File: 3 FORM OCT TO DEC 20.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY OCT TO DEC 20.pdf26 Oct 2025
Form 1File: FORM 1 JAN TO MARCH 21.pdf26 Oct 2025
Form 2File: FORM 2 JAN TO MARCH 21.pdf26 Oct 2025
Form 3File: FORM 3 JAN TO MARCH 21.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD JAN 21 TO MARCH 21.pdf26 Oct 2025
Form 1File: FORM 1 APR TO JUNE 21.pdf26 Oct 2025
Form 2File: FORM 2 APR TO JUNE 21.pdf26 Oct 2025
Form 3File: FORM 3 APR TO JUNE 21.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY APR TO JUNE 21.pdf26 Oct 2025
Form 1File: FORM 1 JULY TO SEP 21.pdf26 Oct 2025
Form 2File: FORM 2 JULY TO SEP 21.pdf26 Oct 2025
Form 3File: FORM 3 JULY TO 21.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD JYLY TO SEP 21.pdf26 Oct 2025
Form 1File: FORM 1 OCT TO DEC 21.pdf26 Oct 2025
Form 2File: FORM 2 OCT TO DEC 21.pdf26 Oct 2025
Form 3File: FORM 3 OCT TO DEC 21.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD OCT TO DEC 21.pdf26 Oct 2025
Form 1File: FORM 1 JAN-22 TO MARCH-22.pdf26 Oct 2025
Form 2File: FORM 2 JAN-22 TO MARCH-22.pdf26 Oct 2025
Form 3File: FORM 3 JAN-22 TO MARCH-22.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD JAN TO MARCH 22.pdf26 Oct 2025
Form 1File: FORM 1 APR TO JUNE 22.pdf26 Oct 2025
Form 2File: FORM 2 APR TO JUNE 22.pdf26 Oct 2025
Form 3File: FORM 3 APR TO JUNE 22.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD APR TO JUNE 22.pdf26 Oct 2025
Form 1File: FORM 1 JYLY TO SEP 22.pdf26 Oct 2025
Form 2File: FORM 2 JYLY TO SEP 22.pdf26 Oct 2025
Form 3File: FORM 3 JYLY TO SEP 22.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD JYLY TO SEP 22.pdf26 Oct 2025
Form 1File: FORM 1 OCT TO DEC 22.pdf26 Oct 2025
Form 2File: FORM 2 OCT TO DEC 22.pdf26 Oct 2025
Form 3File: FORM 3 OCT TO DEC 22.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD OCT TO DEC 22.pdf26 Oct 2025
Form 1File: FORM 1 JAN TO MARCH 23.pdf26 Oct 2025
Form 2File: FORM 2 JAN TO MARCH 23.pdf26 Oct 2025
Form 3File: FORM 3 JAN TO MARCH 23.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD JAN TO MARCH 23.pdf26 Oct 2025
Form 1File: FORM 1 APR TO JUNE 23.pdf26 Oct 2025
Form 2File: FORM 2 APR TO JUNE 23.pdf26 Oct 2025
Form 3File: FORM 3 APR TO JUNE 23.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD APR TO JUNE 23.pdf26 Oct 2025
Form 1File: FORM 1 JULY TO SEP 23.pdf26 Oct 2025
Form 2File: FORM 2 JULY TO SEP 23.pdf26 Oct 2025
Form 3File: FORM3 JULY TO SEP 23.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD JULY TO SEP 23.pdf26 Oct 2025
Form 1File: FORM 1 OCT TO DEC 23.pdf26 Oct 2025
Form 2File: FORM 2 OCT TO DEC 23.pdf26 Oct 2025
Form 3File: FORM 3 OCT TO DEC 23.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD OCT TO DEC 23.pdf26 Oct 2025
Form 1File: FORM 1 JAN TO MARCH 24.pdf26 Oct 2025
Form 2File: FORM 2 JAN TO MARCH 24.pdf26 Oct 2025
Form 3File: FORM 3 JAN TO MARCH 24.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD JAN TO MARCH 24.pdf26 Oct 2025
Form 1File: FORM 1 APR-24 TO JUN-24.pdf26 Oct 2025
Form 2File: FORM 2 APR-24 TO JUN-24.pdf26 Oct 2025
Form 3File: FORM 3 APR TO JUN 24.pdf26 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCOLSURE OF SOLD APR TO JUNE 24.pdf26 Oct 2025
Form 1File: FORM 1 JUL TO SEP 24.pdf26 Oct 2025

How this compares with Aurangabad

65%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 24 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SUVARNANEEL HOUSING STREET on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GUT NO 86 AND 871,400+ in Aurangabad

Builder: GRAFFIC INFRASTRUCTURE PVT. LTD.

GRAFFIC INFRASTRUCTURE PVT. LTD. has 2 registrations on MahaRERA, including SUVARNANEEL HOUSING STREET and SUVARNANEEL HOUSING PARK. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SUVARNANEEL HOUSING STREET is delayed beyond 30 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUVARNANEEL HOUSING STREET?

The registered promoter entity is GRAFFIC INFRASTRUCTURE PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUVARNANEEL HOUSING STREET?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUVARNANEEL HOUSING STREET?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUVARNANEEL HOUSING STREET?

The professionals named in the filing: Architect: ROHIT SUNIL RAKA; Engineer: SUNIL MULCHAND RAKA; Engineer: VINEET SUNIL RAKA; Chartered Accountant: YOGESH JAIPRAKASH BHARTIYA; Chartered Accountant: V P KALE & ASSOCIATES; Chartered Accountant: S. B. DESHMUKH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUVARNANEEL HOUSING STREET?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUVARNANEEL HOUSING STREET. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUVARNANEEL HOUSING STREET to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.