Home / Browse projects / Nagpur, Maharashtra / SUVARNA VILLA
SUVARNA VILLA
By Globe Builders & Developers
RG-MH-13430 · RERA P50500046199 · Last updated on MahaRERA portal: 9 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUVARNA VILLA is a Residential / Group Housing project by Globe Builders & Developers in Nagpur, Maharashtra, registered with MahaRERA as P50500046199 on 20 Jun 2022. Possession is promised by 1 Jun 2027.
At a glance
Project
- NameSUVARNA VILLA
- TypeResidential / Group Housing
- Location
- Plot No. 18
- 19
- 20
- Mouza - Somalwada
- Kh. No. 65/1
- Shree Sai Krupa Swagruha Sukha Nirman Society Somalwada
- Nagpur
- Somalwada
- Nagpur
- Nagpur (M Corp.)
- ...
- Pincode440024
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500046199
- ReraGenie IDRG-MH-13430
Builder
- NameGlobe Builders & Developers
- Entity typePartnership
- PartnerSatish Sitaramji Ramteke
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Jun 2022
- Promised completion1 Jun 2027
- Revised completionNone
- Buildings1 building record
- Documents filed114 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUVARNA VILLA | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
SUVARNA VILLA: 87% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Satish Ramteke |
| Engineer | Satish Ramteke |
| Chartered Accountant | Rishi Lashkare Lashkare |
| Partner | Role in project |
|---|---|
| Globe Builders & Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Jun 2027
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1.pdf | 9 Jul 2026 |
| Form 2File: From 2 Engg.pdf | 9 Jul 2026 |
| Form 3File: Form 3.pdf | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: march-24.pdf | 9 Jul 2026 |
| Form 1File: Form 1 30-09-24.pdf | 9 Jul 2026 |
| Form 2File: Form 2 Engg Cer.pdf | 9 Jul 2026 |
| Form 3File: Form 3 new.pdf | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: march-24.pdf | 9 Jul 2026 |
| Form 1File: Form 1 31-12-2024.pdf | 9 Jul 2026 |
| Form 2File: Form 2 31-12-2024.pdf | 9 Jul 2026 |
| Form 3File: Form 3new.pdf | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: march-24.pdf | 9 Jul 2026 |
| Form 1File: Form 1 31-03-2025.pdf | 9 Jul 2026 |
| Form 2File: Form 2 Engg.pdf | 9 Jul 2026 |
| Form 3File: Form 3new.pdf | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: march-24.pdf | 9 Jul 2026 |
| Form 1File: form 1.pdf | 9 Jul 2026 |
| Form 2File: Form 2 Engg.pdf | 9 Jul 2026 |
| Form 3File: form 3new.pdf | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: march-24.pdf | 9 Jul 2026 |
| Form 1File: Form 1.pdf | 9 Jul 2026 |
| Form 2File: Form2.pdf | 9 Jul 2026 |
| Form 3File: Form 3new.pdf | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: march-24.pdf | 9 Jul 2026 |
| Form 1File: form 1.pdf | 9 Jul 2026 |
| Form 2File: Form 2 Engg.pdf | 9 Jul 2026 |
| Form 3File: Form 3new.pdf | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: march-24.pdf | 9 Jul 2026 |
| Form 1File: Form 1.pdf | 9 Jul 2026 |
| Form 2File: Form 2 31-03-2026.pdf | 9 Jul 2026 |
| Form 3File: form 3new.pdf | 9 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: march-24.pdf | 9 Jul 2026 |
| Form 1File: Form-1-28-04-2023 march-23.pdf | 18 Jun 2026 |
| Form 2File: Form-2-22-04-2023 March-23.pdf | 18 Jun 2026 |
| Form 3File: 2_Form-3 March 23.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: march-23.pdf | 18 Jun 2026 |
| Form 1File: Form-1-20-07-2023 June-23.pdf | 18 Jun 2026 |
| Form 2File: Form-2-20-07-2023 June-23.pdf | 18 Jun 2026 |
| Form 3File: 3_Form-3 June 23.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: June23.pdf | 18 Jun 2026 |
| Form 1File: Form-1-05-10-2023 Sept-23.pdf | 18 Jun 2026 |
| Form 2File: Form-2-15-10-2023 Sept-23.pdf | 18 Jun 2026 |
| Form 3File: 4_Form 3 Sep 23.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: sept-23.pdf | 18 Jun 2026 |
| Form 1File: Form-1- 25-01-2024 Dec-23.pdf | 18 Jun 2026 |
| Form 2File: Form-2-25-01-2024 Dec-23.pdf | 18 Jun 2026 |
| Form 3File: 5_Form-3-Dec 23.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: dec-23.pdf | 18 Jun 2026 |
| Form 1File: Form-1-24-04-2024 march-24.pdf | 18 Jun 2026 |
| Form 2File: Form-2-24-04-2024 March 24.pdf | 18 Jun 2026 |
| Form 3File: 6_Form-3-March 24.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: march-24.pdf | 18 Jun 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Suvrana Villa - Form 1 - September 2024.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Suvarna Villa - Form 3 - September 2024_compressed.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Suvarna Villa - Form 2 - September 2024.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Suvarna Villa - Disclosure - September 2024.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 2024.pdf | 4 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 2024_compressed.pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2024.pdf | 4 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure - June 2024.pdf | 4 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Suvarna Villa - 2022-23.pdf | 17 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Suvarna Villa - 2023-24.pdf | 17 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - March 2024 (2).pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - March 2024 (2).pdf | 29 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold - March 2024 (2).pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - March 2024 (2)_compressed (4).pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert - Dec 2023.pdf | 30 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert - Dec 2023.pdf | 30 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure - Dec 2023.pdf | 30 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Dec 2023_compressed.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Arch Certificate - June 2023 Qtr.pdf | 23 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch Certificate - Suvarna Villa - Sept 2023.pdf | 23 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate - June 2023 Qtr.pdf | 23 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - Suvarna Villa - Sept 2023.pdf | 23 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory - June 2023 Qtr.pdf | 23 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Sept 2023.pdf | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA Certificate - June 2023 Qt.pdf | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Suvarna Villa - Sept 2023 Qtr.pdf | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Suvarna Villa CA Certificate.pdf | 22 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Seperate Bank Account details - Globe.pdf | 25 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUVARNA VILLA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Somalwada, Nagpur2,800+ in Nagpur
Filed coordinates, straight-line distance. 88 registered projects within 2 km.
KUKREJA PARIS CITY WING-A, B, E AND F
KUKREJA INFRASTRUCTURES
VISHWABHARTI RESIDENCY
BHAVESH DEORAO KUCHANWAR
TECHOPSGRAND
Techops Infrastructure Pvt. Ltd.
GOVARDHAN NAGRI - 12
HARODE REAL ESTATE
Vinayak Tower
Goverdhan Infraventures (Mumbai) LLP
BALAJI HEIGHTS - 1
BALAJI NIRMAY INFRAVENTURE
See every Nagpur project, with the district possession charts
Builder: Globe Builders & Developers
Globe Builders & Developers has 1 registration on MahaRERA, including SUVARNA VILLA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SUVARNA VILLA is delayed beyond 1 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUVARNA VILLA?
The registered promoter entity is Globe Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUVARNA VILLA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SUVARNA VILLA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUVARNA VILLA?
The professionals named in the filing: Architect: Satish Ramteke; Engineer: Satish Ramteke; Chartered Accountant: Rishi Lashkare Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUVARNA VILLA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback