ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / SURYATEJ

Registered No litigation declared Residential / Group Housing project

SURYATEJ

By SHRIRAJ LABH DEVELOPER

RG-MH-07939 · RERA P51500018801 · Last updated on MahaRERA portal: 18 Feb 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
50 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

SURYATEJ is a Residential / Group Housing project by SHRIRAJ LABH DEVELOPER in Aurangabad, Maharashtra, registered with MahaRERA as P51500018801 on 5 Dec 2018. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameSURYATEJ
  • TypeResidential / Group Housing
  • Location
    • OLD MUMBAI HIGHWAY
    • MITMITA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • RERA no.P51500018801
  • ReraGenie IDRG-MH-07939

Builder

  • NameSHRIRAJ LABH DEVELOPER
  • Entity typePartnership
  • PartnersJAYSHREE TUKARAM MAMIDWAR, MADHURI MAHESH LABHSHETWAR
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2018PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Dec 2018
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings5 building records
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA60000
BUILDING BNA60000
BUILDING CNA60000
BUILDING DNA60000
BUILDING ENA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 18 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered78
BuildingClosed/CoveredTotal
BUILDING A1414
BUILDING B1616
BUILDING C1616
BUILDING D1616
BUILDING E1616

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,646 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
OM SAI CONSTRUCTIONSAurangabad (M Corp.)Aurangabad
VIJAY RADHAKISHAN VYWAHAREVaijapur (M Cl)Aurangabad
SANJAY GULABRAO BHADANENashikNashik
PRAKASH NARAYAN BADVEAkolaAhmednagar

Approvals and building plan

Permissible FSI6020.0
Proposed, not sanctioned4,562 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSTATION ROAD AURANGABAD

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGANESH MHAROLKAR
EngineerCORE CONSULTANTS
Chartered AccountantCA SACHIN JAISWAL
PartnerRole in project
SHRIRAJ LABH DEVELOPER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Feb 2024

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: MORTGAGE PROPERY.pdf18 Feb 2024
Details of encumbrances concerned to LegalFile: MORTGAGE PROPERY.pdf18 Feb 2024
CERSAI detailsFile: DEVIATION IN AL.pdf18 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf18 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank account dec.pdf18 Feb 2024
Deviation Report with respect to Allotment letterFile: DEVIATION IN AL.pdf18 Feb 2024
Deviation Report with respect to model copy of AgreementFile: DECLARATION Deviation Report with respect to model copy of Agreement.pdf18 Feb 2024
Other - FinanceFile: MORTGAGE PROPERY.pdf18 Feb 2024
Declaration about Commencement CertificateFile: 1MB_COMMENCEMENT CERTIFICATE.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FY 2020-21 RERA from 5.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22 Rera certificate from 5.pdf15 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2022-23 rere from 5.pdf15 Feb 2024
Proforma of Agreement for saleFile: 0001 MB AFREEMENT TO SALE.pdf15 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLITION.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 archetect.pdf14 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FY 2020-21 RERA from 5.pdf14 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-22 Rera certificate from 5.pdf14 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23 rere from 5.pdf14 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 2017-18 Rera from 5.pdf14 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19 RERA from 5.pdf14 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20 RERA from 5.pdf14 Feb 2024
Form 2AFile: Certificate.pdf11 Jun 2019
Details of encumbrancesFile: Emcumbersum.pdf27 Nov 2018
Declaration in FORM BFile: Form B--compressed.pdf12 Nov 2018
Certificates of CA (Form 3)File: 1mb CA CERTIFICATE .pdf5 Nov 2018
Layout approvalFile: 1 MBLAYOUT.pdf2 Nov 2018
Building plan approvalFile: 1MB BUILDING APP.pdf2 Nov 2018
PAN CardFile: PAN Card.pdf2 Nov 2018
Copy of the legal title reportFile: 1mb.pdf2 Nov 2018
Copy of Layout Approval (in case of layout)File: 1 MBLAYOUT.pdf2 Nov 2018
Building Plan Approval (IOD)File: 1MB BUILDING APP.pdf2 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: 1MB_COMMENCEMENT CERTIFICATE.pdf2 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1MB STRUCTURE ENGG CERT.pdf2 Nov 2018
Proforma of Allotment letterFile: 1 MBAFREEMENT TO SALE.pdf2 Nov 2018
OtherFile: FNL 1MB DEVELOPEMEN AGREEMENT3-ilovepdf-compressed (1)-compressed (1).pdf2 Nov 2018

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SURYATEJ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MITMITA1,400+ in Aurangabad

Builder: SHRIRAJ LABH DEVELOPER

SHRIRAJ LABH DEVELOPER has 2 registrations on MahaRERA, including SURYATEJ and BAPATWADI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SURYATEJ is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SURYATEJ?

The registered promoter entity is SHRIRAJ LABH DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SURYATEJ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SURYATEJ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SURYATEJ?

The professionals named in the filing: Architect: GANESH MHAROLKAR; Engineer: CORE CONSULTANTS; Chartered Accountant: CA SACHIN JAISWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURYATEJ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURYATEJ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURYATEJ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.