Registered Litigation declared Residential / Group Housing project

SURAJ PARK VIEW 2

By SURAJ ESTATE DEVELOPERS LTD

RG-MH-89310 · RERA P51900047891 · Last updated on MahaRERA portal: 4 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 1 complaint at MahaRERA
  • Rs 85.00 crore secured on the land, in favour of HARI AND COMPANY INVESTMENTS MADRAS LIMITED

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 50%
34 of 72Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

SURAJ PARK VIEW 2 is a Residential / Group Housing project by SURAJ ESTATE DEVELOPERS LTD in Mumbai City, Maharashtra, registered with MahaRERA as P51900047891 on 1 Dec 2022. Possession is promised by 31 Dec 2026. 38 of the 72 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSURAJ PARK VIEW 2
  • TypeResidential / Group Housing
  • Location
    • ANANT PATIL MARG
    • DADAR WEST
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900047891
  • ReraGenie IDRG-MH-89310

Builder

  • NameSURAJ ESTATE DEVELOPERS LTD
  • Entity typeCompany
  • CINU99999MH1986PTC040873
  • GSTIN27AAACS8375H1Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorTHOMAS RAJAN
  • Other registrations14 more →
  • Completed4 of 15
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Dec 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Current status

53%38 of 72 units booked
54.7%Work done, per cost certificate

Figures as on 4 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 2NA242272072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.

BUILDING NO 2: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,271 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHARI AND COMPANY INVESTMENTS MADRAS LIMITED
Secured amountRs 85.00 crore
CERSAI search filedYes
Declared on27 May 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3918.69
Proposed, not sanctioned3,419 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAMALA MILLS LOWER PAREL MUMBAI
Estimated costRs 38.95 cr
Cost incurredRs 21.30 cr
Work done54.69%
BuildingWingEstimatedIncurred
-NARs 38.95 crRs 21.30 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUDAY M SHAH
ArchitectPriyanka Rahate
EngineerDR KELKAR DESIGNS PVT LTD
EngineerRohan Thanedar
Chartered AccountantNAVEEN TRIPATHI
Chartered AccountantJiger Zaveri & Associate
PartnerRole in project
SURAJ ESTATE DEVELOPERS LTD-

Litigation declared4

CaseCourtStatus
1861 OF 2010/2010BOMBAY CITY CIVIL COURTClosed
3931 OF 2010/2010BOMBAY CITY CIVIL COURTClosed
1935/2021Bombay City Civil CourtOngoing
723/2018Bombay City Civil CourtOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12400012Amolika BandiwadekarSURAJ ESTATE DEVELOPERS LTD23/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1 December 2025.pdf4 Jul 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE - Park View 2 - Dec 25.pdf4 Jul 2026
Withdrawal Update Form 3File: RERA Form 3 Dec-25 Park View 2.pdf4 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (1).pdf2 Jul 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE - Park View 2 - Sep 25.pdf2 Jul 2026
Withdrawal Update Form 3File: Park View 2 RERA Form 3 Sept-2025.pdf2 Jul 2026
Form 1File: 702_704_AR_SR.pdf25 Aug 2025
Form 2File: ENGINEERS CERTIFICATE - 702-704 SURAJ PARK VIEW 2 - June 25.pdf25 Aug 2025
Form 3File: Form III.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Units Park View 2.pdf25 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 702-704 SURAJ PARK VIEW 2 - Dec 2024.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 702_704_AR.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Parkview-2 Form 2A.pdf8 Apr 2025
Other - TechnicalFile: EC_letter.pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Certificate - Form 5 Park View II - FY 23-24 sg.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 702_704.pdf17 Jul 2024
Declaration about Commencement CertificateFile: FCC - 20 FLOOR - 21052024.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEERS CERTIFICATE - 702-704 SURAJ PARK VIEW 2 - March 2024.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Invoice - FP 702-704 - March 24.pdf6 May 2024
Disclosure of sold/ booked inventoryFile: ENGINEERS CERTIFICATE - 702-704 SURAJ PARK VIEW 2 - March 2024.pdf6 May 2024
Building plan approvalFile: Letter (3).pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Letter (3).pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SURAJ PARK VIEW.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 702_704_Architect certificate (2).pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Suraj Park View II Sept 2023.pdf4 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SURAJ PARK VIEW 2.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: suraj park view-2 architect certificate.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Suraj Park View II March 2023.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: suraj park.pdf2 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SURAJ PARK VIEW 2.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Suraj Park View II June 23.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: suraj park view 2.pdf7 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: suraj park view 2.pdf21 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SURAJ PARK VIEW 2 GGB.pdf21 Jan 2023
CERSAI detailsFile: image28776.pdf17 Nov 2022
Proforma of Agreement for saleFile: RERA Draft Agreement for Sale.pdf15 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviations-Modification.pdf15 Nov 2022
Details of encumbrances concerned to LegalFile: IT MAY CONCERN.pdf17 Oct 2022
Proforma of Allotment letterFile: allotment letter.pdf17 Oct 2022
Deviation Report with respect to Allotment letterFile: image25196.pdf17 Oct 2022
CERSAI detailsFile: Declaration.pdf11 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf11 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Designated Account Declaration - FP 702-704 - Revised.pdf11 Oct 2022
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf27 Sep 2022
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development.pdf27 Sep 2022
Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development.pdf27 Sep 2022
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf27 Sep 2022
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf27 Sep 2022
PAN CardFile: 1 PAN Card.pdf27 Sep 2022
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf27 Sep 2022
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf27 Sep 2022
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf27 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf27 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf27 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development.pdf27 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development.pdf27 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf27 Sep 2022
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf27 Sep 2022
Declaration in FORM BFile: 1 Declaration in FORM B.pdf27 Sep 2022
CERSAI detailsFile: 1 CERSAI details.pdf27 Sep 2022
CERSAI detailsFile: 2 CERSAI details.pdf27 Sep 2022
CERSAI detailsFile: 3 CERSAI details.pdf27 Sep 2022
CERSAI detailsFile: 4 CERSAI details.pdf27 Sep 2022
CERSAI detailsFile: 5 CERSAI details.pdf27 Sep 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PALETTEP51900008207DADAR-WEST, Mumbai City152Aug 2017OngoingDec 2025Registered original: Jun 2023Not delivered
HALLMARKCS 104 BHIMWADI WADALA EAST MUMBAI7-CompletedJul 2016Late, Nov 2016
ETERNITY APARTMENTFP 469 MMC CROSS ROAD MAHIM WEST MUMBAI 40001616-CompletedAug 2011Aug 2011
PARK SIDEFP 888 DATTA RAUL ROAD DADAR WEST MUMBAI 40002828-CompletedJul 2010Late, Feb 2011

How this compares with Mumbai City

53%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SURAJ PARK VIEW 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DADAR WEST780+ in Mumbai City

2 kmSURAJ PARK VIEW 2Completed 84Lapsed / revoked 65Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 246 registered projects within 2 km.

Builder: SURAJ ESTATE DEVELOPERS LTD

SURAJ ESTATE DEVELOPERS LTD has 15 registrations on MahaRERA, including ST ANTHONY APARTMENT and TRANQUIL BAY. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if SURAJ PARK VIEW 2 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SURAJ PARK VIEW 2?

The registered promoter entity is SURAJ ESTATE DEVELOPERS LTD, a company as per the filing. Its CIN U99999MH1986PTC040873 and GSTIN 27AAACS8375H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SURAJ PARK VIEW 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SURAJ PARK VIEW 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SURAJ PARK VIEW 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SURAJ PARK VIEW 2?

The professionals named in the filing: Architect: UDAY M SHAH; Architect: Priyanka Rahate; Engineer: DR KELKAR DESIGNS PVT LTD; Engineer: Rohan Thanedar; Chartered Accountant: NAVEEN TRIPATHI; Chartered Accountant: Jiger Zaveri & Associate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURAJ PARK VIEW 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURAJ PARK VIEW 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURAJ PARK VIEW 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.