Supreme Villagio I
RG-MH-27545 · RERA P52100046867 · Last updated on MahaRERA portal: 27 Jul 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 3 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Supreme Villagio I is a Residential / Group Housing project by Turquoise Housing LLP in Pune, Maharashtra, registered with MahaRERA as P52100046867 on 14 Sep 2022. The registration is recorded completed; possession was promised by 5 Jun 2025. The completion date has moved by 3 months from the original filing. 74 of the 75 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameSupreme Villagio I
- TypeResidential / Group Housing
- Location
- Shirgaon Road
- Somatne
- Somatane
- Mawal
- Pune
- 410506
- Pincode410506
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100046867
- ReraGenie IDRG-MH-27545
Builder
- NameTurquoise Housing LLP
- Entity typeOthers
- LLPINAAZ-2763
- LLPIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Named personsJumani Landmarks LLP, Bijlani Realty LLP, Vishal Suresh Jumani, Sunny Ramesh Bijlani
- Other registrations3 more →
- Completed1 of 4
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Sep 2022
- Promised completion5 Jun 2025
- Revised completionRevised to 5 Jun 2025 (originally 31 Mar 2025)
- Buildings1 building record
- Documents filed117 files
Current status
Figures as on 27 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Row houses B | NA | 2 | 2 | 75 | 0 | 75 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Row houses B: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Row houses B | NA | Rs 48.66 cr | Rs 19.54 cr |
| - | NA | Rs 30.00 cr | Rs 15.91 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Architect Rushikesh H |
| Engineer | Atul Nakhare |
| Chartered Accountant | ANJK & CO LLP |
| Chartered Accountant | A N J K & Co LLP |
| Partner | Role in project |
|---|---|
| Turquoise Housing LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1.The project is 100% completed, and the Occupancy Certificate (OC) has been received. 2.Quarterly Progress Reports (QPRs) have been updated up to date. 3.Form B has been added to the application. 4.The project has received the Occupancy Certificate (OC) from the Pune Metropolitan Region Development Authority (PMRDA) vide letter no. PMRDA/PO/2025/APL/00006, dated 05/06/2025. 5.In view of the above, we are seeking an extension of 66 days, up to the date of receipt of the OC. 6. As the project status is currently marked as lapsed, we are unable to update the system. However, all tasks and activi
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed117
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Turquooise Housing LLP_Form 5_PH I_DSC.pdf | 27 Jul 2026 |
| Form 2A (FY 2022-2023)File: Form 2A-V1 22-23.pdf | 22 Jul 2026 |
| Form 2A (FY 2023-2024)File: Form 2A-V1 23-24.pdf | 22 Jul 2026 |
| Form 2A (FY 2024-2025)File: Form 2A-V1 24-25 (3).pdf | 22 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A-V1 25-26 (1).pdf | 22 Jul 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Supreme Villagio I 24-25.pdf | 22 Jul 2026 |
| Occupational CertificateFile: Architect declaration on OC Villagio I.pdf | 22 Jul 2026 |
| Occupational CertificateFile: Oc Verification Email Supreme Villago I P52100046867.pdf | 22 Jul 2026 |
| Occupational CertificateFile: Supreme Villagio I OC.pdf | 22 Jul 2026 |
| Form 1File: Form 1 Villagio I sept 2024 (2).pdf | 21 Jul 2026 |
| Form 2File: Form 2 Villagio I sept 2024 (1).pdf | 21 Jul 2026 |
| Form 3File: Form 3 Villagio I sept 2024.pdf | 21 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Villagio Phase I.pdf | 21 Jul 2026 |
| Form 5 (FY 2022-2023)File: Form 5 Supreme Villagio I 22-23.pdf | 11 Jul 2026 |
| Form 5 (FY 2023-2024)File: Form 5 Supreme Villagio I 23-24.pdf | 11 Jul 2026 |
| Occupational CertificateFile: Gmail - Copy PMRDA.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: Architect certificate Form VillaGio Phase I - 2 July 2025.pdf | 29 Aug 2025 |
| Withdrawal Update Form 2File: Engineer Certificate Supreme Villagio I.pdf | 29 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Villagio I June 2025.pdf | 29 Aug 2025 |
| Form 1File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 Aug 2025 |
| Form 2File: 11 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 20 Aug 2025 |
| Form 3File: 11 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 Disclosure of sold_ booked inventory.pdf | 20 Aug 2025 |
| Form 1File: 10 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 19 Aug 2025 |
| Form 2File: 12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 19 Aug 2025 |
| Form 3File: 12 CA Certificate on Project Cost & Fund withdrawal (Form 3) (3).pdf | 19 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Disclosure of sold_ booked inventory (2).pdf | 19 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Villagio Phase-I_Arch Certi_March 2025 (1).pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: THLLP_CA Cert_Villagio Phase I (1)_compressed.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: THLLP_Engg Cert _Villagio Phase I.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD VILLAGIO PHASE I.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: THLLP_Quality Cert Villagio Phase I.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Villagio Phase I.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed THLLP Phase I_DSC.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Villagio Phase I Form 2.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Villagio Phase I.pdf | 16 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Villagio Phase I.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Villagio_Phase I CA Certificate_compressed.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Villagio Phase I - Engineer Certificate Q2 2024-25.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 VILLAGIO PHASE - I.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNERS VILLAGIO PHASE - I.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Villagio Phase I.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Supreme Villagio I.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Villagio Ph I.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Villagio Phase I_compressed.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Form VillaGio Phase I - July 5, 2024.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Villajio Phase -I Engineer Certificate Form 2.pdf | 9 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Villagio Ph1_compressed.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA Cert Phase I.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificate phase I.pdf | 12 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Supreme Villagio 1.pdf | 8 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate THLLP Phase I.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RUSHIKESH09227820240110120320.pdf | 10 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Villagio Phase I.pdf | 10 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert villagio phase 1.pdf | 8 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Achitect certificate Form VillaGio Phase I -October 12, 2023 (1).pdf | 27 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS C SUPREME VILLAGIO 1.pdf | 27 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A c supreme villagio 1_compressed.pdf | 27 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Villagio I.pdf | 29 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: villagio PH I.pdf | 2 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I Villagio 1.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate PH I.pdf | 11 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Villagio I.pdf | 11 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Villagio I.pdf | 26 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Achitect certificate Form VillaGio Phase I.pdf | 13 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Villagio Phase I_compressed.pdf | 13 Apr 2023 |
| Proforma of Agreement for saleFile: Agreement copy Villagio Ph I.pdf | 31 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed (1).pdf | 25 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Phase III.pdf | 16 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Achitect certificate Form VillaGio -Jan 7, 2023.pdf | 12 Jan 2023 |
| Proforma of Agreement for saleFile: Revised Agrement For Sale phase I.pdf | 28 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Revised Deviation Report Flat Purchase Agrement.pdf | 28 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Phase I.pdf | 23 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed.pdf | 23 Nov 2022 |
| CERSAI detailsFile: Cersai Commercial.pdf | 6 Sep 2022 |
| CERSAI detailsFile: Cersai Other.pdf | 6 Sep 2022 |
| CERSAI detailsFile: Cersai Residential.pdf | 6 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: AFS Deviation Report Optimized.pdf | 6 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: AFS.pdf | 6 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Phase I New.pdf | 23 Aug 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SUPREME VILLAGIO IIIP52100055048 | Somatane, Pune | 66 | Feb 2024 | Ongoing | Dec 2027 | Not due yet |
| Supreme Villagio IIP52100049506 | Somatne, Pune | 19 | Feb 2023 | Ongoing | Mar 2026 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 117 filed documents as one ZIP, foldered, with a manifest
Keep Supreme Villagio I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Somatne13,700+ in Pune
Filed coordinates, straight-line distance. 32 registered projects within 2 km.
Everland
EVITA KRISALA TOWNSHIP LLP
EVERLYN
EVITA KRISALA TOWNSHIP LLP
ABHIMAAN HOMES PHASE 3
RISING PROPCON LLP
SURABHI CITY PHASE 1
Surabhi Group
ROHAN ANAND PHASE I
ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITE
Urban Life Phase 1
Kakade Vtp Associates
Builder: Turquoise Housing LLP
Turquoise Housing LLP has 4 registrations on MahaRERA, including Supreme Villagio I and Supreme Villagio II. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Supreme Villagio I is delayed beyond 5 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Supreme Villagio I?
The registered promoter entity is Turquoise Housing LLP, an others as per the filing. Its LLPIN AAZ-2763 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Supreme Villagio I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Supreme Villagio I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Supreme Villagio I?
The professionals named in the filing: Architect: Architect Rushikesh H; Engineer: Atul Nakhare; Chartered Accountant: ANJK & CO LLP; Chartered Accountant: A N J K & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Supreme Villagio I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback