Home / Browse projects / Pune, Maharashtra / SUPREME TOWERS PHASE II

Registered No litigation declared Residential / Group Housing project

SUPREME TOWERS PHASE II

By EASTWOOD REALTY LLP

RG-MH-05648 · RERA P52100056095 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Plinth, 86%
73 of 123Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

SUPREME TOWERS PHASE II is a Residential / Group Housing project by EASTWOOD REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100056095 on 10 May 2024. Possession is promised by 30 Jun 2029. 50 of the 123 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUPREME TOWERS PHASE II
  • TypeResidential / Group Housing
  • Location
    • Koregaon Park Mundhwa Raod
    • Mundhwa
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056095
  • ReraGenie IDRG-MH-05648

Builder

  • NameEASTWOOD REALTY LLP
  • Entity typeOthers
  • Named personsSUPREME PALATIAL DEVELOPERS LLP, SUKHWANI REALTORS LLP
  • Other registrations1 more →

Key dates

this monthRegisteredMay 2024PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2024
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed135 files

Current status

41%50 of 123 units booked
16.7%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower T2NA36331230123

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 86%.

Tower T2: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)63%
Plinth86%
Stilt Floor15%
Slabs of Super Structure1%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes43%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed348

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots348
Closed/Covered348

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,834 sq m
Land owned byNot the promoter
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025
LandownerVillageDistrict
Kishore Sharad PingaleMundhawaPune
Anjali kishore PingaleMundhawaPune
Kaustubh kishore pingaleMundhawaPune

Approvals and building plan

Sanctioning authorityPune municipal corporation
Permissible FSI26413.22
Proposed, not sanctioned26,413 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 184.33 cr
Cost incurredRs 30.86 cr
Work done16.74%
BuildingWingEstimatedIncurred
Tower T2NARs 159.12 crRs 29.99 cr
-NARs 25.21 crRs 87.44 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Rushikesh H
ArchitectRushikesh H
EngineerShashank Kesare
EngineerAmit Jayprakash Bille
Chartered AccountantA N J K & Co LLP
Chartered AccountantANJK and Co LLP
Chartered AccountantJASJIT and Co
PartnerRole in project
EASTWOOD REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Supremer Tower Phase II Pg 1.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 2.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 3.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 4.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 5.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 6.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 7.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 8.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 9.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 10.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 11.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 12.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 13.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 14.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 15.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 16.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 17.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 18.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 19.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 20.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 21.pdf22 Apr 2026
Building plan approvalFile: Supreme Tower Phase II Pg 22.pdf22 Apr 2026
Withdrawal Update Form 1File: Supreme Towers Phase II Form 1 Achitect certificate Q4 March 2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Supreme Towers Phase 2 FORM 2 Engineering Certificate Q4 March 2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Supreme Towers Phase II Form3 CA Certificate Q4 March 2026.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Supreme Towers Phase 2 FORM 2A Quality Assurance Engineering Certificate Q4 March 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: Q3 Form 1 Supreme Towers Phase 2.pdf20 Jan 2026
Withdrawal Update Form 2File: Q3 Form 2 Supreme Towers 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Q3 FORM 3 Supreme T2 (1).pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 Supreme Tower Phase II - October 16, 2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Supreme T2 Form-2 Engineeru0027s Certificate.pdf18 Oct 2025
Withdrawal Update Form 3File: Supreme T2 CA Certificate.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: EWRLLP - Towers PH II Form 5 F Y 24-25.pdf29 Sep 2025
Form 1File: Supreme Tower Phase II Form 1 June 2025.pdf19 Jul 2025
Form 2File: Supreme Tower Phase II Form 2 June 2025.pdf19 Jul 2025
Form 3File: Supreme Towers Phase II Form 3 June 2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Supreme Towers Ph II Disclosure of Sold Unsold June 2025.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Supreme Tower Phase II Form 2A 2024-25.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Supreme Tower Phase II March 2025.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TOWERS PHASE II_March 2025_Final.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Supreme Tower Phase II March 2025.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold inventory Phase II March 2025.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Towers Phase II December 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Supreme Towers 2 December 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Supreme Towers 2 Form 2 December 2024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unslod Supreme T2 December 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Supreme Towers-Phase 2 FORM 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNERS TOWERS PHASE - II.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Towers Phase II (1).pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Supreme Towers Ph II.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Supreme Towers Ph-II final.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Supreme Towers Phase II final.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Supreme Towers Ph II_compressed.pdf19 Jul 2024
Layout approvalFile: B P Layout Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 Calculation Sheet Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 Elevation Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 First Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 First Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 LMR Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 Podium Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 Refuge Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 Section AA and CC Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 Section BB Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 Section BB Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 Terrace Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: T2 Typical Floor Plan Phase II.pdf21 Jun 2024
Copy of Layout Approval (in case of layout)File: B P Layout Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 Calculation Sheet Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 Elevation Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 First Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 First Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 LMR Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 Podium Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 Refuge Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 Section AA and CC Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 Section BB Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 Section BB Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 Terrace Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: T2 Typical Floor Plan Phase II.pdf21 Jun 2024

How this compares with Pune

41%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUPREME TOWERS PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa13,700+ in Pune

2 kmSUPREME TOWERS PHASE IICompleted 4Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: EASTWOOD REALTY LLP

EASTWOOD REALTY LLP has 2 registrations on MahaRERA, including SUPREME TOWERS PHASE I and SUPREME TOWERS PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SUPREME TOWERS PHASE II is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUPREME TOWERS PHASE II?

The registered promoter entity is EASTWOOD REALTY LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUPREME TOWERS PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUPREME TOWERS PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUPREME TOWERS PHASE II?

The professionals named in the filing: Architect: Architect Rushikesh H; Architect: Rushikesh H; Engineer: Shashank Kesare; Engineer: Amit Jayprakash Bille; Chartered Accountant: A N J K & Co LLP; Chartered Accountant: ANJK and Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUPREME TOWERS PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUPREME TOWERS PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUPREME TOWERS PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.