Home / Browse projects / Pune, Maharashtra / SUPREME TOWERS PHASE I

Registered No litigation declared Residential / Group Housing project

SUPREME TOWERS PHASE I

By EASTWOOD REALTY LLP

RG-MH-90495 · RERA P52100053868 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Plinth, 87%
48 of 123Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 174 documents Report an error

SUPREME TOWERS PHASE I is a Residential / Group Housing project by EASTWOOD REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100053868 on 8 Dec 2023. Possession is promised by 30 Jun 2029. 75 of the 123 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUPREME TOWERS PHASE I
  • TypeResidential / Group Housing
  • Location
    • koregaon park mundhwa road
    • Mundhwa
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053868
  • ReraGenie IDRG-MH-90495

Builder

  • NameEASTWOOD REALTY LLP
  • Entity typeOthers
  • Named personsSUPREME PALATIAL DEVELOPERS LLP, SUKHWANI REALTORS LLP
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2023PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Dec 2023
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed174 files

Current status

61%75 of 123 units booked
22.2%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER T1NA35321230123

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 87%.

TOWER T1: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)65%
Plinth87%
Stilt Floor57%
Slabs of Super Structure24%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes43%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed194

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots194
Closed/Covered194

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,786 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025
LandownerVillageDistrict
KISHORE SHARAD PINGALE AND OTHERSMundhawaPune
Anjali kishore PingaleMundhawaPune
Kaustubh Kishore PingaleMundhawaPune

Approvals and building plan

Sanctioning authorityPune municipal corporation
Permissible FSI26425.42
Proposed, not sanctioned26,419 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD Upper Ground Floor, Building H Gaikwad Avenue, S No 127/1A, Ground Floor, Off ITI Road
Estimated costRs 184.33 cr
Cost incurredRs 40.90 cr
Work done22.19%
BuildingWingEstimatedIncurred
TOWER T1NARs 159.12 crRs 40.02 cr
-NARs 25.21 crRs 87.44 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRushikesh H
EngineerShashank Kesare
EngineerAmit Jayprakash Bille
Chartered AccountantANJK and Co LLP
Chartered AccountantJASJIT and Co
PartnerRole in project
EASTWOOD REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed174

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 174 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Tower 1 July 4 2026.pdf16 Jul 2026
Withdrawal Update Form 2File: FORM 2 SUPREME TOWERS PH-I.pdf16 Jul 2026
Withdrawal Update Form 3File: Supreme Towers Phase I CA Certificate Form 3 Q4 March 2026.pdf16 Jul 2026
Withdrawal Update Form 1File: Supreme Towers Phase I Form 1 Achitect certificate Q4 March 2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Supreme Towers Phase 1 FORM 2 Engineering Certificate Q4 March 2026.pdf20 Apr 2026
Withdrawal Update Form 3File: Supreme Towers Phase I CA Certificate Form 3 Q4 March 2026.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Supreme Towers Phase 1 FORM 2A Quality Assurance Engineering Certificate Q4 March 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: Q3 Form 1_Suprme Towers Phase I.pdf20 Jan 2026
Withdrawal Update Form 2File: Q3 Form 2 Supreme Tower Phase I.pdf20 Jan 2026
Withdrawal Update Form 3File: Q3 FORM 3 Supreme T1 (1).pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 Supreme Tower Phase I_October 16, 2025.pdf19 Oct 2025
Withdrawal Update Form 2File: Supreme T1 Form-2 Engineeru0027s Certificate.pdf19 Oct 2025
Withdrawal Update Form 3File: Supreme Tower 1 Form 3_CA Certificate.pdf19 Oct 2025
Form 1File: Form 1 Supreme Tower I June 2025.pdf13 Oct 2025
Form 2File: Form 2 Supreme Tower I June 2025.pdf13 Oct 2025
Form 3File: Form 3 Supreme Towers Phase I June 2025 Final.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Supreme Tower I June 2025.pdf13 Oct 2025
Form 5 (FY 2024-2025)File: EWRLLP - Towers PH I Form 5 F Y 24-25 (1).pdf29 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A Supreme Tower I.pdf1 Aug 2025
Form 1File: Form 1 Supreme Tower I June 2025.pdf19 Jul 2025
Form 2File: Form 2 Supreme Tower I June 2025.pdf19 Jul 2025
Form 3File: Form 3 Supreme Towers Phase I June 2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Supreme Tower I June 2025.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Supreme Tower Phase 1 March 2025.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Supreme Tower Phase 1 March 2025 Final.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Supreme Tower Phase 1 March 2025.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold inventory Supreme Tower Phase 1 March 2025.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Supreme T 1 Form-1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Supreme T 1 CA Certificate.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Supreme T 1 Form 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Supreme T 1 Sold unsold.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Supreme Towers-Phase 1 FORM 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNERS TOWERS PHASE - I.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Towers Phase I (1).pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Towers Phase I.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Supreme Towers Phase I.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Supreme Towers Ph-I final.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Supreme Towers Phase I final.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Supreme Towers Ph I_compressed.pdf19 Jul 2024
Layout approvalFile: B P Layout Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 4 T1 Calculation Sheet 1 Phase I.pdf21 Jun 2024
Building plan approvalFile: 5 T1 Calculation Sheet 2 Phase II.pdf21 Jun 2024
Building plan approvalFile: 8 T1 Podium Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 9 T1 First Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 7 T1 Basement Ground Parking Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 10 T1 Typical Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 11 T1 Refuge Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 12 T1 - 28th Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 13 T1 - 29th Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 14 T1 - 30th 31st Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 15 T1 - 32nd Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 16 T1 33rd Amenity Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 17 T1 Terrace LMR Floor Plan Phase I.pdf21 Jun 2024
Building plan approvalFile: 18 T1 Elevation Phase I.pdf21 Jun 2024
Building plan approvalFile: 19 T1 Section AA and CC Phase I.pdf21 Jun 2024
Building plan approvalFile: 20 T1 Section BB Phase I.pdf21 Jun 2024
Layout approvalFile: B P Layout Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: 6 T2 Calculation Sheet Phase II.pdf21 Jun 2024
Building plan approvalFile: 8 T2 Podium Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: 9 T2 First Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: 10 T2 Typical Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: 11 T2 Refuge Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: 12 T2 Terrace Floor Plan Phase II.pdf21 Jun 2024
Building plan approvalFile: 13 T2 LMR Floor Plan Phase II.pdf21 Jun 2024
Copy of Layout Approval (in case of layout)File: B P Layout Plan Phase II.pdf21 Jun 2024
Copy of Layout Approval (in case of layout)File: B P Layout Plan Phase I.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 T2 Calculation Sheet Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 8 T2 Podium Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 9 T2 First Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 T2 Typical Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 11 T2 Refuge Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 12 T2 Terrace Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 13 T2 LMR Floor Plan Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 T1 Calculation Sheet 1 Phase I.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 T1 Calculation Sheet 2 Phase II.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 8 T1 Podium Floor Plan Phase I.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 9 T1 First Floor Plan Phase I.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 7 T1 Basement Ground Parking Floor Plan Phase I.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 T1 Typical Floor Plan Phase I.pdf21 Jun 2024

How this compares with Pune

61%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUPREME TOWERS PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa13,700+ in Pune

2 kmSUPREME TOWERS PHASE ICompleted 19Lapsed / revoked 10Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: EASTWOOD REALTY LLP

EASTWOOD REALTY LLP has 2 registrations on MahaRERA, including SUPREME TOWERS PHASE I and SUPREME TOWERS PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SUPREME TOWERS PHASE I is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUPREME TOWERS PHASE I?

The registered promoter entity is EASTWOOD REALTY LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUPREME TOWERS PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUPREME TOWERS PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUPREME TOWERS PHASE I?

The professionals named in the filing: Architect: Rushikesh H; Engineer: Shashank Kesare; Engineer: Amit Jayprakash Bille; Chartered Accountant: ANJK and Co LLP; Chartered Accountant: JASJIT and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUPREME TOWERS PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUPREME TOWERS PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUPREME TOWERS PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.