Home / Browse projects / Pune, Maharashtra / SUPREME TOWERS PHASE I
SUPREME TOWERS PHASE I
RG-MH-90495 · RERA P52100053868 · Last updated on MahaRERA portal: 16 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUPREME TOWERS PHASE I is a Residential / Group Housing project by EASTWOOD REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100053868 on 8 Dec 2023. Possession is promised by 30 Jun 2029. 75 of the 123 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameSUPREME TOWERS PHASE I
- TypeResidential / Group Housing
- Location
- koregaon park mundhwa road
- Mundhwa
- Mundhawa
- Haveli
- Pune
- 411036
- Pincode411036
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053868
- ReraGenie IDRG-MH-90495
Builder
- NameEASTWOOD REALTY LLP
- Entity typeOthers
- Named personsSUPREME PALATIAL DEVELOPERS LLP, SUKHWANI REALTORS LLP
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Dec 2023
- Promised completion30 Jun 2029
- Revised completionNone
- Buildings1 building record
- Documents filed174 files
Current status
Figures as on 16 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER T1 | NA | 35 | 32 | 123 | 0 | 123 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 87%.
TOWER T1: 40% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 65% |
| Plinth | 87% |
| Stilt Floor | 57% |
| Slabs of Super Structure | 24% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 3% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 55% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 43% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 20% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed194
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| KISHORE SHARAD PINGALE AND OTHERS | Mundhawa | Pune |
| Anjali kishore Pingale | Mundhawa | Pune |
| Kaustubh Kishore Pingale | Mundhawa | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TOWER T1 | NA | Rs 159.12 cr | Rs 40.02 cr |
| - | NA | Rs 25.21 cr | Rs 87.44 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rushikesh H |
| Engineer | Shashank Kesare |
| Engineer | Amit Jayprakash Bille |
| Chartered Accountant | ANJK and Co LLP |
| Chartered Accountant | JASJIT and Co |
| Partner | Role in project |
|---|---|
| EASTWOOD REALTY LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2029
Documents filed174
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 174 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Tower 1 July 4 2026.pdf | 16 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 SUPREME TOWERS PH-I.pdf | 16 Jul 2026 |
| Withdrawal Update Form 3File: Supreme Towers Phase I CA Certificate Form 3 Q4 March 2026.pdf | 16 Jul 2026 |
| Withdrawal Update Form 1File: Supreme Towers Phase I Form 1 Achitect certificate Q4 March 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Supreme Towers Phase 1 FORM 2 Engineering Certificate Q4 March 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Supreme Towers Phase I CA Certificate Form 3 Q4 March 2026.pdf | 20 Apr 2026 |
| Form 2A (FY 2025-2026)File: Supreme Towers Phase 1 FORM 2A Quality Assurance Engineering Certificate Q4 March 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Q3 Form 1_Suprme Towers Phase I.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Q3 Form 2 Supreme Tower Phase I.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Q3 FORM 3 Supreme T1 (1).pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Supreme Tower Phase I_October 16, 2025.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: Supreme T1 Form-2 Engineeru0027s Certificate.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: Supreme Tower 1 Form 3_CA Certificate.pdf | 19 Oct 2025 |
| Form 1File: Form 1 Supreme Tower I June 2025.pdf | 13 Oct 2025 |
| Form 2File: Form 2 Supreme Tower I June 2025.pdf | 13 Oct 2025 |
| Form 3File: Form 3 Supreme Towers Phase I June 2025 Final.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Supreme Tower I June 2025.pdf | 13 Oct 2025 |
| Form 5 (FY 2024-2025)File: EWRLLP - Towers PH I Form 5 F Y 24-25 (1).pdf | 29 Sep 2025 |
| Form 2A (FY 2023-2024)File: Form 2A Supreme Tower I.pdf | 1 Aug 2025 |
| Form 1File: Form 1 Supreme Tower I June 2025.pdf | 19 Jul 2025 |
| Form 2File: Form 2 Supreme Tower I June 2025.pdf | 19 Jul 2025 |
| Form 3File: Form 3 Supreme Towers Phase I June 2025.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Supreme Tower I June 2025.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Supreme Tower Phase 1 March 2025.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Supreme Tower Phase 1 March 2025 Final.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Supreme Tower Phase 1 March 2025.pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventory Supreme Tower Phase 1 March 2025.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Supreme T 1 Form-1.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Supreme T 1 CA Certificate.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Supreme T 1 Form 2.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Supreme T 1 Sold unsold.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Supreme Towers-Phase 1 FORM 3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNERS TOWERS PHASE - I.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Towers Phase I (1).pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Towers Phase I.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Supreme Towers Phase I.pdf | 31 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Supreme Towers Ph-I final.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Supreme Towers Phase I final.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Supreme Towers Ph I_compressed.pdf | 19 Jul 2024 |
| Layout approvalFile: B P Layout Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 4 T1 Calculation Sheet 1 Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 5 T1 Calculation Sheet 2 Phase II.pdf | 21 Jun 2024 |
| Building plan approvalFile: 8 T1 Podium Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 9 T1 First Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 7 T1 Basement Ground Parking Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 10 T1 Typical Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 11 T1 Refuge Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 12 T1 - 28th Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 13 T1 - 29th Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 14 T1 - 30th 31st Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 15 T1 - 32nd Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 16 T1 33rd Amenity Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 17 T1 Terrace LMR Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 18 T1 Elevation Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 19 T1 Section AA and CC Phase I.pdf | 21 Jun 2024 |
| Building plan approvalFile: 20 T1 Section BB Phase I.pdf | 21 Jun 2024 |
| Layout approvalFile: B P Layout Plan Phase II.pdf | 21 Jun 2024 |
| Building plan approvalFile: 6 T2 Calculation Sheet Phase II.pdf | 21 Jun 2024 |
| Building plan approvalFile: 8 T2 Podium Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building plan approvalFile: 9 T2 First Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building plan approvalFile: 10 T2 Typical Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building plan approvalFile: 11 T2 Refuge Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building plan approvalFile: 12 T2 Terrace Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building plan approvalFile: 13 T2 LMR Floor Plan Phase II.pdf | 21 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: B P Layout Plan Phase II.pdf | 21 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: B P Layout Plan Phase I.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 T2 Calculation Sheet Phase II.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 8 T2 Podium Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 9 T2 First Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10 T2 Typical Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 11 T2 Refuge Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 12 T2 Terrace Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 13 T2 LMR Floor Plan Phase II.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 T1 Calculation Sheet 1 Phase I.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 T1 Calculation Sheet 2 Phase II.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 8 T1 Podium Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 9 T1 First Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 7 T1 Basement Ground Parking Floor Plan Phase I.pdf | 21 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10 T1 Typical Floor Plan Phase I.pdf | 21 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 174 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUPREME TOWERS PHASE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mundhwa13,700+ in Pune
Filed coordinates, straight-line distance. 83 registered projects within 2 km.
Godrej Aqua Vista
Oxford Realty LLP
Godrej Elaris
Godrej Properties Limited
Sukhwani Hermosa Casa
Sukhwani Associates
Basil Mondale
velx constructions llp
TREMONT D, E AND F WINGS
The Excellaa
ATELIER GREENS
ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADAN
Builder: EASTWOOD REALTY LLP
EASTWOOD REALTY LLP has 2 registrations on MahaRERA, including SUPREME TOWERS PHASE I and SUPREME TOWERS PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SUPREME TOWERS PHASE I is delayed beyond 30 Jun 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUPREME TOWERS PHASE I?
The registered promoter entity is EASTWOOD REALTY LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUPREME TOWERS PHASE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SUPREME TOWERS PHASE I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUPREME TOWERS PHASE I?
The professionals named in the filing: Architect: Rushikesh H; Engineer: Shashank Kesare; Engineer: Amit Jayprakash Bille; Chartered Accountant: ANJK and Co LLP; Chartered Accountant: JASJIT and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUPREME TOWERS PHASE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.