ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / SUPER HOMEZ-PADMAVATI PARADISE

Registered No litigation declared Residential / Group Housing project

SUPER HOMEZ-PADMAVATI PARADISE

By MANGALMURTI ESTATE DEVELOPERS LLP

RG-MH-33071 · RERA P99000080543 · Last updated on MahaRERA portal: 16 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
239 of 239Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

SUPER HOMEZ-PADMAVATI PARADISE is a Residential / Group Housing project by MANGALMURTI ESTATE DEVELOPERS LLP in Palghar, Maharashtra, registered with MahaRERA as P99000080543 on 16 Jun 2025. Possession is promised by 31 Dec 2028. 0 of the 239 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUPER HOMEZ-PADMAVATI PARADISE
  • TypeResidential / Group Housing
  • Location
    • VITHALWADI
    • VEER SAWARKAR MARG
    • NEAR PRASADAM BUILDING
    • VIRAR EAST
    • TALUKA VASAI
    • DISTRICT PALGHAR
    • VIRAR EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • ...
  • Pincode401305
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000080543
  • ReraGenie IDRG-MH-33071

Builder

  • NameMANGALMURTI ESTATE DEVELOPERS LLP
  • Entity typePartnership
  • PartnersANUP ASHOK MEHTA, DEVENDRA KHEMRAJ JAIN
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jun 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed50 files

Current status

0%0 of 239 units booked
9.0%Work done, per cost certificate

Figures as on 16 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 2NA22212390239

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

BUILDING NO 2: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Open Space50

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area665 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
SANGEETA VASANT PATILVasai-Virar City (M Corp)Palghar
MANISH VASANT PATILVasai-Virar City (M Corp)Palghar
JAYDEEP VASANT PATILVasai-Virar City (M Corp)Palghar
RAJ VASANT PATILVasai-Virar City (M Corp)Palghar
SMITA GAJANAN RAUTMumbai CityMumbai City
PRASADAM ASSOCIATESVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI12036.34
Proposed, not sanctioned12,036 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD GR FLR SURVEY NO 265 MHATRE WADI NEAR VIRAR RAILWAY STATION VIRAR W MAHARASHTRA 401303
Estimated costRs 39.54 cr
Cost incurredRs 3.56 cr
Work done9.0%
BuildingWingEstimatedIncurred
BUILDING NO 2NARs 35.59 crRs 3.56 cr
-NARs 3.95 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHYAM R KASHID
EngineerRAHUL S KAPOOR
EngineerAMIT NANDKUMAR SANKHE
Chartered AccountantH V JAIN & ASSOCIATES
PartnerRole in project
MANGALMURTI ESTATE DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: vasant patil death certificate.pdf16 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: NON OPENING SMITA.pdf16 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: NON OPENING PATIL.pdf16 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf16 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: NON OPENING PRASADAM.pdf16 May 2025
Other - TechnicalFile: PLOT AREA CALCULATION AND RECEIPT.pdf16 May 2025
Other - TechnicalFile: PLOT AREA.pdf16 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: NON OPENING PRASADAM.pdf16 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: NON OPENING PATIL.pdf16 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: NON OPENING SMITA.pdf16 May 2025
CERSAI detailsFile: CERSAI_Report.pdf29 Apr 2025
Other - TechnicalFile: 6 Other - Technical.pdf29 Apr 2025
Copy of the legal title reportFile: Tiltle Search.pdf21 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Aditya Birla.pdf21 Apr 2025
Declaration in FORM BFile: 1 Declaration in FORM B .pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 20022025.pdf21 Apr 2025
Other - LegalFile: clarification about Land Ownwr developer.pdf21 Apr 2025
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate .pdf21 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance Letter Aditya Birla.pdf21 Apr 2025
Other - TechnicalFile: DD RECEIPT CC.pdf21 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank.pdf21 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured Unsecured Loan and CA Certificate.pdf21 Apr 2025
Layout approvalFile: Layout.pdf15 Mar 2025
Building plan approvalFile: Ground Typical.pdf15 Mar 2025
Building plan approvalFile: 21st Floor.pdf15 Mar 2025
Building plan approvalFile: N A Order Prasadam Association.pdf15 Mar 2025
PAN CardFile: PAN MEDLLP.pdf15 Mar 2025
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Legal.pdf15 Mar 2025
Details of encumbrances concerned to FinanceFile: LOE FINANCE.pdf15 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout.pdf15 Mar 2025
Proforma of Allotment letterFile: allotment letter of Padmavati paradise Pending.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 20-02-2025.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 20-02-2025.pdf15 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: RDP-12-07-2024.pdf15 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Ground Typical.pdf15 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: N A Order Prasadam Association.pdf15 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 21st Floor.pdf15 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 20-02-2025.pdf15 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 20-02-2025 Lanlord.pdf15 Mar 2025
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter .pdf15 Mar 2025
Details of encumbrances concerned to LegalFile: LOE FINANCE.pdf15 Mar 2025
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Legal.pdf15 Mar 2025
Other - TechnicalFile: Area Under Plinth.PDF15 Mar 2025
Other - TechnicalFile: 9 Other - Legal (ACCEPTENAT LETTER AND DECLARATION FROM ARCHITECT FOR NAME IN CC).pdf15 Mar 2025
Other - TechnicalFile: Authority letter.pdf15 Mar 2025
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to Agreement.pdf15 Mar 2025
Proforma of Agreement for saleFile: AFS of model agreement padmavati paradise Pending.pdf15 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations AM.pdf15 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations DJ.pdf15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2A.pdf15 Mar 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
UNIQUE AVENUE 210P99000030889NILEMORE, NALASOPARA WEST, PalgharSep 2021CompletedAug 2026May 2024

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUPER HOMEZ-PADMAVATI PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR EAST3,200+ in Palghar

2 kmSUPER HOMEZ-PADMAVATI PACompleted 79Lapsed / revoked 48Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 213 registered projects within 2 km.

Builder: MANGALMURTI ESTATE DEVELOPERS LLP

MANGALMURTI ESTATE DEVELOPERS LLP has 1 registration on MahaRERA, including SUPER HOMEZ-PADMAVATI PARADISE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SUPER HOMEZ-PADMAVATI PARADISE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUPER HOMEZ-PADMAVATI PARADISE?

The registered promoter entity is MANGALMURTI ESTATE DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUPER HOMEZ-PADMAVATI PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUPER HOMEZ-PADMAVATI PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUPER HOMEZ-PADMAVATI PARADISE?

The professionals named in the filing: Architect: SHYAM R KASHID; Engineer: RAHUL S KAPOOR; Engineer: AMIT NANDKUMAR SANKHE; Chartered Accountant: H V JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUPER HOMEZ-PADMAVATI PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUPER HOMEZ-PADMAVATI PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUPER HOMEZ-PADMAVATI PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.