AV PEARL BUILDING NO. 3, WING B

By SHREE SAI JIVDANI DEVELOPERS LLP

RG-MH-30942 · RERA P99000079276 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
103 of 276Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

AV PEARL BUILDING NO. 3, WING B is a Residential / Group Housing project by SHREE SAI JIVDANI DEVELOPERS LLP in Palghar, Maharashtra, registered with MahaRERA as P99000079276 on 25 Feb 2025. Possession is promised by 31 Dec 2030. 173 of the 276 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameAV PEARL BUILDING NO. 3, WING B
  • TypeResidential / Group Housing
  • Location
    • Viva Hari Tara Complex. Village More & Virar
    • Opp Lee Vivanta Hotel
    • Virar Nallasopara link Road
    • Virar East
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • RERA no.P99000079276
  • ReraGenie IDRG-MH-30942

Builder

  • NameSHREE SAI JIVDANI DEVELOPERS LLP
  • Entity typePartnership
  • PartnersAmit Vinodanand Mishra, Ashwanikumar Mishra, Shubham Mishra

Key dates

this monthRegisteredFeb 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Feb 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

63%173 of 276 units booked
38.2%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AV PEARL BUILDING NO 3, WING BNA232325917276

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

AV PEARL BUILDING NO 3, WING B: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed291

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots291
Open Space291

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,717 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 May 2026
LandownerVillageDistrict
VIVA HOLDINGSVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI10687.03
Proposed, not sanctioned10,687 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., SaiSankoul, Achole, Nallasopara East, Thane Dist., Maharashtra.401209
Estimated costRs 63.95 cr
Cost incurredRs 24.46 cr
Work done38.25%
BuildingWingEstimatedIncurred
AV PEARL BUILDING NO 3, WING BNARs 54.36 crRs 24.46 cr
-NARs 9.59 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDAWA & ASSOCIATES
EngineerMUKESH KUMAR STRUCTURAL ENGINEER
EngineerPramod Pandey
Chartered AccountantJKD ASSOCIATES
Chartered AccountantCHANDAN CHAUDHARY AND ASSOCIATES
Chartered AccountantDHIRAJ KANARAM AND CO
PartnerRole in project
SHREE SAI JIVDANI DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: SSJD Form-1 Jan to Mar-26.pdf27 Jun 2026
Withdrawal Update Form 1File: SSJD Form-1 Jan to Mar-26.pdf27 Jun 2026
Withdrawal Update Form 2File: SSJD Form-2 Jan to Mar-26.pdf27 Jun 2026
Withdrawal Update Form 2File: SSJD Form-2 Jan to Mar-26.pdf27 Jun 2026
Withdrawal Update Form 3File: FORM-3 JAN TO MARCH 2026 SSJD_compressed.pdf27 Jun 2026
Withdrawal Update Form 3File: FORM-3 JAN TO MARCH 2026 SSJD_compressed.pdf27 Jun 2026
Layout approvalFile: layout plan av pearl bldg no 3.pdf18 Jun 2026
Form 1File: SSJD Form-1 Jan to Mar-26.pdf25 May 2026
Form 2File: SSJD Form-2 Jan to Mar-26.pdf25 May 2026
Form 3File: SSJD Form -3 Jan to Mar-26.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Unit Date 31-03-2026.pdf25 May 2026
Form 2A (FY 2024-2025)File: Form-2A FY-2024-25.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Form-2A FY-2025-26.pdf20 Apr 2026
Form 5 (FY 2024-2025)File: Shree Sai Jivdani Form 5 FY-24-25.pdf20 Apr 2026
Form 1File: Form-1 Shree Sai Jivdani Oct to dec-25.pdf2 Mar 2026
Form 2File: Form-2 Shree Sai Jivdani Oct to Dec-25.pdf2 Mar 2026
Form 3File: Form-3 SSJD Oct to Dec-25.pdf2 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold Dec-25 - SSJD_11zon.pdf2 Mar 2026
Form 1File: Form-1 Shree Sai Jivdani Jul to Sep-25.pdf18 Feb 2026
Form 2File: Form-2 SSJD Jul to Sep-25.pdf18 Feb 2026
Form 3File: Form-3 SSJD Jul to Sep-25.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold Sep-25 - SSJD_11zon.pdf18 Feb 2026
Form 1File: shri sai jivdani-1.pdf13 Sep 2025
Form 2File: shree sai jivdani-2.pdf13 Sep 2025
Form 3File: shree sai jivdani-3.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: AV PEARL-30-06-25_compressed.pdf13 Sep 2025
Form 1File: Shree Sai Form-1 Jan to Mar-25.pdf13 Sep 2025
Form 2File: Shree Sai Form-2 Jan to Mar-25.pdf13 Sep 2025
Form 3File: Form-3 SSJ revised.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold list jan to mar-25_compressed.pdf13 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Sai Form-1 Jan to Mar-25.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Sai Form-3 Jan to Mar-25_compressed.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Sai Form-2 Jan to Mar-25.pdf3 May 2025
Declaration in FORM BFile: Adobe Scan 21 Feb 2025-merged.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: cc verification av pearl.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 Shree Sai Jivdani-compressed.pdf13 Feb 2025
Other - FinanceFile: BANK DECLARATION.pdf13 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK DECLARATION.pdf13 Feb 2025
Building plan approvalFile: Bldg 3 Wing B Sheet 25 of 47 (1)_11zon.pdf28 Jan 2025
Building plan approvalFile: Bldg 3 Wing B Sheet 26 of 47_11zon.pdf28 Jan 2025
Building plan approvalFile: Bldg 3 Wing B Sheet 27 of 47_11zon.pdf28 Jan 2025
Copy of the legal title reportFile: TITLE AV PEARL_11zon.pdf28 Jan 2025
Details of encumbrances concerned to FinanceFile: Decleration -Encumbrances to Finance.pdf28 Jan 2025
Details of encumbrances concerned to FinanceFile: Decleration -Encumbrances to Legal.pdf28 Jan 2025
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval av pearl.pdf28 Jan 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER- NEW FORMAT.pdf28 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: More Revised Permission 15-07-2024 (2).pdf28 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Bldg 3 Wing B Sheet 25 of 47 (1)_11zon.pdf28 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Bldg 3 Wing B Sheet 26 of 47_11zon.pdf28 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Bldg 3 Wing B Sheet 27 of 47_11zon.pdf28 Jan 2025
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf28 Jan 2025
CERSAI detailsFile: Decleration -Encumbrances to CERSAI.pdf28 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: declaration bank account- HILL CREST- SAI RAM.pdf28 Jan 2025
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT OF ALLOTMENT LETTER.pdf28 Jan 2025
Details of encumbrances concerned to LegalFile: Decleration -Encumbrances to Finance.pdf28 Jan 2025
Details of encumbrances concerned to LegalFile: Decleration -Encumbrances to Legal.pdf28 Jan 2025
Other - TechnicalFile: declaration bank account- HILL CREST.pdf28 Jan 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF SALE AGREEMENT.pdf28 Jan 2025
Proforma of Agreement for saleFile: RERA SALE AGREEMENT.pdf28 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE- Amit.pdf28 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE- Ashwani.pdf28 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE- Shubham.pdf28 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF LOAN.pdf28 Jan 2025
PAN CardFile: Pan Card - Shree sai.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DAWA ASSOCIATES.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER20250122165358.pdf25 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: confirmation letter Shree Sai Jivdani developers llp RERA (1).pdf25 Jan 2025

How this compares with Palghar

63%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AV PEARL BUILDING NO. 3, WING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar East3,200+ in Palghar

Builder: SHREE SAI JIVDANI DEVELOPERS LLP

SHREE SAI JIVDANI DEVELOPERS LLP has 1 registration on MahaRERA, including AV PEARL BUILDING NO. 3, WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if AV PEARL BUILDING NO. 3, WING B is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AV PEARL BUILDING NO. 3, WING B?

The registered promoter entity is SHREE SAI JIVDANI DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AV PEARL BUILDING NO. 3, WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AV PEARL BUILDING NO. 3, WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AV PEARL BUILDING NO. 3, WING B?

The professionals named in the filing: Architect: DAWA & ASSOCIATES; Engineer: MUKESH KUMAR STRUCTURAL ENGINEER; Engineer: Pramod Pandey; Chartered Accountant: JKD ASSOCIATES; Chartered Accountant: CHANDAN CHAUDHARY AND ASSOCIATES; Chartered Accountant: DHIRAJ KANARAM AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AV PEARL BUILDING NO. 3, WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AV PEARL BUILDING NO. 3, WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AV PEARL BUILDING NO. 3, WING B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.