Registered No litigation declared Residential / Group Housing project

MJV CORPORATION

By VYANKATI CHINNAVISHRWAPAPA SAMAKOTI

RG-MH-07207 · RERA P99000054624 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 18 months from the original
24 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 95%
108 of 311Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

MJV CORPORATION is a Residential / Group Housing project by VYANKATI CHINNAVISHRWAPAPA SAMAKOTI in Palghar, Maharashtra, registered with MahaRERA as P99000054624 on 2 Feb 2024. Possession is promised by 30 Jun 2027. The completion date has moved by 18 months from the original filing. 203 of the 311 units on this registration are recorded sold or booked, and 24 of 33 construction stages are filed complete.

At a glance

Project

  • NameMJV CORPORATION
  • TypeResidential / Group Housing
  • Location
    • KOPRI NAKA
    • VIRAR EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000054624
  • ReraGenie IDRG-MH-07207

Builder

  • NameVYANKATI CHINNAVISHRWAPAPA SAMAKOTI
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2024First promiseDec 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2024
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2025)
  • Buildings3 building records
  • Documents filed70 files

Current status

65%203 of 311 units booked
88.0%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VAISHNAVI ARCADE BUILDING NO 1NA87115109224
VAISHNAVI ARCADE BUILDING NO 2NA8770070
VAISHNAVI ARCADE BUILDING NO 3NA2201717

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 95%.

VAISHNAVI ARCADE BUILDING NO 182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
VAISHNAVI ARCADE BUILDING NO 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
VAISHNAVI ARCADE BUILDING NO 382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes20%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed254

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots254
Closed/Covered69
Open Space185
BuildingClosed/CoveredOpen SpaceTotal
VAISHNAVI ARCADE BUILDING NO 168185253
VAISHNAVI ARCADE BUILDING NO 2101

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,791 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Dec 2025

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI9717.39
Proposed, not sanctioned9,717 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR, SHREE SIDDHI MANORA, AGASHI ROAD, VIRAR WEST
Estimated costRs 12.26 cr
Cost incurredRs 10.79 cr
Work done88.0%
BuildingWingEstimatedIncurred
VAISHNAVI ARCADE BUILDING NO 1NARs 12.01 crRs 10.57 cr
-NARs 25.00 lakhRs 22.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRITHVI ARCH CONSULTANTS
EngineerVIJAY GURAV AND ASSOCIATES
Chartered AccountantMISHRA AND MAYEKAR AND CO
Chartered AccountantDOLLY MILAN ASHAR
PartnerRole in project
MJV CORPORATION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17122518716Dec 2025 → Jun 2027

Reason as filed by the promoterDelay caused due to receipt of Revised Development Plan by Planning Authority. Applicability of RDP required revision of layout, architectural plans and re-validation of approvals, resulting in procedural delay.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Final (1).pdf13 Aug 2026
Withdrawal Update Form 1File: form 1 30 6 26.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2 Final (1).pdf13 Aug 2026
Withdrawal Update Form 2File: FORM 2 FINAL 30-06-2026 new.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3 Final (1).pdf13 Aug 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf13 Aug 2026
Withdrawal Update Form 1File: form 1 30 6 26.pdf12 Aug 2026
Withdrawal Update Form 2File: FORM 2 FINAL 30-06-2026.pdf12 Aug 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf12 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 2024_merged (1)-1.pdf4 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A 2025_merged (1)-2.pdf4 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A 2026_merged (1)-3.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1 Final.pdf1 Aug 2026
Withdrawal Update Form 2File: FORM 2 FINAL 30-06-2026.pdf1 Aug 2026
Withdrawal Update Form 3File: Form 3 Final 30 6 26.pdf1 Aug 2026
Withdrawal Update Form 1File: Form 1 Final.pdf30 Jul 2026
Withdrawal Update Form 1File: Form 1 Final.pdf30 Jul 2026
Withdrawal Update Form 2File: Form 2 Final.pdf30 Jul 2026
Withdrawal Update Form 2File: FORM 2 FINAL 30-06-2026.pdf30 Jul 2026
Withdrawal Update Form 3File: Form 3 Final.pdf30 Jul 2026
Withdrawal Update Form 3File: Form 3 Final 30 6 26.pdf30 Jul 2026
Withdrawal Update Form 1File: Architect Certificate.pdf4 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate signed.pdf4 Apr 2026
Withdrawal Update Form 3File: form 3 signed.pdf4 Apr 2026
Withdrawal Update Form 1File: form 1 30 9 25.pdf17 Dec 2025
Withdrawal Update Form 2File: form 2 30 9 25.pdf17 Dec 2025
Withdrawal Update Form 3File: form 3 30 9 25.pdf17 Dec 2025
Form 5 (FY 2023-2024)File: Mishra Mayekar MJV corporation 23 24.pdf17 Dec 2025
Form 5 (FY 2024-2025)File: Mishra Mayekar Annual Report 24 25.pdf17 Dec 2025
Withdrawal Update Form 1File: Architectu0027s certificate 30-06-2025.pdf31 Jul 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate (1).pdf31 Jul 2025
Withdrawal Update Form 3File: Form 3_Table C_MJV_merged 30 6 25.pdf31 Jul 2025
Other - LegalFile: Partnership Deed_11zon.pdf26 Jan 2024
Other - LegalFile: Retirement cum addmission deed_11zon.pdf26 Jan 2024
Copy of the legal title reportFile: LegalTitalReport latest (1) new_compressed.pdf25 Jan 2024
Other - LegalFile: dissulation deed compress.pdf25 Jan 2024
Other - TechnicalFile: CLARIFICATION LETTER FOR SHOP.pdf25 Jan 2024
PAN CardFile: pan card new.pdf6 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 (1) new (1) compress.pdf5 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPRATE BANK NEW.pdf5 Jan 2024
Other - LegalFile: conveyance deed compress.pdf16 Dec 2023
Layout approvalFile: layout plan new.pdf15 Dec 2023
Building plan approvalFile: blue print building no 1.pdf15 Dec 2023
Building plan approvalFile: MYSCAN_20231209_0004.pdf15 Dec 2023
Building plan approvalFile: MYSCAN_20231209_0005.pdf15 Dec 2023
Building plan approvalFile: MYSCAN_20231209_0003.pdf15 Dec 2023
Copy of Layout Approval (in case of layout)File: layout plan new.pdf15 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: blue print building no 1.pdf15 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20231209_0004.pdf15 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20231209_0005.pdf15 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20231209_0003.pdf15 Dec 2023
Other - TechnicalFile: CC EMAIL RERA MJV.pdf15 Dec 2023
PAN CardFile: Pan card Vyankati.pdf6 Dec 2023
Details of encumbrances concerned to FinanceFile: EncumbrancesConcernedtoFinance NEW.pdf6 Dec 2023
Details of encumbrances concerned to FinanceFile: EncumbrancesConcernedtolegal NEW.pdf6 Dec 2023
Details of encumbrances concerned to LegalFile: EncumbrancesConcernedtoFinance NEW.pdf6 Dec 2023
Details of encumbrances concerned to LegalFile: EncumbrancesConcernedtolegal NEW.pdf6 Dec 2023
Declaration about Commencement CertificateFile: DECLARATION ABT CC NEW.pdf6 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 (1) COMPRESS.pdf6 Dec 2023
Proforma of Allotment letterFile: model allotment letter new.pdf6 Dec 2023
Deviation Report with respect to Allotment letterFile: DeviationReportforAllotmentLetter NEW.pdf6 Dec 2023
Deviation Report with respect to model copy of AgreementFile: DeviationReportforAgreementSale NEW.pdf6 Dec 2023
Proforma of Agreement for saleFile: MODEL AGREEMENT AS PER RERA.pdf5 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Development Permission compress.pdf4 Dec 2023
Declaration in FORM BFile: Form B.pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate (1).pdf4 Dec 2023
CERSAI detailsFile: CERSAI_Search_Report_200289035257_For_Asset_Based_Search_04_12_2023_16_59_47_537.pdf4 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISC OF INTEREST.pdf4 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPRATE BANK.pdf4 Dec 2023

How this compares with Palghar

65%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 18 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MJV CORPORATION on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR EAST3,200+ in Palghar

2 kmMJV CORPORATIONCompleted 29Lapsed / revoked 22Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: VYANKATI CHINNAVISHRWAPAPA SAMAKOTI

VYANKATI CHINNAVISHRWAPAPA SAMAKOTI has 1 registration on MahaRERA, including MJV CORPORATION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if MJV CORPORATION is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MJV CORPORATION?

The registered promoter entity is VYANKATI CHINNAVISHRWAPAPA SAMAKOTI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MJV CORPORATION?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MJV CORPORATION?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MJV CORPORATION?

The professionals named in the filing: Architect: PRITHVI ARCH CONSULTANTS; Engineer: VIJAY GURAV AND ASSOCIATES; Chartered Accountant: MISHRA AND MAYEKAR AND CO; Chartered Accountant: DOLLY MILAN ASHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MJV CORPORATION?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MJV CORPORATION. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MJV CORPORATION to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.