Registered No litigation declared Residential / Group Housing project

SUNSHINE TOWER PHASE - I

By S. SIDDHARTH CONSTRUCTION CO

RG-MH-98375 · RERA P51800007504 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
13 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 30%
10 of 160Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 177 documents Report an error

SUNSHINE TOWER PHASE - I is a Residential / Group Housing project by S. SIDDHARTH CONSTRUCTION CO in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007504 on 17 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 150 of the 160 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameSUNSHINE TOWER PHASE - I
  • TypeResidential / Group Housing
  • Location
    • P K ROAD
    • ASHA NAGAR
    • MULUND WEST
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007504
  • ReraGenie IDRG-MH-98375

Builder

  • NameS. SIDDHARTH CONSTRUCTION CO
  • Entity typePartnership
  • PartnersSANTOSH DIGAMBAR MITHBHAVKAR, DILIP TALAKSHI VORA, DEEPAK MULCHAND GOSAR, PIYUSH HARISH GOSAR

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
  • Buildings2 building records
  • Documents filed177 files

Current status

94%150 of 160 units booked
82.6%Work done, per cost certificate

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUNSHINE TOWER PHASE - I A WINGNA25211200120
SUNSHINE TOWER PHASE - I B WINGNA252140040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 30%.

SUNSHINE TOWER PHASE - I A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUNSHINE TOWER PHASE - I B WING34%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor12%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Closed/Covered100
BuildingClosed/CoveredTotal
SUNSHINE TOWER PHASE - I A WING5050
SUNSHINE TOWER PHASE - I B WING5050

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,099 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority (SRA)
Permissible FSI11660.7
Proposed, not sanctioned10,163 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOLE BANGLOW NETAJI SUBHASH ROAD MULUND WEST MUMBAI 400080
Estimated costRs 41.58 cr
Cost incurredRs 34.36 cr
Work done82.63%
BuildingWingEstimatedIncurred
SUNSHINE TOWER PHASE - I A WINGNARs 25.73 crRs 24.48 cr
SUNSHINE TOWER PHASE - I B WINGNARs 12.66 crRs 7.17 cr
-NARs 3.19 crRs 2.71 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectACE Consaltants Satish Hande
EngineerAdvance Creative Design Consultancy Rajendra Paranjpe
Chartered AccountantHimmat Damji Shethia
Chartered AccountantMalay Nitin Furia
PartnerRole in project
S. SIDDHARTH CONSTRUCTION CO-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025745Dec 2024 → Dec 2026

Reason as filed by the promoterThis project consist of total 2 buildings. Out of which Wing A is completed in full and construction status of Wing B, RCC work is completed up-to 30% as is evidenced by the latest Form 1 that is Architect Certificate dated 10th October, 2024 submitted up-to the period of latest quarter ended 30th September, 2024 is attached. A declaration for the justification for the extension of the requested project giving reason why the project has been delayed along-with the schedule of table for the completion of the balance work within the stipulated time for which extension is requested is attached. I

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000056895VIJAY DOSHIS Siddharth Construction Co25/12/2018
CC006000000089867Asha SainaniS. Siddharth Construction Co26/06/2019
CC006000000090101Mr. Hitesh Ganatra & Mrs. Jayshree GanatraS.Siddhart Construction Co.13/07/2019
CC006000000090069Kishor Ganatra & Sharad K. GanatraS. Siddharth Construction Co.13/07/2019
CC006000000090067Mr. Piyush Mukesh GogariaS. Siddharth Construction Co.13/07/2019
CC006000000090065Mr. Vishal K. GanatraM/s. S. Siddharth Construction Co.13/07/2019
CC006000000090073Mr. Yogesh MotiwalaS. Siddharth Construction Co.13/07/2019
CC006000000251432ASHWIN DUNGARSHI DEDHIAS. SIDDHARTH CONSTRUCTION11/06/2022
CC006000000480208Vijay Channalal DoshiS. Siddhrath Construction Co.26/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed177

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Scan_Sunshine Tower Jan To Mar 2026.pdf25 Jun 2026
Withdrawal Update Form 2File: Scan Form 2_31-03-26.pdf25 Jun 2026
Withdrawal Update Form 3File: Scan Form 3_31-03-26_compressed.pdf25 Jun 2026
Withdrawal Update Form 1File: Scan_Sunshine_Tower_April_To_June_2025.pdf6 Mar 2026
Withdrawal Update Form 1File: Scan_Sunshine Tower July To Sep 2025.pdf6 Mar 2026
Withdrawal Update Form 1File: Scan_Sunshine Tower Oct To Dec 2025.pdf6 Mar 2026
Withdrawal Update Form 2File: Scan Form -2_30-06-2025.pdf6 Mar 2026
Withdrawal Update Form 2File: Scan Form -2_30-09-2025.pdf6 Mar 2026
Withdrawal Update Form 2File: Scan Form -2_31-12-2025.pdf6 Mar 2026
Withdrawal Update Form 3File: Scan_Form 3_30-06-2025_compressed.pdf6 Mar 2026
Withdrawal Update Form 3File: Scan_Form 3_30-09-2025_compressed.pdf6 Mar 2026
Withdrawal Update Form 3File: Sunshine_Form 3_31-12-2025_compressed.pdf6 Mar 2026
Form 1File: Form 1_31-12-24_Sunshine.pdf21 Feb 2026
Form 2File: Form 2_31-12-24_Sunshine.pdf21 Feb 2026
Form 3File: Scan_Form 3 -31-12-2024_compressed.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Scan Disclosure SSC_31-12-2024.pdf21 Feb 2026
Form 1File: Scan_Form 1 SSID _30-09-2024.pdf21 Feb 2026
Form 2File: Scan_Form 2_30-09-2024.pdf21 Feb 2026
Form 3File: Form 3 Sunshine_30-09-2024_compressed.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Scan_Disclosure SSC_30-09-2024_compressed.pdf21 Feb 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-12-24_Sunshine.pdf6 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-03-25_Sunshine.pdf6 May 2025
Certificates of CA (Form 3)File: Scan_Form 3 -31-12-2024_compressed.pdf5 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_31-12-24_Sunshine.pdf19 Mar 2025
Disclosure of sold/ booked inventoryFile: Scan Disclosure SSC_31-12-2024.pdf6 Feb 2025
Declaration in FORM BFile: Declaratation_Form B- Promoter_31-12-2026_compressed.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_31-12-2023.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_30-09-2024.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_30-06-2024.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_31-03-2024.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_30-09-2023.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_30-06-2023.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_31-03-2023.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Scan_Disclosure SSC_30-09-2024_compressed.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Scan_Form 2A_SSC_FY 2023-2024.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Scan_Form 5_2022-2023.pdf21 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Scan_Form 5_2023-2024.pdf21 Dec 2024
Certificates of CA (Form 3)File: Form 3 Sunshine _31-03-2024_compressed.pdf10 Dec 2024
Certificates of CA (Form 3)File: Form 3 Sunshine_30-06-2024_compressed.pdf10 Dec 2024
Certificates of CA (Form 3)File: Form 3 Sunshine_30-09-2024_compressed.pdf10 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan_Form 1 SSID _30-09-2024.pdf9 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Sunshine_30-06-2024.pdf31 Jul 2024
Certificates of CA (Form 3)File: Form 3_31-03-23_Sunshine_compressed.pdf4 Jun 2024
Certificates of CA (Form 3)File: Form 3_30-06-23_Sunshine_compressed.pdf4 Jun 2024
Certificates of CA (Form 3)File: Form 3_30-09-23_Sunshine_compressed.pdf4 Jun 2024
Certificates of CA (Form 3)File: Form 3_31-12-23_Sunshine_compressed.pdf4 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-03-23_Sunshine.pdf1 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30-06-23_Sunshine.pdf1 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30-09-23_Sunshine.pdf1 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30-09-23_Sunshine.pdf1 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-12-23_Sunshine.pdf1 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-03-24_Sunshine.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form -2A_Sunshine_31-03-2023.PDF24 Jun 2023
Details of encumbrances concerned to FinanceFile: No-encumbrance concerned to Legal_SSID.pdf15 Jun 2023
Details of encumbrances concerned to LegalFile: No-encumbrance concerned to Legal_SSID.pdf15 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Real Estate Org_SSID.PDF15 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Sunshine_Declaration for separate bank account.pdf15 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_31-12-2021.PDF14 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_31-03-2022.PDF14 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_30-06-2022.PDF14 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_30-09-2022_Sunshine.pdf14 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_31-12-2022_Sunshine.PDF14 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_31-03-2021_Sunshine.PDF13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_30-06-2021_Sunshine.PDF13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_30-09-2021_Sunshine.PDF13 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Scan_Form 5_2020-2021.PDF24 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Scan_Form 5_2021-2022.PDF24 Feb 2023
Certificates of CA (Form 3)File: Form 3_31-03-2021.PDF22 Feb 2023
Certificates of CA (Form 3)File: Form 3_30-06-2021.PDF22 Feb 2023
Certificates of CA (Form 3)File: Form 3_30-09-2021.PDF22 Feb 2023
Certificates of CA (Form 3)File: Form 3_31-12-2021.PDF22 Feb 2023
Certificates of CA (Form 3)File: Form 3_31-03-2022.PDF22 Feb 2023
Certificates of CA (Form 3)File: Form 3_30-06-2022.PDF22 Feb 2023
Certificates of CA (Form 3)File: Form 3_30-09-2022.PDF22 Feb 2023
Certificates of CA (Form 3)File: Form 3_31-12-2022.PDF22 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SSC_Form 2A - Quality Assurance Certificate_31-03-2022.PDF20 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_31-03-2018.PDF19 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_30-06-2018.PDF19 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_30-09-2018.PDF19 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_31-12-2018.PDF19 Jan 2023

How this compares with Mumbai Suburban

94%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUNSHINE TOWER PHASE - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

2 kmSUNSHINE TOWER PHASE - ICompleted 100Lapsed / revoked 71Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 311 registered projects within 2 km.

Builder: S. SIDDHARTH CONSTRUCTION CO

S. SIDDHARTH CONSTRUCTION CO has 1 registration on MahaRERA, including SUNSHINE TOWER PHASE - I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SUNSHINE TOWER PHASE - I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUNSHINE TOWER PHASE - I?

The registered promoter entity is S. SIDDHARTH CONSTRUCTION CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUNSHINE TOWER PHASE - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SUNSHINE TOWER PHASE - I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SUNSHINE TOWER PHASE - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUNSHINE TOWER PHASE - I?

The professionals named in the filing: Architect: ACE Consaltants Satish Hande; Engineer: Advance Creative Design Consultancy Rajendra Paranjpe; Chartered Accountant: Himmat Damji Shethia; Chartered Accountant: Malay Nitin Furia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNSHINE TOWER PHASE - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNSHINE TOWER PHASE - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNSHINE TOWER PHASE - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.