Home / Browse projects / Mumbai Suburban, Maharashtra / SUNSHINE TOWER PHASE - I
SUNSHINE TOWER PHASE - I
By S. SIDDHARTH CONSTRUCTION CO
RG-MH-98375 · RERA P51800007504 · Last updated on MahaRERA portal: 25 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 9 complaints at MahaRERA
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUNSHINE TOWER PHASE - I is a Residential / Group Housing project by S. SIDDHARTH CONSTRUCTION CO in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007504 on 17 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 150 of the 160 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete. 9 complaints are on record with the regulator.
At a glance
Project
- NameSUNSHINE TOWER PHASE - I
- TypeResidential / Group Housing
- Location
- P K ROAD
- ASHA NAGAR
- MULUND WEST
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800007504
- ReraGenie IDRG-MH-98375
Builder
- NameS. SIDDHARTH CONSTRUCTION CO
- Entity typePartnership
- PartnersSANTOSH DIGAMBAR MITHBHAVKAR, DILIP TALAKSHI VORA, DEEPAK MULCHAND GOSAR, PIYUSH HARISH GOSAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
- Buildings2 building records
- Documents filed177 files
Current status
Figures as on 25 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUNSHINE TOWER PHASE - I A WING | NA | 25 | 21 | 120 | 0 | 120 |
| SUNSHINE TOWER PHASE - I B WING | NA | 25 | 21 | 40 | 0 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 30%.
SUNSHINE TOWER PHASE - I A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SUNSHINE TOWER PHASE - I B WING34%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 12% |
| Slabs of Super Structure | 30% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed100
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| SUNSHINE TOWER PHASE - I A WING | 50 | 50 |
| SUNSHINE TOWER PHASE - I B WING | 50 | 50 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SUNSHINE TOWER PHASE - I A WING | NA | Rs 25.73 cr | Rs 24.48 cr |
| SUNSHINE TOWER PHASE - I B WING | NA | Rs 12.66 cr | Rs 7.17 cr |
| - | NA | Rs 3.19 cr | Rs 2.71 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ACE Consaltants Satish Hande |
| Engineer | Advance Creative Design Consultancy Rajendra Paranjpe |
| Chartered Accountant | Himmat Damji Shethia |
| Chartered Accountant | Malay Nitin Furia |
| Partner | Role in project |
|---|---|
| S. SIDDHARTH CONSTRUCTION CO | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThis project consist of total 2 buildings. Out of which Wing A is completed in full and construction status of Wing B, RCC work is completed up-to 30% as is evidenced by the latest Form 1 that is Architect Certificate dated 10th October, 2024 submitted up-to the period of latest quarter ended 30th September, 2024 is attached. A declaration for the justification for the extension of the requested project giving reason why the project has been delayed along-with the schedule of table for the completion of the balance work within the stipulated time for which extension is requested is attached. I
Complaints filed with MahaRERA9
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000056895 | VIJAY DOSHI | S Siddharth Construction Co | 25/12/2018 |
| CC006000000089867 | Asha Sainani | S. Siddharth Construction Co | 26/06/2019 |
| CC006000000090101 | Mr. Hitesh Ganatra & Mrs. Jayshree Ganatra | S.Siddhart Construction Co. | 13/07/2019 |
| CC006000000090069 | Kishor Ganatra & Sharad K. Ganatra | S. Siddharth Construction Co. | 13/07/2019 |
| CC006000000090067 | Mr. Piyush Mukesh Gogaria | S. Siddharth Construction Co. | 13/07/2019 |
| CC006000000090065 | Mr. Vishal K. Ganatra | M/s. S. Siddharth Construction Co. | 13/07/2019 |
| CC006000000090073 | Mr. Yogesh Motiwala | S. Siddharth Construction Co. | 13/07/2019 |
| CC006000000251432 | ASHWIN DUNGARSHI DEDHIA | S. SIDDHARTH CONSTRUCTION | 11/06/2022 |
| CC006000000480208 | Vijay Channalal Doshi | S. Siddhrath Construction Co. | 26/04/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed177
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Scan_Sunshine Tower Jan To Mar 2026.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Scan Form 2_31-03-26.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: Scan Form 3_31-03-26_compressed.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: Scan_Sunshine_Tower_April_To_June_2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 1File: Scan_Sunshine Tower July To Sep 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 1File: Scan_Sunshine Tower Oct To Dec 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: Scan Form -2_30-06-2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: Scan Form -2_30-09-2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: Scan Form -2_31-12-2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: Scan_Form 3_30-06-2025_compressed.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: Scan_Form 3_30-09-2025_compressed.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: Sunshine_Form 3_31-12-2025_compressed.pdf | 6 Mar 2026 |
| Form 1File: Form 1_31-12-24_Sunshine.pdf | 21 Feb 2026 |
| Form 2File: Form 2_31-12-24_Sunshine.pdf | 21 Feb 2026 |
| Form 3File: Scan_Form 3 -31-12-2024_compressed.pdf | 21 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan Disclosure SSC_31-12-2024.pdf | 21 Feb 2026 |
| Form 1File: Scan_Form 1 SSID _30-09-2024.pdf | 21 Feb 2026 |
| Form 2File: Scan_Form 2_30-09-2024.pdf | 21 Feb 2026 |
| Form 3File: Form 3 Sunshine_30-09-2024_compressed.pdf | 21 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Scan_Disclosure SSC_30-09-2024_compressed.pdf | 21 Feb 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-12-24_Sunshine.pdf | 6 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-03-25_Sunshine.pdf | 6 May 2025 |
| Certificates of CA (Form 3)File: Scan_Form 3 -31-12-2024_compressed.pdf | 5 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_31-12-24_Sunshine.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Scan Disclosure SSC_31-12-2024.pdf | 6 Feb 2025 |
| Declaration in FORM BFile: Declaratation_Form B- Promoter_31-12-2026_compressed.pdf | 22 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_31-12-2023.pdf | 22 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_30-09-2024.pdf | 22 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_30-06-2024.pdf | 22 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_31-03-2024.pdf | 22 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_30-09-2023.pdf | 22 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_30-06-2023.pdf | 22 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form 2_SSC_31-03-2023.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Scan_Disclosure SSC_30-09-2024_compressed.pdf | 22 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Scan_Form 2A_SSC_FY 2023-2024.pdf | 22 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Scan_Form 5_2022-2023.pdf | 21 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Scan_Form 5_2023-2024.pdf | 21 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 Sunshine _31-03-2024_compressed.pdf | 10 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 Sunshine_30-06-2024_compressed.pdf | 10 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3 Sunshine_30-09-2024_compressed.pdf | 10 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan_Form 1 SSID _30-09-2024.pdf | 9 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Sunshine_30-06-2024.pdf | 31 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3_31-03-23_Sunshine_compressed.pdf | 4 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3_30-06-23_Sunshine_compressed.pdf | 4 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3_30-09-23_Sunshine_compressed.pdf | 4 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3_31-12-23_Sunshine_compressed.pdf | 4 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-03-23_Sunshine.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30-06-23_Sunshine.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30-09-23_Sunshine.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_30-09-23_Sunshine.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-12-23_Sunshine.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_31-03-24_Sunshine.pdf | 1 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form -2A_Sunshine_31-03-2023.PDF | 24 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: No-encumbrance concerned to Legal_SSID.pdf | 15 Jun 2023 |
| Details of encumbrances concerned to LegalFile: No-encumbrance concerned to Legal_SSID.pdf | 15 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Real Estate Org_SSID.PDF | 15 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Sunshine_Declaration for separate bank account.pdf | 15 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_31-12-2021.PDF | 14 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_31-03-2022.PDF | 14 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_30-06-2022.PDF | 14 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_30-09-2022_Sunshine.pdf | 14 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_31-12-2022_Sunshine.PDF | 14 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_31-03-2021_Sunshine.PDF | 13 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_30-06-2021_Sunshine.PDF | 13 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scan_Form-2_30-09-2021_Sunshine.PDF | 13 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Scan_Form 5_2020-2021.PDF | 24 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Scan_Form 5_2021-2022.PDF | 24 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3_31-03-2021.PDF | 22 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3_30-06-2021.PDF | 22 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3_30-09-2021.PDF | 22 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3_31-12-2021.PDF | 22 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3_31-03-2022.PDF | 22 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3_30-06-2022.PDF | 22 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3_30-09-2022.PDF | 22 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3_31-12-2022.PDF | 22 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SSC_Form 2A - Quality Assurance Certificate_31-03-2022.PDF | 20 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_31-03-2018.PDF | 19 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_30-06-2018.PDF | 19 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_30-09-2018.PDF | 19 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_31-12-2018.PDF | 19 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 177 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUNSHINE TOWER PHASE - I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MULUND WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 311 registered projects within 2 km.
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: S. SIDDHARTH CONSTRUCTION CO
S. SIDDHARTH CONSTRUCTION CO has 1 registration on MahaRERA, including SUNSHINE TOWER PHASE - I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SUNSHINE TOWER PHASE - I is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUNSHINE TOWER PHASE - I?
The registered promoter entity is S. SIDDHARTH CONSTRUCTION CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUNSHINE TOWER PHASE - I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SUNSHINE TOWER PHASE - I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SUNSHINE TOWER PHASE - I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUNSHINE TOWER PHASE - I?
The professionals named in the filing: Architect: ACE Consaltants Satish Hande; Engineer: Advance Creative Design Consultancy Rajendra Paranjpe; Chartered Accountant: Himmat Damji Shethia; Chartered Accountant: Malay Nitin Furia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUNSHINE TOWER PHASE - I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback