ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Sunrise Parkview Phase II

Registered No litigation declared Residential / Group Housing project

Sunrise Parkview Phase II

By Sukham Corporation Proprietor Sunrise Lifespaces LLP

RG-MH-69780 · RERA P51700045660 · Last updated on MahaRERA portal: 20 Jun 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
3 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Sunrise Parkview Phase II is a Residential / Group Housing project by Sukham Corporation Proprietor Sunrise Lifespaces LLP in Thane, Maharashtra, registered with MahaRERA as P51700045660 on 26 May 2022. Possession is promised by 31 Dec 2029. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSunrise Parkview Phase II
  • TypeResidential / Group Housing
  • Location
    • Shil Kalyan Road
    • Padle Village
    • Thane (M Corp.)
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700045660
  • ReraGenie IDRG-MH-69780

Builder

  • NameSukham Corporation Proprietor Sunrise Lifespaces LLP
  • Entity typePartnership
  • PartnersBal Chand Jain, Rajendra Baid, Chandanmal Baid, Abhinav Baid
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2022PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 May 2022
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sunrise Parkview C WingNA160000
Sunrise Parkview D WingNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Sunrise Parkview C Wing27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sunrise Parkview D Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed114

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots114
Closed/Covered114
BuildingClosed/CoveredTotal
Sunrise Parkview C Wing4444
Sunrise Parkview D Wing7070

Land and ownership21

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,260 sq m
Land owned byThe promoter, with other names on the file
Named landowners21
LandownerVillageDistrict
Aruna Krishna Mhatre-Mumbai City
ASHA CHANDRAKANT THAKUR-Mumbai City
ASHOK DASHRATH PATIL-Mumbai City
BAI ANNANTH YENDARKAR-Mumbai City
BARIKIBAI KANHA MHATRE-Mumbai City
BAYAMA NARESH PATIL-Mumbai City
JITESH KANHA PATIL-Mumbai City
KANHA SHAMU PATIL-Mumbai City
KARUNA RUPESH BUNDE-Mumbai City
LAKSHMI KESAV PATIL-Mumbai City
MEENAKSHI KANHA PATIL-Mumbai City
NARESH PANDURANG PATIL-Mumbai City
NAVNATH KESHAV PATIL-Mumbai City
NITESH KANHA PATIL-Mumbai City
PREMNATH KESAV PATIL-Mumbai City
RUPALI NARESH PATIL-Mumbai City
RUPESH NARESH PATIL-Mumbai City
SHWETA GANESH PATIL-Mumbai City
YOGESH NARESH PATIL-Mumbai City
USHA MANGESH PATIL-Mumbai City
MATHURA GANESH PATIL-Mumbai City

Approvals and building plan

Permissible FSI15740.06
Proposed, not sanctioned6,352 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr Floor and 1st Floor, Regal Mansion, Mumbai 400004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER S LOTKE & ASSOCIATES
EngineerSV PATEL AND ASSOCIATES
Chartered AccountantBhalawat & Company
Chartered AccountantPrakash Jhunjhunwala & Co LLP
PartnerRole in project
Sukham Corporation Proprietor Sunrise Lifespaces LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501925Sukham Corporation Prorietor Sunrise Lifespace LLPShailesh Shankar Govalkar12/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Mar 2024

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Q4.pdf20 Jun 2025
Form 2File: Form 2 Q4 2024-25.pdf20 Jun 2025
Form 3File: FORM 3 Q4 FY 2024- 25_compressed.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory.pdf20 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 FY 2024- 25.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 2024-25.pdf27 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 FY 2023-24 FINAL.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 FY 2024-25 FINAL.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 FY 2024- 25 FINAL.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 -Q3 2023-24 SUKHAM.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Q4 2023-24 SUKHAM.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Q1 2024-25 SUKHAM.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Q2 2024-25 SUKHAM.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Q1.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Q3.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate D Building Full.pdf27 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SUKHAM OC C WING.pdf27 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf30 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2.pdf28 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1.pdf22 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf22 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 FY 22-23.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 FY 22-23.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 FY 22-23.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 FY 22-23.pdf2 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1_.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3_compressed.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03 Q4_.pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf17 Nov 2023
Building plan approvalFile: Scan-0069.pdf28 Apr 2023
Building plan approvalFile: Scan-0070.pdf28 Apr 2023
Building plan approvalFile: Scan-0071.pdf28 Apr 2023
Building plan approvalFile: Scan-0072.pdf28 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan-0069.pdf28 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan-0070.pdf28 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan-0071.pdf28 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan-0072.pdf28 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate- D Wing.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sunrise Parkview - Phase II - Form 1.pdf9 Aug 2022
Building plan approvalFile: NA Order.pdf21 May 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf21 May 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 May 2022
Copy of the legal title reportFile: Legal Title Certificate.pdf20 May 2022
Copy of the legal title reportFile: Legal Title Certificate.pdf20 May 2022
Copy of the legal title reportFile: Legal Title Certificate.pdf20 May 2022
CERSAI detailsFile: undertaking cum declaration - CERSAI.pdf20 May 2022
Declaration about Commencement CertificateFile: CC DECLARATION.pdf16 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf5 May 2022
Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf5 May 2022
PAN CardFile: SUNRISE LIFESPACES LLP (FORMERLY GLORYLIGHT CONSTRUCTIONSS LLP).pdf2 May 2022
Building plan approvalFile: BUILDING D.pdf29 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING D.pdf29 Apr 2022
Proforma of Allotment letterFile: Proforma Agreement for Sale - C Wing.pdf18 Apr 2022
Layout approvalFile: 1 OF 9.pdf8 Apr 2022
Building plan approvalFile: 2 OF 9.pdf8 Apr 2022
Building plan approvalFile: 7 OF 9.pdf8 Apr 2022
Building plan approvalFile: 8 OF 9.pdf8 Apr 2022
Building plan approvalFile: 9 OF 9.pdf8 Apr 2022
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf8 Apr 2022
Copy of Layout Approval (in case of layout)File: 1 OF 9.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 2 OF 9.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 7 OF 9.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 8 OF 9.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 9 OF 9.pdf8 Apr 2022
Declaration in FORM BFile: Form B.pdf8 Apr 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUNRISE GLORY PHASE IKALYAN SHIL PHATA ROAD VILLAGE SHIL124CompletedJun 2018Feb 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunrise Parkview Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Padle Village7,600+ in Thane

2 kmSunrise Parkview Phase ICompleted 44Lapsed / revoked 15Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 108 registered projects within 2 km.

Builder: Sukham Corporation Proprietor Sunrise Lifespaces LLP

Sukham Corporation Proprietor Sunrise Lifespaces LLP has 2 registrations on MahaRERA, including Sunrise Parkview Phase I and Sunrise Parkview Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sunrise Parkview Phase II is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunrise Parkview Phase II?

The registered promoter entity is Sukham Corporation Proprietor Sunrise Lifespaces LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunrise Parkview Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sunrise Parkview Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sunrise Parkview Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunrise Parkview Phase II?

The professionals named in the filing: Architect: SAMEER S LOTKE & ASSOCIATES; Engineer: SV PATEL AND ASSOCIATES; Chartered Accountant: Bhalawat & Company; Chartered Accountant: Prakash Jhunjhunwala & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunrise Parkview Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunrise Parkview Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunrise Parkview Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.