Home / Browse projects / Thane, Maharashtra / Sunrise Parkview Phase I
Sunrise Parkview Phase I
By Sukham Corporation Proprietor Sunrise Lifespaces LLP
RG-MH-02997 · RERA P51700021145 · Last updated on MahaRERA portal: 17 May 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sunrise Parkview Phase I is a Residential / Group Housing project by Sukham Corporation Proprietor Sunrise Lifespaces LLP in Thane, Maharashtra, registered with MahaRERA as P51700021145 on 10 Jun 2019. The registration is recorded completed; possession was promised by 30 Dec 2025.
At a glance
Project
- NameSunrise Parkview Phase I
- TypeResidential / Group Housing
- Location
- Shil Kalyan Road
- Padle Village
- Thane (M Corp.)
- Thane
- 421201
- Pincode421201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700021145
- ReraGenie IDRG-MH-02997
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Jun 2019
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sunrise Parkview A Wing | NA | 18 | 0 | 0 | 0 | 0 |
| Sunrise Parkview B Wing | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
Sunrise Parkview A Wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Sunrise Parkview B Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed71
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Sunrise Parkview A Wing | 23 | 23 |
| Sunrise Parkview B Wing | 48 | 48 |
Land and ownership20
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Asha Chandrakant Thakur | Mumbai City | Mumbai City |
| Ashok Dashrath Patil | Mumbai City | Mumbai City |
| Bai Annanth Yendarkar | Mumbai City | Mumbai City |
| Barikibai Kanha Mhatre | Mumbai City | Mumbai City |
| Bayama Naresh Patil | Mumbai City | Mumbai City |
| Jitesh Kanha Patil | Mumbai City | Mumbai City |
| Kanha Shamu Patil | Mumbai City | Mumbai City |
| Karuna Rupesh Bunde | Mumbai City | Mumbai City |
| Lakshmi Kesav Patil | Mumbai City | Mumbai City |
| Madhura Ganesh Patil | Mumbai City | Mumbai City |
| Meenakshi Kanha Patil | Mumbai City | Mumbai City |
| Naresh Pandurang Patil | Mumbai City | Mumbai City |
| Navnath Keshav Patil | Mumbai City | Mumbai City |
| Nitesh Kanha Patil | Mumbai City | Mumbai City |
| Premnath Kesav Patil | Mumbai City | Mumbai City |
| Rupali Naresh Patil | Mumbai City | Mumbai City |
| Rupesh Naresh Patil | Mumbai City | Mumbai City |
| Shweta Ganesh Patil | Mumbai City | Mumbai City |
| Yogesh Naresh Patil | Mumbai City | Mumbai City |
| Usha Mangesh Patil | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sameer S Lotke & Associates |
| Engineer | SV PATEL AND ASSOCIATES |
| Chartered Accountant | Arpit Chopra & Company |
| Partner | Role in project |
|---|---|
| Sukham Corporation Proprietor Sunrise Lifespaces LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Mar 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 May 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Mar 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Aug 2022
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf | 17 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf | 17 May 2025 |
| Certificates of CA (Form 3)File: Form 3 Q1 30062022_compressed.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 30062020.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 30092020.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 31122020 compreseed.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-30062020.pdf | 27 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-30092020.pdf | 27 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-31122020.pdf | 27 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Q1 30062020.pdf | 27 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Q2 30092020.pdf | 27 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Q3 31122020.pdf | 27 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 30062020 Revised.pdf | 27 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 30092020.pdf | 27 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 31122020.pdf | 27 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30 06 2021.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31 03 2022.pdf | 6 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf | 30 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4-RERA.pdf | 28 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3-RERA.pdf | 28 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2-RERA.pdf | 28 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1-RERA.pdf | 28 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Form 1.pdf | 21 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Form 1.pdf | 21 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Q1 RERA.pdf | 20 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Q2 RERA.pdf | 20 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Q3 RERA.pdf | 20 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Q4 RERA.pdf | 20 Mar 2023 |
| Certificates of CA (Form 3)File: FORM R-3 Q3 MERGED.pdf | 15 Mar 2023 |
| Certificates of CA (Form 3)File: FORM R-3 Q1 MERGED.pdf | 14 Mar 2023 |
| Certificates of CA (Form 3)File: FORM R-3 Q2 MERGED.pdf | 14 Mar 2023 |
| Certificates of CA (Form 3)File: FORM R-3 Q4 MERGED.pdf | 14 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21.pdf | 6 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 21-22.pdf | 6 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Oc certificate.pdf | 25 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sunrise Parkview - Phase I - Form 1.pdf | 9 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sukham Corporation - form5.pdf | 7 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - 31032020.pdf | 27 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1-31032021.pdf | 27 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 - 30092021.pdf | 27 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 31032020.pdf | 27 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 31032021.pdf | 27 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Sunrise Parkview Disclosure of sold Inventory.pdf | 27 Oct 2021 |
| Certificates of CA (Form 3)File: 3 Form - 3 31032020.pdf | 27 Oct 2021 |
| Certificates of CA (Form 3)File: 6 Form 3-31032021.pdf | 27 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - 31032020_compressed.pdf | 17 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - 2020-21_compressed.pdf | 17 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SP cert no 1.pdf | 20 Feb 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SP cert no 2.pdf | 20 Feb 2020 |
| Certificates of CA (Form 3)File: Form 3.pdf | 30 May 2019 |
| Layout approvalFile: MYSCAN_20190228_0002.pdf | 25 May 2019 |
| Layout approvalFile: MYSCAN_20190228_0003.pdf | 25 May 2019 |
| Layout approvalFile: MYSCAN_20190228_0004.pdf | 25 May 2019 |
| Layout approvalFile: MYSCAN_20190228_0005.pdf | 25 May 2019 |
| Layout approvalFile: MYSCAN_20190228_0006.pdf | 25 May 2019 |
| Layout approvalFile: MYSCAN_20190228_0007.pdf | 25 May 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190228_0002.pdf | 25 May 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190228_0003.pdf | 25 May 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190228_0004.pdf | 25 May 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190228_0005.pdf | 25 May 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190228_0006.pdf | 25 May 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190228_0007.pdf | 25 May 2019 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 24 May 2019 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf | 24 May 2019 |
| Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf | 28 Mar 2019 |
| Declaration in FORM BFile: FORM B.pdf | 28 Mar 2019 |
| Layout approvalFile: MYSCAN_20190228_0001.pdf | 26 Mar 2019 |
| Building plan approvalFile: CC.pdf | 26 Mar 2019 |
| PAN CardFile: Glorylight - Pan.PDF | 26 Mar 2019 |
| Copy of the legal title reportFile: Title Certificate.pdf | 26 Mar 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190228_0001.pdf | 26 Mar 2019 |
| Building Plan Approval (IOD)File: CC.pdf | 26 Mar 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 26 Mar 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SUNRISE GLORY PHASE I | KALYAN SHIL PHATA ROAD VILLAGE SHIL | 124 | Completed | Jun 2018 | Feb 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
Keep Sunrise Parkview Phase I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Padle Village7,600+ in Thane
Filed coordinates, straight-line distance. 394 registered projects within 2 km.
MY CITY PHASE II CLUSTER 5 PART II
HORIZON PROJECTS PVT LTD
MY CITY PHASE II CLUSTER 5 PART III
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 3 Bldg No 27-28
Runwal Residency Private Limited
Runwal Gardens Phase 4 Bldg No. 35-36
Runwal Residency Private Limited
VASTU LUXURIA
LAUKIK DEVELOPMENT CORPORATION
KAPLESHWARA RESIDENCY
KAPLESHWARA HOMES LLP
See every Thane project, with the district possession charts
Builder: Sukham Corporation Proprietor Sunrise Lifespaces LLP
Sukham Corporation Proprietor Sunrise Lifespaces LLP has 2 registrations on MahaRERA, including Sunrise Parkview Phase I and Sunrise Parkview Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Sunrise Parkview Phase I is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sunrise Parkview Phase I?
The registered promoter entity is Sukham Corporation Proprietor Sunrise Lifespaces LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sunrise Parkview Phase I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sunrise Parkview Phase I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sunrise Parkview Phase I?
The professionals named in the filing: Architect: Sameer S Lotke & Associates; Engineer: SV PATEL AND ASSOCIATES; Chartered Accountant: Arpit Chopra & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sunrise Parkview Phase I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback