Home / Browse projects / Raigarh, Maharashtra / SUNNY HOUSING

Registered No litigation declared Residential / Group Housing project

SUNNY HOUSING

By KIRAN DILIP CHAVAN

RG-MH-06613 · RERA P52000054618 · Last updated on MahaRERA portal: 17 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
39 of 59Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

SUNNY HOUSING is a Residential / Group Housing project by KIRAN DILIP CHAVAN in Raigarh, Maharashtra, registered with MahaRERA as P52000054618 on 2 Feb 2024. Possession is promised by 31 Dec 2026. 20 of the 59 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NameSUNNY HOUSING
  • TypeResidential / Group Housing
  • Location
    • Survey No. 63/5 and 105/1
    • Neral
    • Dhamote
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000054618
  • ReraGenie IDRG-MH-06613

Builder

  • NameKIRAN DILIP CHAVAN
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed66 files

Current status

34%20 of 59 units booked
94.0%Work done, per cost certificate

Figures as on 17 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUNNY NX A-WINGNA7728735
SUNNY NX B-WINGNA6624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

SUNNY NX A-WING78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
SUNNY NX B-WING78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Closed/Covered18
Open Space48
BuildingClosed/CoveredOpen SpaceTotal
SUNNY NX A-WING93039
SUNNY NX B-WING91827

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,005 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jun 2025

Approvals and building plan

Sanctioning authorityZILLA PARISHAD RAIGAD
Permissible FSI2264.71
Proposed, not sanctioned2,265 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPARSIK NAGAR, KALWA
Estimated costRs 5.50 cr
Cost incurredRs 5.17 cr
Work done93.99%
BuildingWingEstimatedIncurred
SUNNY NX A-WINGNARs 3.30 crRs 3.10 cr
SUNNY NX B-WINGNARs 2.20 crRs 2.07 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBRAHMAND ARCHITECT
EngineerBRAHMAND ARCHITECT
Chartered AccountantLAKADIA & CO
Chartered AccountantHuma Khan and Associates
PartnerRole in project
KIRAN DILIP CHAVAN-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1.pdf17 Mar 2026
Withdrawal Update Form 1File: FORM-1.pdf17 Mar 2026
Withdrawal Update Form 2File: FORM-2.pdf17 Mar 2026
Withdrawal Update Form 2File: FORM-2.pdf17 Mar 2026
Withdrawal Update Form 3File: Form 3_11zon.pdf17 Mar 2026
Withdrawal Update Form 3File: Form 3_11zon.pdf17 Mar 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 as on September 2025.pdf5 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 as on September 2025.pdf5 Feb 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 as on September 2025.pdf5 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 as on June 2025.pdf8 Dec 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 as on June 2025.pdf8 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 as on June 2025.pdf8 Dec 2025
Form 1File: FORM-1 (ARCHITECT) 30-09-2024.pdf12 Jun 2025
Form 2File: FORM-2 (ENGINEER) 30-09-2024.pdf12 Jun 2025
Form 3File: Form 3 -CA CERTIFICATE SEPT-24.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 30-09-2024.pdf12 Jun 2025
Form 1File: FORM-1 (ARCHITECT) 31-12-2024.pdf12 Jun 2025
Form 2File: FORM-2 (ENGINEER) 31-12-2024.pdf12 Jun 2025
Form 3File: Form 3 -CA CERTIFICATE DEC-24.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 31-12-2024.pdf12 Jun 2025
Form 1File: ARCHITECT CERTIFICATE FORM-1 31-03-2025.pdf12 Jun 2025
Form 2File: ENGINEERS CERTIFICATE FORM-2 31-03-2025.pdf12 Jun 2025
Form 3File: Form 3 -CA CERTIFICATE MAR-25.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 31-03-2025.pdf12 Jun 2025
Form 1File: FORM 1 Signed.pdf12 Jun 2025
Form 2File: FORM 2 Signed.pdf12 Jun 2025
Form 3File: Form 3 -CA CERTIFICATE.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 AS ON 31-03-2024.pdf12 Jun 2025
Form 1File: FORM 1 Signed.pdf12 Jun 2025
Form 2File: FORM 2 Signed.pdf12 Jun 2025
Form 3File: Form 3 -CA CERTIFICATE.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 AS ON 30-06-2024.pdf12 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Signed.pdf27 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -CA CERTIFICATE.pdf27 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Signed.pdf27 Oct 2024
Copy of the legal title reportFile: SEARCH AND TITILE REPORT 63-5 REC.pdf15 Jan 2024
Copy of the legal title reportFile: SEARCH AND TITLE 105-1 compressed.pdf15 Jan 2024
Other - LegalFile: PLOT 63-5 (PART-1).pdf21 Nov 2023
Other - LegalFile: PLOT 63-5 (PART-2).pdf21 Nov 2023
Other - LegalFile: PLOT 63-5 (PART-3).pdf21 Nov 2023
Other - LegalFile: PLOT 105-1 (PART-1).pdf21 Nov 2023
Other - LegalFile: PLOT 105-1 (PART-2).pdf21 Nov 2023
Other - LegalFile: PLOT 105-1 (PART-3).pdf21 Nov 2023
Copy of the legal title reportFile: TITLE FINAL.pdf20 Oct 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE FINANCE.pdf20 Oct 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE FINANCE.pdf20 Oct 2023
CERSAI detailsFile: UNDERTAKING OF NO CERSAI REPORT.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf20 Oct 2023
Proforma of Allotment letterFile: Allotment Letter.pdf20 Oct 2023
Proforma of Agreement for saleFile: Plain Model AFS.pdf20 Oct 2023
Layout approvalFile: LAYOUT PLAN SHEET1.pdf5 Sep 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN SHEET1.pdf5 Sep 2023
Building plan approvalFile: COMMENCEMENT CERT.pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: COMMENCEMENT CERT.pdf2 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERT.pdf2 Sep 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE .pdf2 Sep 2023
Declaration in FORM BFile: FORM B NOTARIZE.pdf2 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf2 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT FORMAT A.pdf2 Sep 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION IN ALLOTMENT LETTER.pdf2 Sep 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION IN AGREEMENT FOR SALE.pdf2 Sep 2023
Layout approvalFile: LAYOUT APPROVAL.pdf28 Aug 2023
PAN CardFile: PANCARD.pdf28 Aug 2023
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf28 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate sunny housing.pdf28 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf28 Aug 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUNNY HOMESSurvey No 89 Plot No 14 Dhamote Neral Karjat District Raigad38CompletedDec 2022Apr 2022

How this compares with Raigarh

34%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUNNY HOUSING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Neral5,900+ in Raigarh

2 kmSUNNY HOUSINGCompleted 17Lapsed / revoked 18Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: KIRAN DILIP CHAVAN

KIRAN DILIP CHAVAN has 1 registration on MahaRERA, including SUNNY HOUSING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SUNNY HOUSING is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUNNY HOUSING?

The registered promoter entity is KIRAN DILIP CHAVAN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUNNY HOUSING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUNNY HOUSING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUNNY HOUSING?

The professionals named in the filing: Architect: BRAHMAND ARCHITECT; Engineer: BRAHMAND ARCHITECT; Chartered Accountant: LAKADIA & CO; Chartered Accountant: Huma Khan and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNNY HOUSING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNNY HOUSING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNNY HOUSING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.