SUNDARAM COMPLEX

By SUNDARAM ENTERPRISES

RG-MH-29284 · RERA P52000028326 · Last updated on MahaRERA portal: 22 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
21 of 66Construction stages doneacross 6 buildings; furthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

SUNDARAM COMPLEX is a Others project by SUNDARAM ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000028326 on 18 Feb 2021. The registration is recorded completed; possession was promised by 30 Jun 2025.

At a glance

Project

  • NameSUNDARAM COMPLEX
  • TypeOthers
  • Location
    • SHELU
    • Bandhiwali
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • RERA no.P52000028326
  • ReraGenie IDRG-MH-29284

Builder

  • NameSUNDARAM ENTERPRISES
  • Entity typePartnership
  • PartnersNATHALAL TEJABHAI PATEL, GOPAL DHANJI DUBARIYA

Key dates

this monthRegisteredFeb 2021PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Feb 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings6 building records
  • Documents filed127 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA50000
B-WINGNA50000
C-WINGNA50000
D-WINGNA50000
E-WINGNA50000
F-WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 22 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 95%.

A WING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
B-WING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
C-WING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
D-WING71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
E-WING71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
F-WING71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 22 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes60%
Street LightingYes60%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes60%

Parking filed13

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots13
Open Space13
BuildingOpen SpaceTotal
A WING22
B-WING22
C-WING22
D-WING22
E-WING22
F-WING33

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,800 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19712.0
Proposed, not sanctioned17,290 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHELU, BANDHIWALI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA
EngineerTHE DESIGN INDIA
Chartered AccountantMAYUR P PASAD AND CO
PartnerRole in project
SUNDARAM ENTERPRISES-

Litigation declared1

CaseCourtStatus
203/2019/2019CIVIL COURT KARJATPROCEEDING IS CLOSED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Nov 2024

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1_.pdf25 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate form 4.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F 2 Form - 3 - 30-06-2023.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F 7 Form - 3 - 30-09-2024.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F 6 Form - 3 - 30-06-2024.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F 5 Form - 3 - 31-03-2024.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F 4 Form - 3 - 31-12-2023.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F 3 Form - 3 - 30-09-2023.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F 1 Form - 3 - 31-03-2023.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate form 2_.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: letter for sold unsold flat 31-03-2023.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: letter for sold unsold flat 30-06-2023.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: letter for sold unsold flat 30-09-2023.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: letter for sold unsold flat 31-12-2023.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: letter for sold unsold flat 31-03-2024.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: letter for sold unsold flat 30-06-2024.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: letter for sold unsold flat 30-09-2024.pdf25 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 12-OC COPY SUNDARAM 3-10-24.pdf2 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 ARCHITECT CERTIFICATE - 30-06-2023.pdf1 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 ARCHITECT CERTIFICATE - 30-09-2023.pdf1 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 ARCHITECT CERTIFICATE - 31-12-2023.pdf1 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 ARCHITECT CERTIFICATE - 31-03-2024.pdf1 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 ARCHITECT CERTIFICATE - 30-06-2024.pdf1 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 ARCHITECT CERTIFICATE - 31-03-2023.pdf1 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 ENGINEERS CERTIFICATE - 30-06-2023.pdf1 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 ENGINEERS CERTIFICATE - 30-06-2024.pdf1 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 ENGINEERS CERTIFICATE - 31-03-2024.pdf1 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 ENGINEERS CERTIFICATE - 31-12-2023.pdf1 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 ENGINEERS CERTIFICATE - 30-09-2023.pdf1 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGINEERS CERTIFICATE - 31-03-2023.pdf1 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEERS CERTIFICATE - FY - 2022-23.pdf1 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEERS CERTIFICATE - FY - 2023-24.pdf1 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032022 F.pdf27 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21.pdf26 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf26 Feb 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter Finance.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Letter Finance.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 2122N_compressed.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A QUALITY ASSURANCE CER 2021.pdf16 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM2A QUALITY ASSURANCE CER 2122.pdf16 Feb 2023
Deviation Report with respect to Allotment letterFile: No Deviation for Allotment Letter.pdf16 Feb 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation for Agreement for sale.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 2021.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 2022.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE Q1 2223.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE Q2 2223.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE Q3 2223.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 2021.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 2122.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q1 2223.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q2 2223.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q3 2223.pdf15 Feb 2023
CERSAI detailsFile: Letter for CERSAI.pdf15 Feb 2023
Disclosure of sold/ booked inventoryFile: Letter for sold flat and Shop.pdf15 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2021.pdf15 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Letter for Interest in Other Project-All Partners.pdf15 Feb 2023
Proforma of Agreement for saleFile: Draft Agreement of sale.pdf15 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Letter for seperarate bank ac.pdf15 Feb 2023
Details of encumbrances concerned to FinanceFile: no Encumbrances Letter.pdf4 Feb 2023
Details of encumbrances concerned to LegalFile: no Encumbrances Letter.pdf4 Feb 2023
Details of encumbrancesFile: Encumbrances Letter.pdf26 Jun 2022
Details of encumbrancesFile: CORT ORDER.pdf26 Jun 2022
Disclosure of sold/ booked inventoryFile: Details of Sold Booked Inventory.pdf26 Jun 2022
Proforma of Allotment letterFile: Draft Agreement for Sales.pdf26 Jun 2022
Copy of the legal title reportFile: SUNDRAM RERA TITLE AND LEGAL.PDF25 Jun 2022
Proforma of Allotment letterFile: Draft Allotment Letter.pdf25 Jun 2022
Proforma of Allotment letterFile: Draft Agreement for Sale.pdf25 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Rera Fy-17-18.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera Fy-18-19.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Rera Fy-19-20.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera Fy-20-21.pdf21 Aug 2021
Building plan approvalFile: Plan Sheet 01 21062021.pdf3 Aug 2021
Building plan approvalFile: Plan Sheet 02 21062021.PDF3 Aug 2021
Building plan approvalFile: Plan Sheet 03 21062021.PDF3 Aug 2021
Building plan approvalFile: Plan Sheet 04 21062021.PDF3 Aug 2021
Building plan approvalFile: Plan Sheet 05 21062021.PDF3 Aug 2021
Building plan approvalFile: Plan Sheet 06 21062021.PDF3 Aug 2021
Building plan approvalFile: Plan Sheet 07 21062021.PDF3 Aug 2021

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUNDARAM COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHELU5,900+ in Raigarh

Builder: SUNDARAM ENTERPRISES

SUNDARAM ENTERPRISES has 1 registration on MahaRERA, including SUNDARAM COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SUNDARAM COMPLEX is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUNDARAM COMPLEX?

The registered promoter entity is SUNDARAM ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUNDARAM COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUNDARAM COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUNDARAM COMPLEX?

The professionals named in the filing: Architect: THE DESIGN INDIA; Engineer: THE DESIGN INDIA; Chartered Accountant: MAYUR P PASAD AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNDARAM COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNDARAM COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNDARAM COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.