Completed No litigation declared Residential / Group Housing project

Sumit Garden Grove

By Sumit Garden Grove Construction LLP

RG-MH-24573 · RERA P51800009864 · Last updated on MahaRERA portal: 21 Jun 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
10 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

Sumit Garden Grove is a Residential / Group Housing project by Sumit Garden Grove Construction LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009864 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSumit Garden Grove
  • TypeResidential / Group Housing
  • Location
    • Opp to link Road
    • Chikoowadi
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009864
  • ReraGenie IDRG-MH-24573

Builder

  • NameSumit Garden Grove Construction LLP
  • Entity typeOthers
  • Managing DirectorKantilal Ghamandiram Gowani
  • Named personsSanjay Morakhia, Sumit Woods Pvt.Ltd

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 30 Dec 2021)
  • Buildings2 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sumit Garden Grove Phase 1NA260000
Sumit Garden Grove Phase 2NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Sumit Garden Grove Phase 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sumit Garden Grove Phase 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed165

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots165
Closed/Covered143
Open Space22

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,271 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Kanti Builders Pvt. Ltd.Mumbai CityMumbai City

Approvals and building plan

Permissible FSI11471.38
Proposed, not sanctioned6,609 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNariman Point

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBharat Ramesh Gandhi
PartnerRole in project
Sumit Garden Grove Construction LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800011870Dec 2021 → Dec 2022

Reason as filed by the promoterWith reference to above, we say that we have completed construction of the entire building and received Occupation Certificate dated 26.02.2021 from MCGM upto 21st floor. However the Occupation Certificate of the 22nd floor of the constructed building has not been received due to some technical compliance. Given the above we request you to grant us extension of one year and oblige

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jul 2021

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate Sumit Garden Grove.pdf21 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Revalidation Issue Letter 4258.pdf10 Jun 2022
OtherFile: Extension of RERA Registration LETTER 12042022.pdf16 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sumit Garden Grove 2A 31122021.pdf14 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020 21.pdf4 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SGG Society Registration 07122021.pdf8 Dec 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter to Registrar for Registration of Society 9082021.pdf10 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate of Sumit Garden Grove.pdf13 Jul 2021
OtherFile: Indenture of Mortgage Bajaj 20 CR Part2.pdf15 Jul 2020
OtherFile: Indenture of Mortgage Bajaj 20 CR Part3.pdf15 Jul 2020
OtherFile: Indenture of Mortgage Bajaj 20 CR Part4.pdf15 Jul 2020
OtherFile: Indenture of Mortgage Bajaj 20 CR Part5.pdf15 Jul 2020
OtherFile: Indenture of Mortgage Bajaj 20 CR Part6.pdf15 Jul 2020
OtherFile: Indenture of Mortgage Bajaj 20 CR Part6.pdf15 Jul 2020
OtherFile: Indenture of Mortgage Bajaj 20 CR Part1.pdf14 Jul 2020
Details of encumbrancesFile: Letter to RERA for Bajaj loan 1 July 2020.PDF4 Jul 2020
OtherFile: Release Deed Index 2 Piramal Trusteeship Service 13 nov 2019.pdf4 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SGG FORM 2A.PDF4 Mar 2020
Certificates of CA (Form 3)File: FORM 3 CA SGG 190220 .pdf21 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SGG Architect Certificate - Phase 1.pdf13 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate SGG - Phase 2.pdf13 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SGG Enginere Certificate.PDF13 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sumit Garden Grove.PDF10 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sgg arch phase 1 April 19.pdf19 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sgg arch phase 2 April 19.pdf19 Apr 2019
Certificates of CA (Form 5)File: Form 5 Sumit Garden Grove.PDF15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Garden Grove -CC.pdf31 Mar 2018
Details of encumbrancesFile: Sumit Garden Grove Indenture of Mortgage of Piramal.pdf15 Nov 2017
Details of encumbrancesFile: Covering letter Piramal.pdf15 Nov 2017
Layout approvalFile: 1 9 Page.pdf30 Jul 2017
Building plan approvalFile: 1 9 Page.pdf30 Jul 2017
Copy of the legal title reportFile: Title Certificate of Sumit Garden Grove.PDF30 Jul 2017
Details of encumbrancesFile: Indenture of Mortgage SGG.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 1 9 Page.pdf30 Jul 2017
Building Plan Approval (IOD)File: 1 9 Page.pdf30 Jul 2017
Declaration in FORM BFile: Form B for RERA SGG.PDF30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg cert.pdf30 Jul 2017
Certificates of CA (Form 3)File: Form 3 Sumit Garden Grove.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase 1.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase 2.pdf29 Jul 2017
Proforma of Allotment letterFile: FINAL RERA GARDEN GROOVE-.pdf29 Jul 2017
Proforma of Allotment letterFile: RERA Allotment letter Uploading.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sumit Garden Grove on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chikoowadi6,700+ in Mumbai Suburban

2 kmSumit Garden GroveCompleted 129Lapsed / revoked 84Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 346 registered projects within 2 km.

Builder: Sumit Garden Grove Construction LLP

Sumit Garden Grove Construction LLP has 1 registration on MahaRERA, including Sumit Garden Grove. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Sumit Garden Grove is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sumit Garden Grove?

The registered promoter entity is Sumit Garden Grove Construction LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sumit Garden Grove?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sumit Garden Grove?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sumit Garden Grove?

The professionals named in the filing: Architect: Bharat Ramesh Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sumit Garden Grove?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sumit Garden Grove. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sumit Garden Grove to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.