SUMATI SKYLINE

By SUBHASH SKYLINE INFRA

RG-MH-06475 · RERA P51700052640 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
14 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

SUMATI SKYLINE is a Residential / Group Housing project by SUBHASH SKYLINE INFRA in Thane, Maharashtra, registered with MahaRERA as P51700052640 on 15 Sep 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 26 of the 40 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUMATI SKYLINE
  • TypeResidential / Group Housing
  • Location
    • C.T.S. NO. 1392
    • 1393
    • 1399
    • 1400
    • 1401
    • VILLAGE AYRE
    • TALUKA KALYAN
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052640
  • ReraGenie IDRG-MH-06475

Builder

  • NameSUBHASH SKYLINE INFRA
  • Entity typePartnership
  • PartnersSUBHASH THANSING PATIL, ADITYA VINAYAK AGTE, PALLAVI SUBHASH PATIL, ARYAN SUBHASH PATIL
  • Other registrations1 more →
  • Completed1 of 2
  • Past their filed date1

Key dates

1 months past promisethis monthRegisteredSep 2023PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Sep 2023
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

65%26 of 40 units booked
80.5%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUMATI SKYLINENA121234640

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SUMATI SKYLINE: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Open Space34

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area694 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jan 2026
LandownerVillageDistrict
Rajashree Prakash SawantKhargharRaigarh
Sachin Prakash SawantKhargharRaigarh
Swapnil Prakash SawantKhargharRaigarh
Shubhada Sudhir ParayaneKothrudPune
Asim Sudhir ParayaneKothrudPune
Romali Aditya KalyaThane (M Corp.)Thane
Nirja Sudhir ParayaneKothrudPune

Approvals and building plan

Sanctioning authorityKDMC
Permissible FSI2773.84
Proposed, not sanctioned2,774 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCOMMERCE CENTRE, TANDON ROAD, OPP PARKAR SADAN,DOMBIVLI EAST
Estimated costRs 10.25 cr
Cost incurredRs 8.25 cr
Work done80.49%
BuildingWingEstimatedIncurred
SUMATI SKYLINENARs 10.00 crRs 8.25 cr
-NARs 25.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIDHI E SHAH
EngineerAditya Rajan Deshmukh
Chartered AccountantCA Sagar Joshi
Chartered AccountantCHHAJED & DOSHI
PartnerRole in project
SUBHASH SKYLINE INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 Q4 Signed.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM 2 Q4 Signed.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 Signed..pdf29 Apr 2026
Withdrawal Update Form 1File: Form-1 Signed Q3.pdf7 Feb 2026
Withdrawal Update Form 2File: Form-2 Signed Q3.pdf7 Feb 2026
Withdrawal Update Form 3File: Form-3 Signed Q3.pdf7 Feb 2026
Withdrawal Update Form 1File: Form-1 Q2 Signed.pdf5 Nov 2025
Withdrawal Update Form 2File: Form-2 Q2 Signed.pdf5 Nov 2025
Withdrawal Update Form 3File: Form-3 Q2 Signed.pdf5 Nov 2025
Form 5 (FY 2024-2025)File: IAR and Form - Subhash Skyline Infra_to upload.pdf19 Oct 2025
Withdrawal Update Form 1File: Form-01.pdf26 Jul 2025
Withdrawal Update Form 1File: Form-01.pdf26 Jul 2025
Withdrawal Update Form 2File: form 2 subhash (2).pdf26 Jul 2025
Withdrawal Update Form 2File: form 2 subhash (2).pdf26 Jul 2025
Withdrawal Update Form 3File: form3 subhash skyline infra (2).pdf26 Jul 2025
Withdrawal Update Form 3File: form3 subhash skyline infra (2).pdf26 Jul 2025
Withdrawal Update Form 1File: Form-01.pdf21 Jul 2025
Withdrawal Update Form 2File: form 2 subhash (2).pdf21 Jul 2025
Withdrawal Update Form 3File: form3 subhash skyline infra (2).pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q4.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03_.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Q4.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Subhash Skyline Infra (Q3).pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Subhash Skyline Infra - Q3_compressed.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Subhash Skyline Infra (Q3).pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 4-11.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Subhash Skyline Infra - Q2_to upload.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 4-11.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: IAR and Form - Subhash Skyline_to upload.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Subhash Skyline Infra - Q1_compressed.pdf2 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf2 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - Q1.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certi 31-3-24.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM-3 Q4.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sumati Skyline Q2.pdf9 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sumati Skyline (Q3).pdf9 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 - Sumati Skyline.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sumati - 18-01-2024.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q2 Sumati Skyline.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SUMATI SKYLINE (Q3).pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Revised.pdf13 Sep 2023
Proforma of Agreement for saleFile: SALE AGREEMENT-SUMATI SKYLINE.pdf1 Sep 2023
Deviation Report with respect to model copy of AgreementFile: deviation Letter scanned Latest.pdf1 Sep 2023
CERSAI detailsFile: CERSAI (to upload).pdf21 Aug 2023
Layout approvalFile: MYSCAN_20230708_0003.pdf9 Aug 2023
Layout approvalFile: MYSCAN_20230708_0004.pdf9 Aug 2023
Building plan approvalFile: MYSCAN_20230708_0003.pdf9 Aug 2023
Building plan approvalFile: MYSCAN_20230708_0004.pdf9 Aug 2023
PAN CardFile: PAN CARD - Subhash Skyline Infra.pdf9 Aug 2023
Copy of the legal title reportFile: Title Report in RERA Format-Sumati Skyline Project.pdf9 Aug 2023
Details of encumbrances concerned to FinanceFile: certificate of Encumbrance.pdf9 Aug 2023
Details of encumbrances concerned to LegalFile: certificate of Encumbrance.pdf9 Aug 2023
Copy of Layout Approval (in case of layout)File: MYSCAN_20230708_0003.pdf9 Aug 2023
Copy of Layout Approval (in case of layout)File: MYSCAN_20230708_0004.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230708_0003.pdf9 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230708_0004.pdf9 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: SUMATI SKYLINE SCANNED CC_compressed.pdf9 Aug 2023
Declaration about Commencement CertificateFile: Declaration certificate.pdf9 Aug 2023
Declaration in FORM BFile: Form B - Firm_compressed.pdf9 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of partner details - Aditya Agte.pdf9 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of partner details - Subhash Patil.pdf9 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of partner details - Pallavi Patil.pdf9 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Disclosure of partner details - Aryan Patil.pdf9 Aug 2023
Proforma of Allotment letterFile: Allotment Letter Format.pdf9 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details.pdf9 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation Letter_Allotment Letter.pdf9 Aug 2023

How this compares with Thane

65%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUMATI SKYLINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE AYRE,TALUKA KALYAN7,600+ in Thane

2 kmSUMATI SKYLINECompleted 78Lapsed / revoked 77Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 282 registered projects within 2 km.

Builder: SUBHASH SKYLINE INFRA

SUBHASH SKYLINE INFRA has 2 registrations on MahaRERA, including VATSALYA SKYLINE and SUMATI SKYLINE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SUMATI SKYLINE is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUMATI SKYLINE?

The registered promoter entity is SUBHASH SKYLINE INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUMATI SKYLINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUMATI SKYLINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUMATI SKYLINE?

The professionals named in the filing: Architect: VIDHI E SHAH; Engineer: Aditya Rajan Deshmukh; Chartered Accountant: CA Sagar Joshi; Chartered Accountant: CHHAJED & DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUMATI SKYLINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUMATI SKYLINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUMATI SKYLINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.