ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / SUMANGAL RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

SUMANGAL RESIDENCY

By GAJANAN DEVELOPERS

RG-MH-89223 · RERA P51500027037 · Last updated on MahaRERA portal: 29 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 25 months past the filed date
  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Sep 2024Possession promised25 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SUMANGAL RESIDENCY is a Residential / Group Housing project by GAJANAN DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500027037 on 10 Nov 2020. Possession was promised by 29 Sep 2024 and is now 25 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSUMANGAL RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 21 AND 22
    • OPP CADA OFFICE SANDESH NAGAR GARKHEDA PARISAR
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431001
  • Pincode431001
  • RERA no.P51500027037
  • ReraGenie IDRG-MH-89223

Builder

  • NameGAJANAN DEVELOPERS
  • Entity typePartnership
  • PartnersSHIVAJI KISHANRAO GHUGE, PRASHNAT VASANTRAO LANGOTE, NASIR RASHID PATHAN, SANJAY PRADIPRAO AURADKAR
  • PartnerSANDEEP WAGH
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

25 months past promisethis monthRegisteredNov 2020First promiseSep 2023Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Nov 2020
  • Promised completion29 Sep 2024
  • Revised completionRevised to 29 Sep 2024 (originally 30 Sep 2023)
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUMANGAL RESIDENCYNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

SUMANGAL RESIDENCY: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes2%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes2%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes2%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Open Space16

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area572 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
RAJESH BALABAX BUTOLEAurangabad (M Corp.)Aurangabad
BHAGWAT SURYABHAN NIKAMDhondraiBeed
VASANT SUNDARAPPA KSHIRSAGARAurangabad (M Corp.)Aurangabad
DATTA SUNDARAPPA KSHIRSAGARAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityAurangabad Municiple Corporation
Permissible FSI974.0
Proposed, not sanctioned799 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 6 ANNAPURNA TOWER KUSHAL NAGAR JALNA ROAD AURANGABAD

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDhananjay Doifode
EngineerAbhay Patil
Chartered AccountantShyam Borde
PartnerRole in project
GAJANAN DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500016837Sep 2023 → Mar 2024

Reason as filed by the promoter1) Earlier we have submitted project for 13Flats and 4 shops (sanctioned built up area of 798.575 sq. meters) at the time of rera registration. 2) But after revised building permission dated 12/01/2022 for 18 Flats, 5 officers and 04 shops (revised sanctioned build up area of 1484.485 sq. met). 3) during the covid period the construction work was stopped. So requested for project extension up to 31/03/2024

EXT51500023025Sep 2023 → Sep 2024

Reason as filed by the promoterThere is increase in sanctioned FSI from 798.575 SQM TO 1484.415 SQM vide revised permission letter dated 12/01/2022 refr no. 697/2021-22. In year 2021,2022,2023 there is substantial impact of covid on apartments booking so financial problem was there. Considering this you are requested to increase the project term.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-1.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-16.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-15.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-14.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-14.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-13.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-12.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-10.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-8.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-7.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-7.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-6.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-5.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-4.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-2.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-9.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 2.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 4.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 3.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 1.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1-11.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2021.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A 2022.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 2023.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 2024.pdf29 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Annexure A.pdf18 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Annexure A.pdf18 Nov 2024
Declaration in FORM BFile: Form B.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engin.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD BOKED DATA.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf17 Oct 2024
Declaration in FORM BFile: FORM B.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf3 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 2023.pdf21 Mar 2024
Declaration in FORM BFile: FORM -B.pdf23 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf23 Jun 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf23 Jun 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf19 Jun 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf19 Jun 2023
Declaration about Commencement CertificateFile: Format-D.pdf19 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf19 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf19 Jun 2023
CERSAI detailsFile: Asset Based Search Report.pdf19 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other real estate.pdf19 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 (1).pdf19 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (2).pdf19 Jun 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: formation of society.pdf19 Jun 2023
Status of ConveyanceFile: Conveyance Deed.pdf19 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviation in allotment letter.pdf19 Jun 2023
Deviation Report with respect to model copy of AgreementFile: deviation in rera agreement.pdf19 Jun 2023
Other - FinanceFile: Financial encumbrance.pdf19 Jun 2023
Building plan approvalFile: Building Plan.pdf7 Nov 2020
Layout approvalFile: Commencement Certificate n leyout.pdf7 Nov 2020
PAN CardFile: FIRM PAN CARD.pdf7 Nov 2020
Copy of the legal title reportFile: Title Report.pdf7 Nov 2020
Details of encumbrancesFile: Non-Encumbrace Certificate.pdf7 Nov 2020
Copy of Layout Approval (in case of layout)File: Commencement Certificate n leyout.pdf7 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf7 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER N PR CARD 11 (1).pdf7 Nov 2020
Declaration in FORM BFile: FORM B Sandeep Wagh1.pdf7 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf7 Nov 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf7 Nov 2020
OtherFile: CREDAI MEMBERSHIP CERTIFICT.pdf7 Nov 2020

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 12 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SUMANGAL RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP CADA OFFICE SANDESH NAGAR GARKHEDA PARISAR1,400+ in Aurangabad

Builder: GAJANAN DEVELOPERS

GAJANAN DEVELOPERS has 4 registrations on MahaRERA, including GAJANAN KRUPA and Sainee Dham. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that SUMANGAL RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SUMANGAL RESIDENCY is delayed beyond 29 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUMANGAL RESIDENCY?

The registered promoter entity is GAJANAN DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUMANGAL RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUMANGAL RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUMANGAL RESIDENCY?

The professionals named in the filing: Architect: Dhananjay Doifode; Engineer: Abhay Patil; Chartered Accountant: Shyam Borde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUMANGAL RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUMANGAL RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUMANGAL RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.