ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Jhamtani BizCore

Registered No litigation declared Others project

Jhamtani BizCore

By DUSK REALTY LLP

RG-MH-58729 · RERA P52100054261 · Last updated on MahaRERA portal: 18 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 15.00 crore secured on the land, in favour of Aditya Birla Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 4 months from the original
1 of 10Construction stages donefurthest along: Slabs of Super Structure, 93%
182 of 278Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

Jhamtani BizCore is a Others project by DUSK REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100054261 on 10 Jan 2024. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 96 of the 278 units on this registration are recorded sold or booked, and 1 of 10 construction stages are filed complete.

At a glance

Project

  • NameJhamtani BizCore
  • TypeOthers
  • Location
    • Mundhwa - Pune Road
    • Mundhwa
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054261
  • ReraGenie IDRG-MH-58729

Builder

  • NameDUSK REALTY LLP
  • Entity typePartnership
  • PartnersANUP PARMANAND JHAMTANI, SWANAND SURESH PHAND, UMESH DNYANESHWAR GAIKWAD, KIRAN BABURAO JADHAV, DINESH DNYANESHWAR GAIKWAD

Key dates

this monthRegisteredJan 2024First promiseDec 2027Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jan 2024
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings1 building record
  • Documents filed102 files

Current status

35%96 of 278 units booked
60.3%Work done, per cost certificate

Figures as on 18 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA20182753278

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 10 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 93%.

A: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises36%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks58%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.4%

Progress on shared amenities15

As on 18 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed340

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots340
Closed/Covered340

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,669 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Limited
Secured amountRs 15.00 crore
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI9299.46
Proposed, not sanctioned9,299 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEmpire Estate Phase 1, Old Mumbai - Pune Highway, Pimpri Colony, Pimpri - Chinchwad, Maharashtra 411
Estimated costRs 43.55 cr
Cost incurredRs 26.25 cr
Work done60.26%
BuildingWingEstimatedIncurred
ANARs 39.19 crRs 25.66 cr
-NARs 4.36 crRs 58.55 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVKa Architecture
EngineerPRANAV SHANTARAM PATIL
EngineerNARENDRA GOSAVI
Chartered AccountantRAVI TALREJA AND ASSOCIATES
Chartered AccountantCMRS & ASSOCIATES LLP
PartnerRole in project
DUSK REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100054261/WarDec 2027 → Apr 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Jhamtani BizCore Form 2025-26.pdf18 Sep 2026
Withdrawal Update Form 1File: Form 1 Q1 26-27Jhamtani BizCore.pdf21 Jul 2026
Withdrawal Update Form 2File: Jhamtani BizCore Form 2.pdf21 Jul 2026
Withdrawal Update Form 3File: JHAMTANI BIZCORE FORM-3 26-27 Q1.pdf21 Jul 2026
Withdrawal Update Form 1File: Form 1 Q1 26-27Jhamtani BizCore.pdf20 Jul 2026
Withdrawal Update Form 2File: Jhamtani BizCore Form-2.pdf20 Jul 2026
Withdrawal Update Form 3File: JHAMTANI BIZCORE FORM-3 26-27 Q1.pdf20 Jul 2026
Withdrawal Update Form 1File: Jhamtan BizCore.pdf22 Apr 2026
Withdrawal Update Form 2File: Jhamtani BizCore Form-2.pdf22 Apr 2026
Withdrawal Update Form 3File: Jhamtani Bizcore Form-3 Q4 25-26 (1).pdf22 Apr 2026
Withdrawal Update Form 1File: Bizcore Form 1 Q3 25-26.pdf20 Jan 2026
Withdrawal Update Form 2File: Bizcore Form 2 Q3 25-26.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Jhamtani Bizcore Q3 25-26 final.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-2025 (1).pdf24 Dec 2025
Form 5 (FY 2024-2025)File: JHAMTANI BIZCORE FORM5 2024-25 (1).pdf19 Dec 2025
Building plan approvalFile: 7-9-10 FLOOR.pdf29 Nov 2025
Building plan approvalFile: LG-UG-1-2-3-4-6-8.pdf29 Nov 2025
Building plan approvalFile: 11-12-13-14-15-16- TR FLOOR.pdf29 Nov 2025
Building plan approvalFile: SECTION B-B.pdf29 Nov 2025
Building plan approvalFile: Front Elevation.pdf29 Nov 2025
Building plan approvalFile: ELEVATION.pdf29 Nov 2025
Building plan approvalFile: LAYOUT-B1-B2.pdf29 Nov 2025
Withdrawal Update Form 1File: BizCore Form 1.pdf20 Oct 2025
Withdrawal Update Form 2File: BizCore.pdf20 Oct 2025
Withdrawal Update Form 3File: JHAMTANI BIZCORE FORM 3 Q2.pdf20 Oct 2025
Withdrawal Update Form 1File: Bizcore Form 1.pdf19 Oct 2025
Withdrawal Update Form 2File: BizCore.pdf19 Oct 2025
Withdrawal Update Form 3File: JHAMTANI BIZCORE FORM 3 Q2.pdf19 Oct 2025
Withdrawal Update Form 1File: JHAMTANI BIZCORE.pdf21 Jul 2025
Withdrawal Update Form 2File: Jhamtani Bizcore Form 2.pdf21 Jul 2025
Withdrawal Update Form 3File: Jhamtani Bizcore Form 3.pdf21 Jul 2025
Withdrawal Update Form 1File: JHAMTANI BIZCORE.pdf20 Jul 2025
Withdrawal Update Form 2File: Jhamtani Bizcore Form 2.pdf20 Jul 2025
Withdrawal Update Form 3File: Jhamtani Bizcore Form 3.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jhamtani BizCore.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bizcore_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DRLLP_Jhamtani Bizcore.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 13) JHAMTANI BIZCORE.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JHAMTANI BIZCORE.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHAMTANI BIZCORE FORM 3 Q3 2425.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JHAMTANI BIZCORE.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Jhamtani BizCore.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: BIZCORE FORM 5 2023-24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JHAMTANI BIZCORE WING-A (2).pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHAMTANIBIXCORE.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JHMTANI BIZCORE.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: JHAMTANI BIXCORE.pdf16 Oct 2024
Other - LegalFile: index II of mort deed.pdf9 Oct 2024
Details of encumbrances concerned to FinanceFile: Bizcore Legal Encumbrances.pdf7 Oct 2024
CERSAI detailsFile: CERSAI 07102024.pdf7 Oct 2024
Details of encumbrances concerned to LegalFile: Bizcore Legal Encumbrances.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: JHAMTANI BIZCORE.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JHAMTANI BIZCORE WING- A.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jhamtani Bizcore.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JHAMTANI BIZCORE.pdf17 Jul 2024
Layout approvalFile: Sanction Layout.pdf28 Jun 2024
Building plan approvalFile: Sanction Layout.pdf28 Jun 2024
Copy of Layout Approval (in case of layout)File: Sanction Layout.pdf28 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Layout.pdf28 Jun 2024
Declaration about Commencement CertificateFile: Declaration about CC 28062024 to be upload.pdf28 Jun 2024
Building plan approvalFile: Jhamtani Bizcore Combine PDF Sanctioned 2024.pdf25 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Jhamtani Bizcore Combine PDF Sanctioned 2024.pdf25 Jun 2024
Layout approvalFile: Jhamtani Bizcore Combine PDF Sanctioned 2024.pdf24 Jun 2024
Copy of Layout Approval (in case of layout)File: Jhamtani Bizcore Combine PDF Sanctioned 2024.pdf24 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Bizcore CC.pdf24 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Jhamtani Bizcore.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BIZCORE.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JHAMTANI BIZCORE.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: DUSK BIZCORE.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BIZCORE.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bizcore Dusk Realty.pdf19 Apr 2024
Proforma of Agreement for saleFile: Agreement to Sell - Jhamtani Bizcore.pdf16 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviations Report for Agreement to Sell - Jhamtani BizCore.pdf16 Dec 2023
Other - LegalFile: Sale Deed - DUSK REALTY Part 1.pdf14 Dec 2023
Other - LegalFile: Sale Deed-DUSK REALTY Part 2.pdf14 Dec 2023
Details of encumbrances concerned to FinanceFile: BOTH ENCUMBRANCES (2).pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: BOTH ENCUMBRANCES (2).pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2.pdf31 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE QEGANIZATIONS.pdf31 Oct 2023

How this compares with Pune

35%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jhamtani BizCore on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa13,700+ in Pune

2 kmJhamtani BizCoreCompleted 25Lapsed / revoked 18Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 142 registered projects within 2 km.

Builder: DUSK REALTY LLP

DUSK REALTY LLP has 1 registration on MahaRERA, including Jhamtani BizCore. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Jhamtani BizCore is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jhamtani BizCore?

The registered promoter entity is DUSK REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jhamtani BizCore?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jhamtani BizCore?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jhamtani BizCore?

The professionals named in the filing: Architect: VKa Architecture; Engineer: PRANAV SHANTARAM PATIL; Engineer: NARENDRA GOSAVI; Chartered Accountant: RAVI TALREJA AND ASSOCIATES; Chartered Accountant: CMRS & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jhamtani BizCore?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jhamtani BizCore. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jhamtani BizCore to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.