Home / Browse projects / Mumbai Suburban, Maharashtra / SUKH SAAGAR

Registered No litigation declared Others project

SUKH SAAGAR

By R P COMBINES

RG-MH-17738 · RERA P51800056375 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
58 of 67Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

SUKH SAAGAR is a Others project by R P COMBINES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056375 on 31 May 2024. Possession is promised by 31 Dec 2028. 9 of the 67 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUKH SAAGAR
  • TypeOthers
  • Location
    • P K ROAD
    • MULUND WEST
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • RERA no.P51800056375
  • ReraGenie IDRG-MH-17738

Builder

  • NameR P COMBINES
  • Entity typePartnership
  • PartnerBHARAT RATANSHI PATEL
  • PartnerMAHESH RATANSHI PATEL
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects4 →

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

13%9 of 67 units booked
81.5%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUKH SAAGARNA832161667

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

SUKH SAAGAR: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor80%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Closed/Covered55

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,014 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2025
LandownerVillageDistrict
R P COMBINESMulundMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2756.5
Proposed, not sanctioned2,756 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBODKE BUILDING, N S ROAD, NEAR MULUND RAILWAY STATION, MULUND WEST MUMBAI MAHARASHTRA -400080
Estimated costRs 33.08 cr
Cost incurredRs 26.96 cr
Work done81.5%
BuildingWingEstimatedIncurred
SUKH SAAGARNARs 32.83 crRs 26.96 cr
-NARs 25.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR P ASUNDARIA
EngineerRAJAN CHANDRAKANT TIPNIS
Chartered AccountantRAKSHA PALAN AND CO
Chartered AccountantBHAVESH GANATRA
PartnerRole in project
R P COMBINES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: NEW Architech certificate.pdf1 Jul 2026
Withdrawal Update Form 2File: Form - 2_ ENGINEER CERTIFICATE EDT 31-12-25-.pdf1 Jul 2026
Withdrawal Update Form 3File: FORM 3 UDIN_ 01-07-26.pdf1 Jul 2026
Withdrawal Update Form 1File: NEW Architech certificate.pdf9 May 2026
Withdrawal Update Form 1File: NEW Architech certificate.pdf9 May 2026
Withdrawal Update Form 2File: Form - 2_ ENGINEER CERTIFICATE EDT 31-12-25-.pdf9 May 2026
Withdrawal Update Form 2File: Form - 2_ ENGINEER CERTIFICATE EDT 31-12-25-.pdf9 May 2026
Withdrawal Update Form 3File: FORM 3 UDIN_.pdf9 May 2026
Withdrawal Update Form 3File: FORM 3 UDIN_.pdf9 May 2026
Withdrawal Update Form 1File: FORM 1 - ARCHITECTu0027S CERTIFICATE.pdf4 Dec 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERTIFICATE.pdf4 Dec 2025
Withdrawal Update Form 3File: FORM 3 - CHARTERED ACCOUNTANTu0027S CERTIFICATE.pdf4 Dec 2025
Withdrawal Update Form 1File: FORM 1 - ARCHITECTu0027S CERTIFICATE.pdf29 Nov 2025
Withdrawal Update Form 2File: FORM 2 - ENGINEERu0027S CERTIFICATE.pdf29 Nov 2025
Withdrawal Update Form 3File: FORM 3 - CHARTERED ACCOUNTANTu0027S CERTIFICATE.pdf29 Nov 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE 31072025.pdf30 Sep 2025
Withdrawal Update Form 2File: Form - 2_ ENGINEER CERTIFICATE EDT.pdf30 Sep 2025
Withdrawal Update Form 3File: FORM 3 JUNE 2025_compressed.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: form 5 annual report.pdf30 Sep 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf5 Jul 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf5 Jul 2025
Withdrawal Update Form 2File: Form - 2_ ENGINEER CERTIFICATE EDT - 23052025.pdf5 Jul 2025
Withdrawal Update Form 2File: Form - 2_ ENGINEER CERTIFICATE EDT - 23052025.pdf5 Jul 2025
Withdrawal Update Form 3File: FORM 3 CHARTERED ACCOUNTANTu0027S CERTIFICATE.pdf5 Jul 2025
Withdrawal Update Form 3File: FORM 3 CHARTERED ACCOUNTANTu0027S CERTIFICATE.pdf5 Jul 2025
Layout approvalFile: PLAN AS ON 170425 COMPRESSED.pdf6 May 2025
Copy of Layout Approval (in case of layout)File: PLAN AS ON 170425 COMPRESSED.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3_compressed.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2_ ENGINEER CERTIFICATE EDT - 30-4-25.pdf6 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC DATED 27032025.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 chartered accountant certificate DEC2024.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate FORM2.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE SEPT 24.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_11zon.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFIED FINAL.pdf29 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: m r patel disclosure of interest in othr org244.pdf29 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: b r patel disclosure of interest in othr org243.pdf29 May 2024
Building plan approvalFile: NA Order.pdf23 May 2024
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf23 May 2024
Details of encumbrances concerned to FinanceFile: DECL OF NO LEGAL AND DINANCIAL ENCUMBRANCES ON THE PROJECT.pdf9 May 2024
Details of encumbrances concerned to LegalFile: DECL OF NO LEGAL AND DINANCIAL ENCUMBRANCES ON THE PROJECT.pdf9 May 2024
CERSAI detailsFile: CERSAI REPORT.pdf9 May 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE DRAFT.pdf9 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf9 May 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf11 Mar 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf11 Mar 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf11 Mar 2024
Layout approvalFile: 08 PARKING_09_10_merged.pdf27 Feb 2024
Layout approvalFile: 01 COPY HIGHLIGHTED.pdf27 Feb 2024
Layout approvalFile: 02_03_04_merged.pdf27 Feb 2024
Layout approvalFile: 05_06_07_merged.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: 01 COPY HIGHLIGHTED.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: 02_03_04_merged.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: 05_06_07_merged.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: 08 PARKING_09_10_merged.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHRera certificatE.pdf23 Feb 2024
Deviation Report with respect to Allotment letterFile: Declatarion of no allotment an No Deviation227.pdf23 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Declaration regarding non execution 228.pdf23 Feb 2024
Declaration about Commencement CertificateFile: Declaration about CC225.pdf20 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 2412651_FurtherCC_signed (1).pdf19 Feb 2024
Declaration in FORM BFile: form B Affidavit cum Declaration RERA.pdf19 Feb 2024
PAN CardFile: PAN CARD FINAL.pdf17 Feb 2024
Copy of the legal title reportFile: Legal Title Report 2024211.pdf17 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
KILBIL RATANS N ROAD MULUND WEST35CompletedDec 2020Jan 2019

How this compares with Mumbai Suburban

13%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUKH SAAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

Builder: R P COMBINES

R P COMBINES has 2 registrations on MahaRERA, including KILBIL RATAN and SUKH SAAGAR. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SUKH SAAGAR is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUKH SAAGAR?

The registered promoter entity is R P COMBINES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUKH SAAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUKH SAAGAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUKH SAAGAR?

The professionals named in the filing: Architect: R P ASUNDARIA; Engineer: RAJAN CHANDRAKANT TIPNIS; Chartered Accountant: RAKSHA PALAN AND CO; Chartered Accountant: BHAVESH GANATRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUKH SAAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUKH SAAGAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUKH SAAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.