ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / Sugee Sukrut

Registered No litigation declared Residential / Group Housing project

Sugee Sukrut

By Sugee Nine Developers LLP

RG-MH-05495 · RERA P51900051181 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
5 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

Sugee Sukrut is a Residential / Group Housing project by Sugee Nine Developers LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900051181 on 1 Jun 2023. Possession is promised by 31 Oct 2026. 19 of the 24 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSugee Sukrut
  • TypeResidential / Group Housing
  • Location
    • Veer Sawarkar Marg (Cadell Road)
    • Dadar West
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900051181
  • ReraGenie IDRG-MH-05495

Builder

  • NameSugee Nine Developers LLP
  • Entity typePartnership
  • PartnersSubhash Vishnu Deshmukh, Jitendra Chhaganlal Rawal

Key dates

this monthRegisteredJun 2023PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion31 Oct 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed119 files

Current status

79%19 of 24 units booked
219.8%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sugee SukrutNA191824024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Sugee Sukrut: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered31

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area512 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2543.46
Proposed, not sanctioned1,985 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWorli Mumbai 400030
Estimated costRs 16.27 cr
Cost incurredRs 35.76 cr
Work done219.79%
BuildingWingEstimatedIncurred
Sugee SukrutNARs 16.27 crRs 35.76 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAJEET PRASAD
EngineerHarold Pereira
Chartered AccountantMeishery Palani & Co
PartnerRole in project
Sugee Nine Developers LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA Form 1 as on June 2026 Sugee Sukrut.pdf11 Jul 2026
Withdrawal Update Form 1File: RERA Form 1 as on June 2026 Sugee Sukrut.pdf11 Jul 2026
Withdrawal Update Form 1File: RERA Form 1 as on June 2026 Sugee Sukrut.pdf11 Jul 2026
Withdrawal Update Form 2File: RERA Form 2 as on June 2026 Sugee Sukrut.pdf11 Jul 2026
Withdrawal Update Form 2File: RERA Form 2 as on June 2026 Sugee Sukrut.pdf11 Jul 2026
Withdrawal Update Form 2File: RERA Form 2 as on June 2026 Sugee Sukrut.pdf11 Jul 2026
Withdrawal Update Form 3File: RERA Form 3 as on June 2026 Sugee Sukrut.pdf11 Jul 2026
Withdrawal Update Form 3File: RERA Form 3 as on June 2026 Sugee Sukrut.pdf11 Jul 2026
Withdrawal Update Form 3File: RERA Form 3 as on June 2026 Sugee Sukrut.pdf11 Jul 2026
Form 1File: RERA Form 1 as on 30062023.pdf2 Jun 2026
Form 2File: RERA Form 2 as on 300623.pdf2 Jun 2026
Form 3File: RERA Form 3 as on 30062023.pdf2 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory June 2023.pdf2 Jun 2026
Withdrawal Update Form 1File: form 1 Sugee Sukrut March 2026.pdf30 Apr 2026
Withdrawal Update Form 1File: form 1 Sugee Sukrut March 2026.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2 SUGEE SUKRUT MARCH 2026.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2 SUGEE SUKRUT MARCH 2026.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 SUGEE SUKRUT MARCH 2026.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3 SUGEE SUKRUT MARCH 2026.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 Dec 2025 Sugee Sukrut.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 Dec 2025 Sugee Sukrut.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 2025 Sugee Sukrut.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 2025 Sugee Sukrut.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 Sugee Sukrut.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 Sugee Sukrut.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 sep 2025 Sugee Sukrut.pdf25 Feb 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30062025- Sukrut.pdf25 Feb 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30092025 Sukrut.pdf25 Feb 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30062025- Sukrut.pdf23 Feb 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30062025- Sukrut.pdf23 Feb 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30062025- Sukrut.pdf23 Feb 2026
Form 1File: From 1 Sep 2023.pdf17 Dec 2025
Form 2File: RERA Form 2 as on 30092023 Sukrut.pdf17 Dec 2025
Form 3File: RERA Form 3 as on 30092023 Sukrut.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Sep 2023.pdf17 Dec 2025
Form 1File: Sukrut Form 1.pdf17 Dec 2025
Form 2File: Sukrut Form 2.pdf17 Dec 2025
Form 3File: Form 3 Dec 2023.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Dec 2023.pdf17 Dec 2025
Form 1File: Fom 1 March 2024.pdf17 Dec 2025
Form 2File: Form 2 March 2024.pdf17 Dec 2025
Form 3File: Form 3 March 2024.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Mar 2024.pdf17 Dec 2025
Form 1File: form 1 for June 2024.pdf17 Dec 2025
Form 2File: Form 2 for June 2024.pdf17 Dec 2025
Form 3File: form 3 for June 2024.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory June 2024.pdf17 Dec 2025
Form 1File: RERA Form 1 as on 30092024 Sukrut.pdf17 Dec 2025
Form 2File: RERA Form 2 as on 3009024 Sukrut.pdf17 Dec 2025
Form 3File: RERA Form 3 as on 300924 Sukrut.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Sep 2024.pdf17 Dec 2025
Form 1File: RERA Form 1 as on 31122024- Sukrut.pdf17 Dec 2025
Form 2File: RERA Form 2 as on 31122024- Sukrut.pdf17 Dec 2025
Form 3File: RERA Form 3 as on 31122024- Sukrut.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Dec 2024.pdf17 Dec 2025
Form 1File: RERA Form 1 as on 31032025 Sukrut.pdf17 Dec 2025
Form 2File: RERA Form 2 as on 31032025 Sukrut.pdf17 Dec 2025
Form 3File: RERA Form 3 as on 31032025 Sukrut.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Mar 2025.pdf17 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 30092024 Sukrut.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 30092024 Sukrut.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 31122024- Sukrut.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 31122024- Sukrut.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 31122024- Sukrut.pdf8 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 for FY 23-24- Sukrut.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 for June 2024.pdf17 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 for June 2024.pdf17 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 300924 Sukrut.pdf17 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 for June 2024.pdf17 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 3009024 Sukrut.pdf17 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for March 2024.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fom 1 March 2024.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2023.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024.pdf3 Jun 2024
Proforma of Agreement for saleFile: SUKRUT_DRAFTAFS.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sukrut Form 1 for Sep 2023.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sukrut Form 1.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sukrut Form 2.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 300923 S9DLLP.pdf8 Nov 2023

How this compares with Mumbai City

79%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sugee Sukrut on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dadar West780+ in Mumbai City

2 kmSugee SukrutCompleted 53Lapsed / revoked 53Other 81Dot size: filed unitsN

Filed coordinates, straight-line distance. 187 registered projects within 2 km.

Builder: Sugee Nine Developers LLP

Sugee Nine Developers LLP has 1 registration on MahaRERA, including Sugee Sukrut. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Sugee Sukrut is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sugee Sukrut?

The registered promoter entity is Sugee Nine Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sugee Sukrut?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sugee Sukrut?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sugee Sukrut?

The professionals named in the filing: Architect: PRAJEET PRASAD; Engineer: Harold Pereira; Chartered Accountant: Meishery Palani & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sugee Sukrut?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sugee Sukrut. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sugee Sukrut to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.