Home / Browse projects / Sugee Srushti

Registered No litigation declared Residential / Group Housing project

Sugee Srushti

By Sugee Fifteen Developers LLP

RG-MH-18507 · RERA P51900077195 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Oct 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 78%
7 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Sugee Srushti is a Residential / Group Housing project by Sugee Fifteen Developers LLP in Dadar (East), 400014, registered with MahaRERA as P51900077195 on 29 Jul 2024. Possession is promised by 31 Oct 2027. 11 of the 18 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSugee Srushti
  • TypeResidential / Group Housing
  • Location
    • Khareghat Road
    • Dadar (East)
    • 400014
  • Pincode400014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900077195
  • ReraGenie IDRG-MH-18507

Builder

  • NameSugee Fifteen Developers LLP
  • Entity typePartnership
  • PartnersPritesh Mangilal Jain, Geeta Subhash Deshmukh

Key dates

this monthRegisteredJul 2024PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jul 2024
  • Promised completion31 Oct 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Current status

61%11 of 18 units booked
88.0%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sugee SrushtiNA181818018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 78%.

Sugee Srushti: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area622 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jan 2026
LandownerVillageDistrict
Smt Nalinee Balwant MadgavkarMumbai CityMumbai City
Miss Shruti Balwant MadgavkarMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2401.39
Proposed, not sanctioned2,401 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNIRLON HOUSE,DR ANNIE BESANT RD,WORLI,MUMBAI
Estimated costRs 21.66 cr
Cost incurredRs 19.07 cr
Work done88.05%
BuildingWingEstimatedIncurred
Sugee SrushtiNARs 21.66 crRs 19.07 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. Prajeet Prasad
EngineerHarold Pereira
Chartered AccountantCA Jinesh Palani
PartnerRole in project
Sugee Fifteen Developers LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2027

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sugee Srushti March 2026.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 Sugee Srushti March 2026.pdf27 Apr 2026
Withdrawal Update Form 3File: form 3 Sugee Srushti March 2026.pdf27 Apr 2026
Withdrawal Update Form 1File: form 1 Dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 1File: form 1 Dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 1File: form 1 Dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 1File: form 1 Dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 1File: form 1 Dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 1File: form 1 Dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 2File: form 2 dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 2File: form 2 dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 2File: form 2 dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 2File: form 2 dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 2File: form 2 dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 2File: form 2 dec 25 Sugee Srushti.pdf31 Jan 2026
Withdrawal Update Form 3File: Sugee Srushti - Form 03 for CA Certificate.pdf31 Jan 2026
Withdrawal Update Form 3File: Sugee Srushti - Form 03 for CA Certificate.pdf31 Jan 2026
Withdrawal Update Form 3File: Sugee Srushti - Form 03 for CA Certificate.pdf31 Jan 2026
Withdrawal Update Form 3File: Sugee Srushti - Form 03 for CA Certificate.pdf31 Jan 2026
Withdrawal Update Form 3File: Sugee Srushti - Form 03 for CA Certificate.pdf31 Jan 2026
Withdrawal Update Form 3File: Sugee Srushti - Form 03 for CA Certificate.pdf31 Jan 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30092025 Sugee Srushti.pdf27 Jan 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30092025 Sugee Srushti.pdf27 Jan 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30092025 Sugee Srushti.pdf27 Jan 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30092025 Sugee Srushti.pdf27 Jan 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30092025 Sugee Srushti.pdf27 Jan 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30092025 Sugee Srushti.pdf27 Jan 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30092025 Sugee Srushti.pdf27 Jan 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30092025 Sugee Srushti.pdf27 Jan 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30092025 Sugee Srushti.pdf27 Jan 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30_06_2025- Sugee Srushti.pdf24 Jan 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30_06_2025- Sugee Srushti.pdf24 Jan 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30_06_2025-Sugee Srushti.pdf24 Jan 2026
Form 1File: RERA Form 1 as on 30092024 Sugee Srushti.pdf16 Dec 2025
Form 2File: RERA Form 2 as on 30092024 Sugee Srushti.pdf16 Dec 2025
Form 3File: RERA Form 3 as on 30_09_2024- Sugee Srushti.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Sep 2024.pdf16 Dec 2025
Form 1File: RERA Form 1 as on 31122024.pdf16 Dec 2025
Form 2File: RERA Form 2 as on 31122024.pdf16 Dec 2025
Form 3File: RERA Form 3 as on 31122024.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Dec 2024.pdf16 Dec 2025
Form 1File: RERA Form 1 as on 31_03_2025- Sugee Srushti.pdf16 Dec 2025
Form 2File: RERA form 2 as on 31_03_2025- Sugee Srushti.pdf16 Dec 2025
Form 3File: RERA Form 3 as on 31_03_2025- Sugee Srushti.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory March 2025.pdf16 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 31_12_2024.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 2 as on 31122024.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 31122024.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 30092024 Sugee Srushti.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 30_09_2024- Sugee Srushti.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 30092024 Sugee Srushti.pdf25 Nov 2024
CERSAI detailsFile: 1 CERSAI details (2 files merged).pdf16 Jul 2024
Proforma of Agreement for saleFile: AFS_Final.pdf16 Jul 2024
Proforma of Allotment letterFile: Allotment letter.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf6 Jul 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (1).pdf20 Jun 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (1).pdf20 Jun 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (1).pdf20 Jun 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (1).pdf20 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS - Zee Sadguru - Copy_01 (13 files merged) (1).pdf20 Jun 2024
Layout approvalFile: Building Plan_Sheet No-1.pdf10 Jun 2024
Layout approvalFile: Building Plan_Sheet No-2.pdf10 Jun 2024
Layout approvalFile: Building Plan_Sheet No-3.pdf10 Jun 2024
Layout approvalFile: Building Plan_Sheet No-4-5.pdf10 Jun 2024
Building plan approvalFile: Building Plan_Sheet No-1.pdf10 Jun 2024
Building plan approvalFile: Building Plan_Sheet No-2.pdf10 Jun 2024
Building plan approvalFile: Building Plan_Sheet No-3.pdf10 Jun 2024
Building plan approvalFile: Building Plan_Sheet No-4-5.pdf10 Jun 2024
PAN CardFile: Firm Pan.pdf10 Jun 2024
Copy of the legal title reportFile: MahaRERA_Title Report_10052024.pdf10 Jun 2024
Details of encumbrances concerned to FinanceFile: No Encrumbance Legal.pdf10 Jun 2024
Details of encumbrances concerned to LegalFile: No Encrumbance Legal.pdf10 Jun 2024
Copy of Layout Approval (in case of layout)File: Building Plan_Sheet No-1.pdf10 Jun 2024
Copy of Layout Approval (in case of layout)File: Building Plan_Sheet No-2.pdf10 Jun 2024
Copy of Layout Approval (in case of layout)File: Building Plan_Sheet No-3.pdf10 Jun 2024
Copy of Layout Approval (in case of layout)File: Building Plan_Sheet No-4-5.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No-1.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No-2.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No-3.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_Sheet No-4-5.pdf10 Jun 2024

Keep Sugee Srushti on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dadar (East)

2 kmSugee SrushtiCompleted 19Lapsed / revoked 10Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: Sugee Fifteen Developers LLP

Sugee Fifteen Developers LLP has 1 registration on MahaRERA, including Sugee Srushti. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Sugee Srushti is delayed beyond 31 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sugee Srushti?

The registered promoter entity is Sugee Fifteen Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sugee Srushti?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sugee Srushti?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sugee Srushti?

The professionals named in the filing: Architect: Mr. Prajeet Prasad; Engineer: Harold Pereira; Chartered Accountant: CA Jinesh Palani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sugee Srushti?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sugee Srushti. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sugee Srushti to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.