Sugee Samruddhi

By Sugee Six Developers LLP

RG-MH-17893 · RERA P51900056033 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 93%
3 of 10Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

Sugee Samruddhi is a Residential / Group Housing project by Sugee Six Developers LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900056033 on 10 May 2024. Possession is promised by 31 Aug 2027. 7 of the 10 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSugee Samruddhi
  • TypeResidential / Group Housing
  • Location
    • Dr. M.B. Raut Marg
    • Shivaji Park
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • RERA no.P51900056033
  • ReraGenie IDRG-MH-17893

Builder

  • NameSugee Six Developers LLP
  • Entity typePartnership
  • PartnersNishant Subhash Deshmukh, Pritesh Mangilal Jain
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2024PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2024
  • Promised completion31 Aug 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed106 files

Current status

70%7 of 10 units booked
64.9%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sugee SamruddhiNA151410010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 93%.

Sugee Samruddhi: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises4%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered38
Open Space1

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area461 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025
LandownerVillageDistrict
Lopamudra Dilip WarangGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Vaishali Pravin TrikannadGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Sahil Avinash VengsarkarGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
Sangeeta Vengsarkar ShahGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2568.39
Proposed, not sanctioned1,449 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB N Agarwal Market Shyamkamal Trade Centre Vile Parle East
Estimated costRs 23.22 cr
Cost incurredRs 15.07 cr
Work done64.9%
BuildingWingEstimatedIncurred
Sugee SamruddhiNARs 23.22 crRs 15.07 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrajeet Prasad
EngineerHarold Pereira
Chartered AccountantMeisheri Palani and Company
PartnerRole in project
Sugee Six Developers LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600040Bhakti AchrekarSugee Six Developers LLP10/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2027

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sugee Samruddhi march 2026.pdf27 Apr 2026
Withdrawal Update Form 2File: form 2 Sugee Samruddhi March 2026.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3 Sugee Samruddhi March 2026.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1 Architect Certificate Dec 2025 Sugee Samruddhi.pdf3 Feb 2026
Withdrawal Update Form 1File: FORM 1 Architect Certificate Dec 2025 Sugee Samruddhi.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 Sugee Samruddhi Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 Sugee Samruddhi Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 3File: RERA Form 3 as on 31122025-Sugee Samruddhi.pdf3 Feb 2026
Withdrawal Update Form 3File: RERA Form 3 as on 31122025-Sugee Samruddhi.pdf3 Feb 2026
Form 5 (FY 2024-2025)File: CA form 5 FY 24-25- Sugee Samruddhi.pdf3 Feb 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30062025 Sugee Samruddhi.pdf28 Jan 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30062025 Sugee Samruddhi.pdf28 Jan 2026
Withdrawal Update Form 1File: RERA Form 1 as on 30062025 Sugee Samruddhi.pdf28 Jan 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30062025 Sugee Samruddhi.pdf28 Jan 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30062025 Sugee Samruddhi.pdf28 Jan 2026
Withdrawal Update Form 2File: RERA Form 2 as on 30062025 Sugee Samruddhi.pdf28 Jan 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30062025 Sugee Samruddhi.pdf28 Jan 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30062025 Sugee Samruddhi.pdf28 Jan 2026
Withdrawal Update Form 3File: RERA Form 3 as on 30062025 Sugee Samruddhi.pdf28 Jan 2026
Form 1File: RERA Form 1 as on 30062024 Sugee Samruddhi.pdf23 Dec 2025
Form 2File: RERA Form 2 as on 30062024 Sugee Samruddhi.pdf23 Dec 2025
Form 3File: RERA Form 3 as on 30062024 Sugee Samruddhi.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory June 2024 Sugee Samruddhi.pdf23 Dec 2025
Form 1File: RERA form 1 as on 30092024 Sugee Samruddhi.pdf23 Dec 2025
Form 2File: RERA Form 2 as on 30092024 Sugee Samruddhi.pdf23 Dec 2025
Form 3File: RERA Form 3 as on 30092024 Sugee Samruddhi.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Sep 2024 Sugee Samruddhi.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Dec 2024 Sugee Samruddhi.pdf23 Dec 2025
Form 1File: RERA Form 1 as on 31122024 Sugee Samruddhi.pdf23 Dec 2025
Form 2File: RERA Form 2 as on 31122024 Sugee Samruddhi.pdf23 Dec 2025
Form 3File: RERA Form 3 as on 31122024 Sugee Samruddhi.pdf23 Dec 2025
Form 1File: RERA Form 1 as on 31032025 Sugee Samruddhi.pdf23 Dec 2025
Form 2File: RERA Form 2 as on 31032025 Sugee Samruddhi.pdf23 Dec 2025
Form 3File: RERA Form 3 as on 31032025 Sugee Samruddhi.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory March 2025 Sugee Samruddhi.pdf23 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for March 2025 Samruddhi.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 31122024.pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 31122024.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 31122024.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA form 1 as on 30_09_2024 Sugee Samruddhi.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Sep 2024.pdf17 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 30092024 Samruddhi.pdf17 Nov 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate S6DLLP.pdf10 Aug 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate S6DLLP.pdf10 Aug 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate S6DLLP.pdf10 Aug 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate S6DLLP.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 30_06_2024- Sugee Samruddhi.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 30_06_2024-S6DLLP.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 30_06_2024- Sugee Samruddhi.pdf10 Aug 2024
Building plan approvalFile: 1.pdf21 Jun 2024
Building plan approvalFile: 2.pdf21 Jun 2024
Building plan approvalFile: 3.pdf21 Jun 2024
Building plan approvalFile: 4.pdf21 Jun 2024
Building plan approvalFile: 5.pdf21 Jun 2024
Building plan approvalFile: 6.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf21 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for 2024.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Jun 2024
Declaration about Commencement CertificateFile: Format D-Final.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sugee Samruddhi CA Certificate.pdf30 Apr 2024
Other - LegalFile: Shanta Ganesh Prasad_Lease Deed.pdf27 Apr 2024
Building plan approvalFile: Plan 01.pdf12 Apr 2024
Building plan approvalFile: Plan 02.pdf12 Apr 2024
Building plan approvalFile: Plan 03.pdf12 Apr 2024
Building plan approvalFile: Plan 04.pdf12 Apr 2024
Building plan approvalFile: Plan 05.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 01.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 02.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 03.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 04.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 05.pdf12 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
PrekshaC S No 138D10 of Matunga Division Plot No 169D Matunga East Mumbai 40001467CompletedSep 2020Late, Aug 2021

How this compares with Mumbai City

70%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sugee Samruddhi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivaji Park780+ in Mumbai City

Builder: Sugee Six Developers LLP

Sugee Six Developers LLP has 2 registrations on MahaRERA, including Preksha and Sugee Samruddhi. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Sugee Samruddhi is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sugee Samruddhi?

The registered promoter entity is Sugee Six Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sugee Samruddhi?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sugee Samruddhi?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sugee Samruddhi?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sugee Samruddhi?

The professionals named in the filing: Architect: Prajeet Prasad; Engineer: Harold Pereira; Chartered Accountant: Meisheri Palani and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sugee Samruddhi?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sugee Samruddhi. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sugee Samruddhi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.