ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / STUDIO HIGH 5 Phase 2

Completed No litigation declared Residential / Group Housing project

STUDIO HIGH 5 Phase 2

By RAMSHIROMANI LURKHUR YADAV

RG-MH-11584 · RERA P52000003207 · Last updated on MahaRERA portal: 6 Apr 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2021Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 28 documents Report an error

STUDIO HIGH 5 Phase 2 is a Residential / Group Housing project by RAMSHIROMANI LURKHUR YADAV in Raigarh, Maharashtra, registered with MahaRERA as P52000003207 on 5 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2021. The completion date has moved by 22 months from the original filing.

At a glance

Project

  • NameSTUDIO HIGH 5 Phase 2
  • TypeResidential / Group Housing
  • Location
    • NERAL KALAMB ROAD
    • DHAMOTE
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000003207
  • ReraGenie IDRG-MH-11584

Builder

  • NameRAMSHIROMANI LURKHUR YADAV
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017First promiseMay 2019Revised toMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Aug 2017
  • Promised completion31 Mar 2021
  • Revised completionRevised to 31 Mar 2021 (originally 31 May 2019)
  • Buildings2 building records
  • Documents filed28 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FELIZ WING DNA50000
PALACIO WING CNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

FELIZ WING D82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PALACIO WING C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 6 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
CLUBHOUSEYes100%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Open Space9
BuildingOpen SpaceTotal
FELIZ WING D55
PALACIO WING C44

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,430 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9603.16
Proposed, not sanctioned4,378 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Moti Sweets, Close to Regency, MIDC, Dombivli East - 421203

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSatish V Kanade
EngineerATUL KUDTARKAR
PartnerRole in project
RAMSHIROMANI LURKHUR YADAV-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000008706May 2019 → Mar 2021

Reason as filed by the promoterWe were a bit late to restart our project post easing of lockdown. Phase 2 has 2 buildings namely -Palacio & Feliz. We are informing that we have completed G+8 Palacio and handed over society to the residents already. We are a bit away from completing G+4 Feliz Building. Currently, we have completed plaster work for our building and around 70% work is already complete. We have been on time for Palacio and are confident to complete Feliz by 31st March 2021. Please grant us this extension for the same. Thank you.

EXT52000001999May 2019 → May 2020

Reason as filed by the promoterProject was Registered with two buildings Studio High 5 Phase 2 namely PALACIO & FELIZ. Palacio has been completed and documents have been submitted. Feliz begins on 10.06.2019. Held back due to economic & financial Slowdown. No bookings taken in Building FELIZ Yet.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Feb 2023

Documents filed28

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 C D Wing 06042023.pdf6 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 SH5 Joint Final.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 March 2020.pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 March 2021.pdf10 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2-OC D Wing Feliz.pdf10 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SH5 C Wing Society OC.pdf10 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SH5 D Wing Society OC_compressed (1).pdf10 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 2018-19.pdf5 Nov 2019
OtherFile: SH5 P2 OC Application Final.pdf18 May 2019
OtherFile: 100 PC Letter Architect.pdf18 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: sonu builders Engineer Certificate (1).pdf17 Jan 2019
Certificates of CA (Form 5)File: FORM V-SONU.pdf15 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dated 23042018 Final compressed.pdf15 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dated 17042018 compressed.pdf15 May 2018
Certificates of CA (Form 3)File: Form3 Sonu Builders 25April18.pdf15 May 2018
Layout approvalFile: Studio High 5 Phase 2_Approval 001_to_005.pdf28 Jul 2017
PAN CardFile: PAN Card R L YADAV.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Studio High 5 Phase 2_Approval 001_to_005.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IMG-ilovepdf-compressed.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf28 Jul 2017
Certificates of CA (Form 3)File: Form 3.pdf28 Jul 2017
Building plan approvalFile: Studio High 5 Phase 2_Approval 001_to_005.pdf18 Jul 2017
Copy of the legal title reportFile: compressed_Search Report Plot No 105_001 (14 files merged).pdf18 Jul 2017
Details of encumbrancesFile: DoEncumbrances General Declaration (4 files merged) (1).pdf18 Jul 2017
Building Plan Approval (IOD)File: Studio High 5 Phase 2_Approval 001_to_005.pdf18 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC_STUDIO HIGH 5 PHASE 2_Page 001 (6 files merged) (1).pdf18 Jul 2017
Declaration in FORM BFile: Declaration in Form B Page 01 (4 files merged).pdf18 Jul 2017
Proforma of Allotment letterFile: RERA A L__A O S.pdf18 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 22 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep STUDIO HIGH 5 Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHAMOTE5,900+ in Raigarh

2 kmSTUDIO HIGH 5 Phase 2Completed 77Lapsed / revoked 47Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 180 registered projects within 2 km.

Builder: RAMSHIROMANI LURKHUR YADAV

RAMSHIROMANI LURKHUR YADAV has 3 registrations on MahaRERA, including STUDIO HIGH 5 Phase 2 and Studio High 5 Phase 3 Wing E Luxe. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if STUDIO HIGH 5 Phase 2 is delayed beyond 31 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of STUDIO HIGH 5 Phase 2?

The registered promoter entity is RAMSHIROMANI LURKHUR YADAV, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in STUDIO HIGH 5 Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for STUDIO HIGH 5 Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at STUDIO HIGH 5 Phase 2?

The professionals named in the filing: Architect: Satish V Kanade; Engineer: ATUL KUDTARKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in STUDIO HIGH 5 Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About STUDIO HIGH 5 Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save STUDIO HIGH 5 Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.