Completed No litigation declared Residential / Group Housing project

SRUSHTI RESIDENCY BUILDING E

By Pappu Developers & Group

RG-MH-29282 · RERA P51700028176 · Last updated on MahaRERA portal: 8 Jul 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

SRUSHTI RESIDENCY BUILDING E is a Residential / Group Housing project by Pappu Developers & Group in Thane, Maharashtra, registered with MahaRERA as P51700028176 on 10 Feb 2021. The registration is recorded completed; possession was promised by 30 Jun 2024.

At a glance

Project

  • NameSRUSHTI RESIDENCY BUILDING E
  • TypeResidential / Group Housing
  • Location
    • 90 FEET KALYAN ROAD
    • KANCHANGAON THAKURLI
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700028176
  • ReraGenie IDRG-MH-29282

Builder

  • NamePappu Developers & Group
  • Entity typePartnership
  • PartnersDattatray Motiram Gaikwad, Krishna Motiram Gaikwad, Motiram Raghunath Gaikwad, Bhawgan Atmaram Bhoir, Vishwanath Bhagwan Bhoir, Prabhakar Bhagvan Bhoir, Megha Prabhakar Bhoir
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredFeb 2021PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Feb 2021
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SRUSHTI RESIDENCY BUILDING ENA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SRUSHTI RESIDENCY BUILDING E: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered14
Open Space11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,905 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
MARUTI DEVELOPERSKalyan-Dombivali (M Corp.)Thane

Approvals and building plan

Permissible FSI1905.2
Proposed, not sanctioned1,905 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJ BUILDING GROUND FLOOR D WARD ATHMARAM NAGAR LOKGRAM KALYAN EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJEEV TAYSHETE AND ASSOCIATES
EngineerSHANTI CONSULTANTS
Chartered AccountantSALUNKE AND ASSOCIATES
PartnerRole in project
Pappu Developers & Group-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jul 2024

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complection Certificate.pdf8 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 .pdf8 Jul 2024
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf29 Jun 2024
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf29 Jun 2024
Declaration about Commencement CertificateFile: 1 Commencement Certificates _ NA Order for plotted development.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 April 23 to June 23.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 for jan 23 to mar 23.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 for oct 23 to Dec 23.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 July 23 to Sep 23.pdf29 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 for April to June 23.pdf29 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 for jan 23 to mar 23.pdf29 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 July to sep 23.pdf29 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 oct to dec 23.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2A for 20 - 21.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From 2A for 20 - 21.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: From 2A for 21 - 22.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A 22 - 23.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2A 23 - 24.pdf29 Jun 2024
CERSAI detailsFile: Disclosure of Interest in other Real estate org.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 for Apr 2023 to June 2023.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 for jan 23 to mar 2023.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 for July 23 to sep 23.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 For oct 23 to dec 23.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real estate org.pdf29 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 .pdf29 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account Details .pdf29 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation Report wrt allotment letter .pdf29 Jun 2024
Deviation Report with respect to Allotment letterFile: Alottment Letter.pdf29 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report wrt model copy of agreement .pdf29 Jun 2024
Deviation Report with respect to model copy of AgreementFile: SALE AGREEMENT.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2122.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2122.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cer.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng CER.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER.pdf18 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PR3 Arc cer.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PR2 Eng Cer.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PR3 Eng Cer.pdf13 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PR2 CA Cer.pdf13 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PR3 CA cer.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PR2 Arc Cer.pdf12 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold flat list Srushti Res E.pdf28 Jul 2021
Layout approvalFile: LAYOUT wing.pdf29 Jan 2021
Building plan approvalFile: BUILDING PLAN APPROVAL_compressed.pdf29 Jan 2021
PAN CardFile: PDG - PAN.pdf29 Jan 2021
Copy of the legal title reportFile: title and serach report.pdf29 Jan 2021
Copy of the legal title reportFile: title and search report2.pdf29 Jan 2021
Details of encumbrancesFile: NO ENCUMBRANCES AND LITIGATION DECLARTION.pdf29 Jan 2021
Copy of Layout Approval (in case of layout)File: LAYOUT wing.pdf29 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN APPROVAL_compressed.pdf29 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: CC - SR 'E' wing.pdf29 Jan 2021
Declaration in FORM BFile: Form B- PDG.pdf29 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf29 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE.pdf29 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A certificate_compressed (1).pdf29 Jan 2021
Proforma of Allotment letterFile: ALLOTMENT: POSSESSION LETTER.pdf29 Jan 2021
Proforma of Allotment letterFile: SALE AGR-SRUSHTI RESIDENCY E WING (1).pdf29 Jan 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sahajeevan Residency B WingTisgaon Naka Opp Prasad Hotel Kalyan East 421306101CompletedApr 2017Apr 2017
Sahajeevan Residency A WingTisgaon Naka Opp Prasad Hotel Kalyan East 421306101CompletedOct 2015Oct 2015

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SRUSHTI RESIDENCY BUILDING E on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANCHANGAON THAKURLI7,600+ in Thane

2 kmSRUSHTI RESIDENCY BUILDICompleted 38Lapsed / revoked 30Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: Pappu Developers & Group

Pappu Developers & Group has 2 registrations on MahaRERA, including Sahajeevan Residency Bldg 2, C-Wing and SRUSHTI RESIDENCY BUILDING E. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SRUSHTI RESIDENCY BUILDING E is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SRUSHTI RESIDENCY BUILDING E?

The registered promoter entity is Pappu Developers & Group, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SRUSHTI RESIDENCY BUILDING E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SRUSHTI RESIDENCY BUILDING E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SRUSHTI RESIDENCY BUILDING E?

The professionals named in the filing: Architect: RAJEEV TAYSHETE AND ASSOCIATES; Engineer: SHANTI CONSULTANTS; Chartered Accountant: SALUNKE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SRUSHTI RESIDENCY BUILDING E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SRUSHTI RESIDENCY BUILDING E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SRUSHTI RESIDENCY BUILDING E to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.