Completed No litigation declared Others project

Srishti Imperia

By Neeraj Mohan Desai

RG-MH-38892 · RERA P52900047188 · Last updated on MahaRERA portal: 9 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
15 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

Srishti Imperia is a Others project by Neeraj Mohan Desai in Sindhudurg, Maharashtra, registered with MahaRERA as P52900047188 on 11 Oct 2022. The registration is recorded completed; possession was promised by 5 Jul 2027. 26 of the 41 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSrishti Imperia
  • TypeOthers
  • Location
    • Hotel Ruchi
    • BajarPeth
    • Sawantwadi (M Cl)
    • Sawantwadi
    • Sindhudurg
    • 416510
  • Pincode416510
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900047188
  • ReraGenie IDRG-MH-38892

Builder

  • NameNeeraj Mohan Desai
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2022PromisedJul 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Oct 2022
  • Promised completion5 Jul 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

63%26 of 41 units booked
98.2%Work done, per cost certificate

Figures as on 9 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SRISHTI IMPERIANA98271441

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SRISHTI IMPERIA: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered1
Open Space23

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area842 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
Declared on9 Jun 2025
LandownerVillageDistrict
Anuradha Mohan Amonkar-South Goa
RAMA RAMCHANDRA PAIAndheriMumbai Suburban
DEEPAK KHADERAO DHONGADE-West
RAVINDRA KHANDERAO DHONGDEAurangabad (M Corp.)Aurangabad
CHARUDATTA YASHWANT RAJADHYAKSHASawantwadi (M Cl)Sindhudurg

Approvals and building plan

Sanctioning authoritySawantwadi Munciple Council
Permissible FSI2154.05
Proposed, not sanctioned2,154 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALA NO 64 TO 69 ,RAMESHWAR PLAZA,Sawantwadi
Estimated costRs 4.71 cr
Cost incurredRs 4.62 cr
Work done98.2%
BuildingWingEstimatedIncurred
SRISHTI IMPERIANARs 4.15 crRs 4.15 cr
-NARs 56.45 lakhRs 47.98 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYESHWANT A NAIK
ArchitectSohan J Sawant
EngineerYESHWANT A NAIK
EngineerYeshwant Naik
EngineerVaishali Ankush Gawade
Chartered AccountantSUDHIR NAIK
Chartered AccountantS V MODAK AND CO
PartnerRole in project
Neeraj Mohan Desai-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1 June 25 Architect.pdf9 Jan 2026
Withdrawal Update Form 1File: 1 June 25 Architect.pdf9 Jan 2026
Withdrawal Update Form 1File: 1 June 25 Architect.pdf9 Jan 2026
Withdrawal Update Form 1File: 1 June 25 Architect.pdf9 Jan 2026
Withdrawal Update Form 2File: 4 June 25 Engineer.pdf9 Jan 2026
Withdrawal Update Form 2File: 5 Sep 25 Engineer.pdf9 Jan 2026
Withdrawal Update Form 2File: 5 Sep 25 Engineer.pdf9 Jan 2026
Withdrawal Update Form 2File: 5 Sep 25 Engineer.pdf9 Jan 2026
Withdrawal Update Form 3File: 7 June 25 CA.pdf9 Jan 2026
Withdrawal Update Form 3File: 8 Sep 25 CA.pdf9 Jan 2026
Withdrawal Update Form 3File: 8 Sep 25 CA.pdf9 Jan 2026
Withdrawal Update Form 3File: 8 Sep 25 CA.pdf9 Jan 2026
Occupational CertificateFile: oc.pdf9 Jan 2026
Form 5 (FY 2024-2025)File: CA Certificate No 5 F Y 2024-25.pdf19 Nov 2025
Form 1File: 2 Dec 22 Architect.pdf11 Jun 2025
Form 2File: 2 December 2022 Engineer.pdf11 Jun 2025
Form 3File: 2 December 2022 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 1 Dec 22.pdf11 Jun 2025
Form 1File: 3 March 23 Architect.pdf11 Jun 2025
Form 2File: 3 March 2023 Engineer.pdf11 Jun 2025
Form 3File: 3 March 2023 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 2 March 23.pdf11 Jun 2025
Form 1File: 4 June 23 Architect.pdf11 Jun 2025
Form 2File: 4 June 2023 Engineer.pdf11 Jun 2025
Form 3File: 4 June 2023 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 3 June 23.pdf11 Jun 2025
Form 1File: 5 Sep 23 Architect.pdf11 Jun 2025
Form 2File: 5 September 2023 Engineer.pdf11 Jun 2025
Form 3File: 5 September 2023 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 4 Sep 23.pdf11 Jun 2025
Form 1File: 6 Dec 23 Architect.pdf11 Jun 2025
Form 2File: 6 December 2023 Engineer.pdf11 Jun 2025
Form 3File: 6 December 2023 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 5 Dec 23.pdf11 Jun 2025
Form 1File: 7 March 24 Architect.pdf11 Jun 2025
Form 2File: 7 March 2024 Engineer.pdf11 Jun 2025
Form 3File: 7 March 2024 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 6 March 24.pdf11 Jun 2025
Form 1File: 8 June 24 Architect.pdf11 Jun 2025
Form 2File: 8 June 24 Engineer.pdf11 Jun 2025
Form 3File: 8 June 24 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 7 June 24.pdf11 Jun 2025
Form 1File: 9 Sep 24 Architect.pdf11 Jun 2025
Form 2File: 9 Sep 2024 Engineer.pdf11 Jun 2025
Form 3File: 9 Sep 24 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 8 Sep 24.pdf11 Jun 2025
Form 1File: 10 Dec 24 Architect.pdf11 Jun 2025
Form 2File: 10 Dec 2024 Engineer.pdf11 Jun 2025
Form 3File: 10 Dec 24 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 9 Dec 24.pdf11 Jun 2025
Form 1File: 11 March 25 Architect.pdf11 Jun 2025
Form 2File: 11 March 2025 Engineer.pdf11 Jun 2025
Form 3File: 11 March 25 CA.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: 10 March 25.pdf11 Jun 2025
Withdrawal Update Form 1File: March 25.pdf10 Jun 2025
Withdrawal Update Form 2File: 11 Engineer Certificate No 2 March 2025.pdf10 Jun 2025
Withdrawal Update Form 3File: C A Certificate No 3 March 2025.pdf10 Jun 2025
Form 2A (FY 2022-2023)File: 2A Certificate 2023 (1).pdf10 Jun 2025
Form 2A (FY 2023-2024)File: 2A Certificate 2024 (1).pdf10 Jun 2025
Form 2A (FY 2024-2025)File: 2A Certificate 2025 (1).pdf10 Jun 2025
Form 5 (FY 2022-2023)File: C A Certificate No 5 F Y 2022-23.pdf10 Jun 2025
Form 5 (FY 2023-2024)File: CA Certificate No 5 F Y 2023-24.pdf10 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form No 5.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold_Booked Inventory .pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: December 2022.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 2023.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2023.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: September 2023.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: December 2023.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 2024.pdf29 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C A Certificate No 5.pdf13 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation pdf.pdf3 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Sep 2022
Building plan approvalFile: PLAN-1 Compressed.PDF16 Sep 2022
Building plan approvalFile: PLAN-2 Compressed.PDF16 Sep 2022
Layout approvalFile: PLAN-1 Compressed.PDF16 Sep 2022
Layout approvalFile: PLAN-2 Compressed.PDF16 Sep 2022
Copy of Layout Approval (in case of layout)File: PLAN-1 Compressed.PDF16 Sep 2022
Copy of Layout Approval (in case of layout)File: PLAN-2 Compressed.PDF16 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: PLAN-1 Compressed.PDF16 Sep 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SRISHTI AANGAN PHASE 2BEHIND KALSULKAR ENGLISH SCHOOL SAWANTWADI 41651031CompletedMar 2026Apr 2024
SRISHTI AANGANBEHIND KALSULKAR ENGLISH SCHOOL SAWANTWADI 41651032CompletedJul 2022Sep 2021

How this compares with Sindhudurg

63%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is completed

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Srishti Imperia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BajarPeth530+ in Sindhudurg

Builder: Neeraj Mohan Desai

Neeraj Mohan Desai has 2 registrations on MahaRERA, including Srishti Imperia and DATTA SRISHTI. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if Srishti Imperia is delayed beyond 5 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Srishti Imperia?

The registered promoter entity is Neeraj Mohan Desai, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Srishti Imperia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Srishti Imperia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Srishti Imperia?

The professionals named in the filing: Architect: YESHWANT A NAIK; Architect: Sohan J Sawant; Engineer: YESHWANT A NAIK; Engineer: Yeshwant Naik; Engineer: Vaishali Ankush Gawade; Chartered Accountant: SUDHIR NAIK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Srishti Imperia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Srishti Imperia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Srishti Imperia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.