SPARKLES MITALI BUSINESS CENTRE

By SPARKLE EARTH DEVELOPER

RG-MH-07673 · RERA P51800055085 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 30%
29 of 39Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

SPARKLES MITALI BUSINESS CENTRE is a Others project by SPARKLE EARTH DEVELOPER in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055085 on 29 Feb 2024. Possession is promised by 5 Apr 2028. 10 of the 39 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSPARKLES MITALI BUSINESS CENTRE
  • TypeOthers
  • Location
    • AT MANCHUBHAI ROAD
    • MALAD (EAST)
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • RERA no.P51800055085
  • ReraGenie IDRG-MH-07673

Builder

  • NameSPARKLE EARTH DEVELOPER
  • Entity typeOthers
  • Named personVIJAY RASIKBHAI PALAN
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredFeb 2024PromisedApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Feb 2024
  • Promised completion5 Apr 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

26%10 of 39 units booked
0.3%Work done, per cost certificate

Figures as on 4 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SPARKLES MITALI BUSINESS CENTRENA7403939

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 30%.

SPARKLES MITALI BUSINESS CENTRE: 32% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor30%
Slabs of Super Structure23%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed129

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots129
Closed/Covered129

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,396 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2025
LandownerVillageDistrict
KANTABEN BABUBHAI PATELMaladMumbai Suburban
PRADEEP BABUBHAI PATELMaladMumbai Suburban
MAHESH BABUBHAI PATELMaladMumbai Suburban
PRAVINA ANANTRAI KAKADIAKandivaliMumbai Suburban
CHANDRAVADAN MANJIBHAI PATELMaladMumbai Suburban
ARUNA VIRENDRA PATEL-Ahmadabad
PANNA BIPIN PATELBorivaliMumbai Suburban
GEETA MADHUSUDAN KHAJURIAPune (M Corp.)Pune
RASIK MANJIBHAI PATELMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2166.82
Proposed, not sanctioned2,167 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 18,19,20 PLOT NO 07-K RATNA RAJUL CO-OPERATIVE HOUSING SOCIETY, M G ROAD, KANDIVALI WEST, MUMBAI, MAHARASHTRA 400067
Estimated costRs 36.99 cr
Cost incurredRs 12.42 lakh
Work done0.34%
BuildingWingEstimatedIncurred
SPARKLES MITALI BUSINESS CENTRENARs 36.99 crRs 12.42 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHIRAG S RAYANI
EngineerPRAGNESH OZA
Engineerjacob dsouza
Chartered AccountantNEHALI AND CO
PartnerRole in project
SPARKLE EARTH DEVELOPER-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600394Bhakti AchrekarSPARKLE EARTH DEVELOPER30/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 5 Apr 2028

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Plans Highlighted.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1- Mitali- Quarter -4.pdf30 May 2026
Withdrawal Update Form 1File: Form 1- Mitali- Quarter -4.pdf30 May 2026
Withdrawal Update Form 2File: From 2- Mitali - Quarter 4.pdf30 May 2026
Withdrawal Update Form 2File: From 2- Mitali - Quarter 4.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 - Mitali -Q4.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 - Mitali -Q4.pdf30 May 2026
Withdrawal Update Form 1File: Form 1 (11).pdf9 Feb 2026
Withdrawal Update Form 1File: Form 1 (11).pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 - MItali bussiness centre.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 - MItali bussiness centre.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3 (1)_11zon.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3 (1)_11zon.pdf9 Feb 2026
Withdrawal Update Form 1File: Form 1 -MItali.pdf13 Dec 2025
Withdrawal Update Form 2File: Form 2 Mitali Business Centre.pdf13 Dec 2025
Withdrawal Update Form 3File: Form 3 Mitali Bussiness centre_11zon.pdf13 Dec 2025
Withdrawal Update Form 1File: Form -1 - April 25 to June 25.pdf12 Dec 2025
Withdrawal Update Form 2File: Form 2 - April 25 to June 25.pdf12 Dec 2025
Withdrawal Update Form 3File: Form - 3 -April 25 to June 25.pdf12 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory details - Mitali Business center.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mitali business center.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf10 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 -SPARKLE MITALI BUSINESS CENTRE.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Malad - July 24 to Sept 24 Sign.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 .pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 .pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2023-2024.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Malad.pdf17 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Chirag Rayani - Malad - Apr to June 2024 - Sign.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Malad - April 24 to June 24.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Apr to June 2024.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Malad - Jan 24 to March 24.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Malad - Oct 23 to Dec 23 with Stamp Sign.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Malad - Jan 24 to March 23 with Stamp Sign.pdf17 Apr 2024
Declaration about Commencement CertificateFile: cc declaration sparkle.pdf17 Feb 2024
Other - TechnicalFile: annexure sparkle.pdf17 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 2413294_FirstCC_signed (1).pdf29 Jan 2024
Deviation Report with respect to Allotment letterFile: NO DEVIATION ALLOTMENT - Malad.pdf29 Jan 2024
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION AGREEMENT - Malad.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: final their signed.pdf25 Jan 2024
PAN CardFile: RERA Proprietorship Letter - Malad.pdf20 Jan 2024
PAN CardFile: pan card vijay palan.pdf19 Jan 2024
Declaration in FORM BFile: FORM B.pdf19 Jan 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf19 Jan 2024
Layout approvalFile: Drawing (8).pdf18 Jan 2024
Copy of the legal title reportFile: TITLE REPORT.pdf18 Jan 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE.pdf18 Jan 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE.pdf18 Jan 2024
Copy of Layout Approval (in case of layout)File: Drawing (8).pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2397836_IOD_signed.pdf18 Jan 2024
CERSAI detailsFile: CERSAI.pdf18 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI - Malad - RERA.pdf18 Jan 2024
Proforma of Agreement for saleFile: maharera agreement (8).pdf18 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Ac Letter - Malad - RERA.pdf18 Jan 2024

How this compares with Mumbai Suburban

26%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SPARKLES MITALI BUSINESS CENTRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD (EAST)6,700+ in Mumbai Suburban

Builder: SPARKLE EARTH DEVELOPER

SPARKLE EARTH DEVELOPER has 3 registrations on MahaRERA, including SPARKLE 9 and Sparkle Umadarshan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SPARKLES MITALI BUSINESS CENTRE is delayed beyond 5 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPARKLES MITALI BUSINESS CENTRE?

The registered promoter entity is SPARKLE EARTH DEVELOPER, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPARKLES MITALI BUSINESS CENTRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SPARKLES MITALI BUSINESS CENTRE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SPARKLES MITALI BUSINESS CENTRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPARKLES MITALI BUSINESS CENTRE?

The professionals named in the filing: Architect: CHIRAG S RAYANI; Engineer: PRAGNESH OZA; Engineer: jacob dsouza; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPARKLES MITALI BUSINESS CENTRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPARKLES MITALI BUSINESS CENTRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPARKLES MITALI BUSINESS CENTRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.